Title Page

SCBA - Unit #4

  • Select the month(s) which indicate the element passes inspection. When a deficiency has been identified, note it at the bottom of this form

  • 1. Mask and hose - Examine for contamination, damage, and deterioration

  • 2. Stretch hose Mask and hose - Check for lightness of assembly and cracking

  • 3. Examine harness for wear and function of hardware.

  • 4. Test unit as worn (regular hooked up to cylinder)

  • a) Check cylinder gauge for full indication

  • b) Open cylinder valve, filling regulator and hose

  • c) Close cylinder valve. Compare regulator gauge to cylinder gauge (+50 pal allowable)

  • d) Watch regulator gauge for drop in reading which would indicate leakage. (one increment on gauge in 5 mins is allowable)

  • e) Breathe unit down until Pak Alarm starts. Check regulator gauge for indication of pressure. Alarm should start at about 1/4 full.

  • f) Close yellow knob; open and close cylinder valve

  • g) Slightly breathe on regulator to check shut-of of yellow know (On-Off Valve). Regulator should not flow.

  • h) open yellow know full and lock

  • i) Open red knob (bypass) and bleed off pressure

  • j) Close red knob. Replace unit in ready

Deficiencies

  • Note the definiency, the date identified, the proposed corrective aciton, and the anticipated date of correction below.

  • Deficiency:

  • Date Identified:

  • Corrective Action:

  • Completion Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.