Information
-
Scaffold Inspection Report
-
(Year-day-month)
-
Client / Site
-
Conducted on
-
Prepared by Mike Casady
-
Location
-
Personnel
Scaffold
-
Sub base in good condition?
-
Mudsills in place?
-
Adjustable jacks/base plates?
-
Caster wheels (with brakes)
-
Engineers certificates on record?
-
Unused components correctly stored
-
Mesh to access stairs
-
Planks (full decks)
-
Required permits on record
-
Toe boards installed
-
Handrails installed
-
Mesh guards installed
-
Access provided (ladders etc)
-
Ladder secured
-
Access stairs with handrails
-
Scaffold tag displayed
-
Scaffold clean/clear for access
Scaffolder inspection
-
Correct number of work platforms
-
Ties and lock pins in place?
-
Diagonal, transverse and plan bracing
-
Planks lapped to regs
-
Correct distance from electrical (to regs)
-
Diagonal bracing
-
Correct distance from workface
-
Scaffold not overloaded
-
Competent person on site?
-
Engineers report required?
-
Calculations and Design criteria recorded?
Final Comments:
-
Final Comments:
-
Safety Director:
-
Superintendent: