Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Load rating
-
Company
-
Floor Level
-
Handover or Monthly
Scaffold vicinity
-
Scaffold Vicinity
-
Sufficient public protection been provided?
-
Sufficient safeguards against electric power lines been provided?
-
Sufficient control over vehicle movement?
-
Sufficient control over crane operation
-
Sufficient controls over the storage, handling and use of hazardous substances?
-
Add media
Base
-
Base
-
Are there sufficient sole plates?
-
Sole plates of suitable material and in a serviceable condition
-
Sole plates/ base plates secure?
-
Are there sufficient base plates?
-
Are the base plates of the appropriate type?
-
Are the base plates serviceable and of suitable dimensions?
-
Add media
Scaffold Structure
-
Scaffold Structure
-
Standards bearing firmly?
-
Standards plumb (or as designed)?
-
Longitudinal standards spacing a correct?
-
Transverse standard spacing a correct?
-
Joints in standards correctly positioned?
-
Standards correctly secured (special duty or hung scaffolds)?
-
Ledgers level (or as designed)?
-
Ledgers continuous (or as designed)?
-
Lift heights correct?
-
Ledgers correctly secured?
-
Ledger joints correctly positioned ( tube and coupler scaffold)?
-
Joints in ledgers correctly secured ( tube and coupler scaffold)?
-
Sufficient transforms/putlogs?
-
Transforms/putlogs correctly positioned and secured?
-
Is the bracing adequate?
-
Is the scaffold sufficiently stable?
-
Have external and internal handrails been installed?
-
Add media
Platforms
-
Platforms
-
Scaffold have the required number of working platforms?
-
Working platforms at the required locations?
-
Catch platforms correctly positioned?
-
Platforms and supporting scaffold constructed for the appropriate duty live loads?
-
Platform dimensions suitable for the intended work?
-
Adequate edge protection?
-
Platforms correctly constructed?
-
Planks secured against wind?
-
Add media
Containment sheeting
-
Has the scaffold been designed for wind loading on any containment sheeting?
-
Fixing ties secure?
-
Any rips or tears?
-
Overlap joints satisfactory?
-
Add media
Supporting structure
-
Supporting structure in good condition?
-
Supporting structure have adequate strength?
-
Sufficient controls to prevent adverse deterioration of the supporting structure?
-
All measures to strengthen the supporting structure adequate?
-
Risk of the supporting structure being overloaded from other sources adequately controlled?
-
Add media
Access and Egress
-
Access and egress
-
Access and egress to working platforms?
-
Temporary stairways correctly installed?
-
Portable ladders of an industrial grade, serviceable and correctly installed?
-
Access ways and access platforms correctly installed?
-
Add media
General fitness for purpose
-
General fitness for purpose
-
Adequate provision for material handling?
-
Clearances between the scaffold and adjacent structures correct
-
Adequate protection from falling debris?
-
Scaffold been adequately designed to support to all attachments?
-
Are all approaches and platforms effectively lit?
-
Add media
Tie registrar
-
Tie registrar
-
100% ties tensioned?
-
Ties tensioned to manufacturer specifications?
-
Ties correctly positioned and fixed?
-
Ties fixed as per Australian Standards or engineers specifications?
-
Add media
-
Remedial action required
-
Rovera representative signed
-
Signed customer representive
-
Company
-
Select date