SSF 029 Tower Scaffold Inspection Report
-
The Work at Height Regulations 2005 require that an inspection of a tower scaffold be carried out by a competent person and inspection be recorded and given to the person it was carried out for, these inspections must be carried out at certain timings as follows.
-
This Inspection Report refers to one of the following
- The tower has been taken into use for the first time
- It's been more than 7 days since the previous inspection
- There has been a substantial alteration to the tower
-
Details of the Tower Scaffold
-
Supplier
-
Manufacturer / Model / Reference No. (if known)
-
Platform Height (metres)
-
Type of tower
-
Safe working load of the tower (KG)
-
Safe working load of the platform (KG)
Inspection Checklist
-
Inspect the following component parts and indicate with a Pass or Fail if fit for purpose
-
Castors / Baseplate
-
Base Horizontals
-
Diagonal Braces
-
Guardrails
-
Tower Vertical
-
Platforms
-
Toe Boards
-
Stabilisers
-
Outriggers
-
Plain Frames
-
Ladder Frames
-
Interlocking Clips
-
Indicating Tag on Tower
-
ONLY SIGN-OFF IF THE TOWER IS FIT FOR PURPOSE.
-
PASMA No. of person sign-off this inspection
-
Name & Signature
Site Supervisor Sign-off
-
Add signature
-