Information
-
SF-SHEQ-Trail Document
-
Inspection no.
-
Title
-
Client & Site
-
Project Type
- Housing
- Construction
- M & E (Industrial)
-
Project Description
-
Conducted on
-
Prepared by & Position.
-
Personnel on site
Introduction
-
The Following audit was conducted to monitor performance in line with the Work at Height Regulations and compliance with NASC guidance.
The audit is assessed on a points per item system.
4 - Best Practice
3 - Good Practice
1 - Requires action - Not an unsafe condition but does not conform to best practice.
0 - Requires Immediate Action.
NA - Item not applicable to project.
The audit is separated into 24 different specific sections.
This makes up the overall score which is given on the summary section and is categorised as Poor, Average, Good or Exemplary.
1.0 - Signing in and out
-
1.1 - Is there evidence available that All Scaffold operatives working on site inducted and evidence they are signed in?
-
1.2 - Have operatives completed all of the details on the sign in & out sheet correctly?
2.0 - Risk Assessments & Method Statements
-
2.1 - Have site specific Risk Assessments & Method Statements been conducted for all scaffolding operations on site?
-
2.2 - Is there Evidence of Communication & Understanding of the RAMS?
-
2.3 - Are the Risk Assessments and method Statements suitable for the Task?
-
2.4 - Does the PC require Point of Work Risk Assessments and are they being conducted?
-
2.5 - Is there a requirement for permit to work?
-
2.6 - Permit Type
3.0 Training
-
3.1 - Are all personnel competent to carry out the operations they are undertaking, and confirmed?
4.0 - Plant & Equipment
-
4.1 - Are compliance sheets available for all relevant items of Plant & Equipment?
-
4.2 - Are pre-use checks being conducted where required?
5.0 - Design Drawings & TG20 Compliance Sheets
-
5.1 - Are TG20 or Manufacturers Compliance Sheets Available for all different types of Scaffold on site.
-
5.2 - Do Scaffolds Comply with the manufacturers and TG 20 Compliance sheet requirements.
-
5.3 - Are Designs Available for structures that are non-standard?
-
5.4 - Has the scaffold been erected in accordance with the design provided?
-
5.5 - Are drawings adequate?
6.0 - Handovers & Inspection
-
6.1 - Are Handover certificates completed for scaffolds in use?
-
6.2 - Are the details on the handover suitable & sufficient?
-
6.3 - Are scaffold Inspections being conducted and to the correct frequency?
7.0 Toolbox Talks
-
7.1 - Is there Toolbox talks being conducted to the correct frequency?
8.0 PPE (Excluding Fall Arrest Equipment)
-
8.1 - Are all Operatives Wearing Suitable PPE on Site
-
8.2 - Is all PPE in suitable condition.
9.0 - Footings.
-
9.1 - Are the footings provided suitable for their intended purpose?
-
9.2 - Are Sole Boards suitable size and in good condition? (Check PC Requirements)
10.0 - Standards & Legers.
-
10.1 - Are all the standards and ledgers correctly plum or level within the allowed tolerance?
-
10.2 - Are all joints staggered? Modular type scaffold are joint in accordance with manufacturers requirements?
-
10.3 - Are the lift heights and bay sizes compliant with Compliance sheet details?
-
10.4 - Are all ledgers connected adequately?
11.0 - Transoms
-
11.1 - Is there a Main transom fitted within 300mm of the node point?
-
11.2 - Are the spacings of transforms correct on boarded and non-boarded lifts?
-
11.3 - Are all transoms flush or past the coupler 25mm, Fitted with Putlogs to ledger or R/A Coupler to standard?
-
11.4- Modular Scaffolds - Are transoms fitted correctly and secured properly into joint section?
12.0 Ledger, facade and plan bracing.
-
12.1 - Is all bracing connected within 300mm of the node point?
-
12.2 - Is bracing connected at the correct intervals with suitable sized tube?
-
12.3 - Does the scaffold have the correct number of bracing and at the right intervals?
13.0 Fittings.
-
13.1 - Are all fittings in a suitable condition?
14.0 - Ties.
-
14.1 - Are all ties connected at the correct intervals and have tie tags where applicable?
-
14.2 - Have preliminary pull tests been carried out?
-
14.3 - Have proof pull tests been carried out?
15.0 - Boarded lift.
-
15.0 - Are there excessive materials left on the boarded lift?
-
15.1 - Are there any gaps or notches in the boards?
-
15.2 - Are all boards that are 2.13m and under suitably secured?
-
15.3 - Do all standards project a minimum of 1m through the lift?
-
15.4 - Are all inside boards suitably secured?
16.0 - Handrails, toe boards & Brick guards.
-
16.1 - Are handrails and toe boards fitted where there is a risk of persons or materials falling?
-
16.2 - Are handrails and toe boards joined correctly and at the correct height?
-
16.3 - Are handrails and toe boards correctly fitted?
-
16.4 - Are brick guards in a good condition and suitably secured?
-
16.5 - Is there a requirement for debris netting or mono flex and is it fitted correctly?
17.0 - Access, scaff tags and signage.
-
17.1 - Is the means of access suitable according to client spec and ideally located including doorway access?
-
17.2 - Are scaff tags located at all access points of the scaffold?
-
17.3 - Is all necessary information given on the scaff tags?
-
17.4 - Is all the necessary signage on display?
18.0 - Rubbish chutes?
-
18.1 - Are rubbish chutes fitted correctly as per TG3 and at suitable intervals?
19.0 - Housekeeping.
-
19.1 - Are all spare materials in a neat and tidy condition?
-
19.2 - Is there a suitable lay down area and is it in a tidy condition?
20.0 - SG4:15
-
20.1 - Does the scaffold appear to have been erected in accordance with SG4:15?
-
20.2 - Is all Collective fall arrest equipment in a suitable condition?
-
20.3 - Is all personal fall prevention equipment in a good condition?
21.0 - Projecting tubes.
-
21.1 - Have all projecting tubes been kept to a minimum and protective caps fitted?
22.0 - Overhang of tube & boards.
-
22.1 - Is there evidence of excessive overhang of tube?
-
22.2 - Is there evidence of excessive overhang of boards?
23.0 - Welfare.
-
23.1 - Are the welfare facilities suitable and sufficient?
24.0 - Permits.
-
24.1 - Is there a need for a permit?
-
24.2 - Does the permit have all the correct information on it?
Summary.
-
Please provide a summary and an overall score for this inspection.
-
Inspector.
-
Site/Project Representative.
Corrective Actions Required.
-
undefined
-
Contract manager to sign.
Close out time.
-
undefined