Erection & Dismantling
-
Only trained, competent persons involved
-
*Daily Assessment: Need for & feasibility of fall protection. ( During the complete time frame of scaffold erection and/or dismantling, this daily assessment must be made and this checklist signed and dated)
-
Hard hat always worn<br>
-
Other PPE as appropriate; steel toed boots, gloves, eye protection
-
Supported scaffold poles, legs, posts, frames, and uprights resting on base plates and mud sills or other adequate firm foundation
-
Add media
-
Frames, legs, braces: plumb, level and secure
-
Add media
-
Locking Pins: in place and secure
-
Created planks used or planks extend at least 6" and not more then 12" over support.
-
Add media
-
Planks over 10' do not extend more then 18" over support
-
No more then 1" space between platform units as well as uprights
-
Add media
-
Supported scaffold with height to base width greater than 4:1 restrained by guying, tying, bracing, or equivalent means.
-
Add media
-
Safe distance from power lines: <br><br>Insulated Lines:<br>1. Less then 300 Volts: 3 feet<br>2. 300 volts to 50kv: 10 feet<br>3. More then 50kv: 10 feet plus .4" for each 1 kv over 50 kv<br><br>Uninsulated lines:<br>1. Less then 50kv: 10 feet<br>2. More then 50kv: 10 feet plus .4" for each 1kv over 50kv
-
Add media
-
Above 10'; installation of guard rails, mid rails, toe boards
-
Add media
-
Above 2'; access if provided by stairs, ladder, ramp,...
-
Add media
-
Components inspected: defective items removed from site
-
Add media
-
If appropriate, warning signs, barricade tape in place. This would be need if work is commencing on 2 or more scaffolds high.
-
Add media
-
Temporary wiring clear of employee & vehicular traffic
-
Add media
-
Guard rail systems [ on all *open sides and ends] installed before scaffold released for employee use<br>* An open side is greater then 14" from the face of the work except:<br>1. For plastering and lathing, it is greater then 18" from the face of the work<br>2. For outrigger scaffolding, it is 3" from face of work
-
Add media
Scaffold Use
-
Daily Inspection by competent persons. Is this recorded?
-
Only trained employees on scaffolding
-
Hard hats always worn
-
Employees not standing on guardrail a or mid rails or cross rails
-
Employees not standing on boxes or step ladders on scaffold to gain height
-
Add media
-
Potential falling objects, to large to be contained by toe-boards, mess, etc.. Will be placed away from edge.
-
Scaffolds will not be loaded above there capacity. Under no circumstances will platforms deflect more then 1/60 the span when loaded
-
Add media
-
Scaffold planks are in good condition.
-
Add media
Other
-
NAVFAC jobs have correct red or green scaffold tag indication
-