Information

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Load rating

  • Company

  • Handover description

Scaffold vicinity

  • Sufficient public protection been provided?

Base

  • WAS SCAFFOLD BASED OUT IN THIS HANDOVER

  • Are there sufficient sole plates?

  • Sole plates of suitable material and in a serviceable condition

  • Sole plates/ base plates secure and centered?

  • Add media

Scaffold Structure

  • Was scaffold structure erected, dismantled or altered in this handover

  • Standards bearing firmly?

  • Standards plumb (or as designed)?

  • Ledgers level (or as designed)?

  • Ledgers continuous (or as designed)?

  • Lift heights correct?

  • Ledgers correctly secured?

  • Is the bracing to plan specifications.

  • Have all ends been braced with end bracing

  • Are all braces continues from ground to no greater than 500mm below top working platform.

  • Have handrails been installed?

  • Are there any falls from heights that has not been delineated and access blocked

  • Add media

Platforms

  • Has any platform or deck been installed or dismantled in this handover?

  • Scaffold have the required number of working platforms?

  • Working platforms at the required locations?

  • Catch platforms correctly positioned?

  • Platforms and supporting scaffold constructed for the appropriate duty live loads?

  • Adequate edge protection?

  • Platforms correctly constructed?

  • Planks secured against wind?

  • IS there a deck level within 300mm of either top or bottom slab edges.

  • Have all required kick boards been installed around the perimeter?

  • Are all kick boards secured by mechanical means as primary and secured with zip ties as secondary where required.

  • have all internal kickboards been installed where there are no hop-ups, an internal handrail and there is access to the scaffold.

  • Do all stop end have kick boards

  • have all required hop ups been installed

  • have all required hop ups been installed with a tie bar

  • has any hop up not installed with a tie bar been strapped back to the scaffold (NOT USING ZIP TIES OR TIE WIRE)

  • At any accessible point s there no gaps greater than 225mm in the scaffold

  • Do all laps have a minimum of 300mm overlap onto excising decks

  • Do all lap boards outside of standards, such as on hop ups or top decks, have suitable strapping or cleating back to prevent being kicked off the scaffold.

  • Add media

Containment sheeting

  • Dose the scaffold in question required containment

  • Has the scaffold been designed for wind loading on any containment sheeting?

  • Any rips or tears?

  • Overlap joints satisfactory?

  • has the prescribed lining been installed to provided no less than 2m of containment from the highest point of works to be completed by others during this handover.

  • has the prescribed lining provided containment to all accessible areas with no gaps greater than 25mm

  • Add media

Access and Egress

  • Dose the scaffold have Access and egress

  • Access and egress to working platforms?

  • Temporary stairways correctly installed?

  • Portable ladders of an industrial grade, serviceable and correctly installed?

  • Access ways and access platforms correctly installed?

  • Has the access been fixed fix a Scoff Tag

  • Has the scaff tag been filled out

  • Add media

General fitness for purpose

  • Clearances between the scaffold and adjacent structures correct

  • Adequate protection from falling debris?

  • Scaffold been adequately designed to support to all attachments?

  • Have all decks been cleared from any loose items

  • Has all not in use scaffolded items been stacked and stored correctly out of way from others works

  • Has all lacing been supplied at no greater that 2meter increments.

  • Add media

LOADING BAYS

  • Dose this handover cover any loading bays

  • Are loading bays braced as per plans specification

  • Are loading bays signed with correct load rating as per plan

Tie registrar

  • Have ties been required, installed or removed in this Handover

  • Tie registrar

  • 100% ties tensioned?

  • Ties tensioned to manufacturer specifications?

  • Ties correctly positioned and fixed?

  • Ties fixed as per Australian Standards or engineers specifications?

  • Have ties been installed to the first node point within 2m of the top level of the containment.

  • Dose the plan request that the ties pick up both internal and external standards

  • Has any 3 board bay with 3 board hop up been installed with a tie every standard

  • Do all ties have safety checks affixed

  • Are all ties installed in a manner that is free from a trip hazard and or blocking access

  • Add media

  • Remedial action required

  • RB representative signed

  • Client Representatives Name

  • Signed customer representive

  • Company

  • Relating Carbon Copy Handover Number

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.