Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Load rating
-
Company
-
Handover description
Scaffold vicinity
-
Sufficient public protection been provided?
Base
-
WAS SCAFFOLD BASED OUT IN THIS HANDOVER
-
Are there sufficient sole plates?
-
Sole plates of suitable material and in a serviceable condition
-
Sole plates/ base plates secure and centered?
-
Add media
Scaffold Structure
-
Was scaffold structure erected, dismantled or altered in this handover
-
Standards bearing firmly?
-
Standards plumb (or as designed)?
-
Ledgers level (or as designed)?
-
Ledgers continuous (or as designed)?
-
Lift heights correct?
-
Ledgers correctly secured?
-
Is the bracing to plan specifications.
-
Have all ends been braced with end bracing
-
Are all braces continues from ground to no greater than 500mm below top working platform.
-
Have handrails been installed?
-
Are there any falls from heights that has not been delineated and access blocked
-
Add media
Platforms
-
Has any platform or deck been installed or dismantled in this handover?
-
Scaffold have the required number of working platforms?
-
Working platforms at the required locations?
-
Catch platforms correctly positioned?
-
Platforms and supporting scaffold constructed for the appropriate duty live loads?
-
Adequate edge protection?
-
Platforms correctly constructed?
-
Planks secured against wind?
-
IS there a deck level within 300mm of either top or bottom slab edges.
-
Have all required kick boards been installed around the perimeter?
-
Are all kick boards secured by mechanical means as primary and secured with zip ties as secondary where required.
-
have all internal kickboards been installed where there are no hop-ups, an internal handrail and there is access to the scaffold.
-
Do all stop end have kick boards
-
have all required hop ups been installed
-
have all required hop ups been installed with a tie bar
-
has any hop up not installed with a tie bar been strapped back to the scaffold (NOT USING ZIP TIES OR TIE WIRE)
-
At any accessible point s there no gaps greater than 225mm in the scaffold
-
Do all laps have a minimum of 300mm overlap onto excising decks
-
Do all lap boards outside of standards, such as on hop ups or top decks, have suitable strapping or cleating back to prevent being kicked off the scaffold.
-
Add media
Containment sheeting
-
Dose the scaffold in question required containment
-
Has the scaffold been designed for wind loading on any containment sheeting?
-
Any rips or tears?
-
Overlap joints satisfactory?
-
has the prescribed lining been installed to provided no less than 2m of containment from the highest point of works to be completed by others during this handover.
-
has the prescribed lining provided containment to all accessible areas with no gaps greater than 25mm
-
Add media
Access and Egress
-
Dose the scaffold have Access and egress
-
Access and egress to working platforms?
-
Temporary stairways correctly installed?
-
Portable ladders of an industrial grade, serviceable and correctly installed?
-
Access ways and access platforms correctly installed?
-
Has the access been fixed fix a Scoff Tag
-
Has the scaff tag been filled out
-
Add media
General fitness for purpose
-
Clearances between the scaffold and adjacent structures correct
-
Adequate protection from falling debris?
-
Scaffold been adequately designed to support to all attachments?
-
Have all decks been cleared from any loose items
-
Has all not in use scaffolded items been stacked and stored correctly out of way from others works
-
Has all lacing been supplied at no greater that 2meter increments.
-
Add media
LOADING BAYS
-
Dose this handover cover any loading bays
-
Are loading bays braced as per plans specification
-
Are loading bays signed with correct load rating as per plan
Tie registrar
-
Have ties been required, installed or removed in this Handover
-
Tie registrar
-
100% ties tensioned?
-
Ties tensioned to manufacturer specifications?
-
Ties correctly positioned and fixed?
-
Ties fixed as per Australian Standards or engineers specifications?
-
Have ties been installed to the first node point within 2m of the top level of the containment.
-
Dose the plan request that the ties pick up both internal and external standards
-
Has any 3 board bay with 3 board hop up been installed with a tie every standard
-
Do all ties have safety checks affixed
-
Are all ties installed in a manner that is free from a trip hazard and or blocking access
-
Add media
-
Remedial action required
-
RB representative signed
-
Client Representatives Name
-
Signed customer representive
-
Company
-
Relating Carbon Copy Handover Number
-
Select date