Dispatch Location:
- 1165 Massachusetts Avenue (EMC2 Dispatch Control Room) Dorchester, MA 02125
-
ERP
SDS TURNOVER
-
Turnover Date and Time:
-
Shift:
- 0500 - 1700
- 1700 - 0500
- 0600 - 1400
Topics of Safety Discussion
-
Observations and safety awareness discussions:
- Multi-Shift Fatigue
- 3 Part communication
- Pre-Switch briefing importance and clear understanding
- Night driving
- Manhole check discrepancies
- Enviromental hazards
- Lines of demarcation
- Testing for potential
- Focusing on one task at a time
- Switching checked and signed
- OMS Modeling
- SD/DD/BPSCC effective communication
- Voltage regulation
- Worker protection
- Department resources and updates
- Accident review
- Contractor/Customer access
- Load Monitoring
- Phase check and marks
- ERP protocol
- Safety stand down
- Turn over details
- Storm Preparation
- Training
Switching and tagging review
-
* Safety is Number One
* Double Check All Switching and Have it Signed
* Give Clear and Professional Switching Orders and have Three Way Communication - "This is a switching order".
* Focus on one task at a time
* Give a clear concise Pre-Switch Brief Discussion
* If any doubts arise regarding the Qualifications or Knowledge of an Employee - "Stop and notify your Supervisor"
Shift Employees
-
Attendees:
- Danna, Robert
- Hughes, Richard
- Williams, Paul
- Jordan, Mark
- Gibbons, James
- Long, James
- Crosscup, David
- Murphy, Brian
- Leavitt, Daniel
- Meekins, Gregory
- Dalton, John Jr.
- Downs, Thomas
- Everett, Steve
- Burke, Sean
System Supervisor Daily Task List and Turnover Sheet
-
Task completed during watch:
- Pre Shift Brief
- Review System Summary
- Review Planned work with BPSCC
- Review Planned work with DDS
- Review Reclosing Request
- Switching Observation Report
- Review N-2 Contingency Switching
- Review ongoing jobs to track progress
- Morning call to M & C and Station Ops.
- 0800 Company Conference call
- 1330 Conference call
- Review Condition Summaries in OMS
- NRA Non-reclosing Assurance Tags
- Reclosing Disabled Tags
- Do Not Operate Tags
- Master Work Tags
- Deactivate Scan/Manual Entries
- Inhibited Alarms
- Acknowledged Alarms
- Reclosing Status page
- RTU page (RTU, RTU2, RTU3, T1)
- Substation Status Page (SS)
- Tap Changer Page for Voltage (TC)
- Cap Bank Page (cd)
- SAS Alarms
EOSUM
EOSUM TOP OFF SCHEDULES
-
O/S Trouble:
Trouble Off Schedule Event:
-
Line/Circuit/Feeder/Equipment
-
Event #:
-
OS Link:
-
Description:
-
Repairs:
-
Jointing:
-
Grounding Locations:
-
Phasing Locations:
-
Progress:
-
Clearances:
Clearance:
-
Clearance ON:
-
Clearance OFF:
-
Clearance Holder:
-
Clearance Reason:
- Fault Locating
- Cable Work
- Splicing
- Station Work
-
Notes:
-
Media
Media/Drawings/Prints/Attachments
-
Add media
-
O/S Permit:
Permit Off Schedule Event:
-
Event #:
-
OS Link:
-
Permit #:
-
Permit Link:
-
Description:
-
Progress:
-
Clearances:
Clearance:
-
Clearance ON:
-
Clearance OFF:
-
Clearance Holder:
-
Clearance Reason:
- Fault Locating
- Cable Work
- Splicing
- Station Work
NOTES
-
Notes:
EOPOST
EOPOST PERMITS/REQUEST
ACTIVE
-
Bulk Power:
Permit/Request:
-
Event #:
-
OS Link:
-
Permit #:
-
Permit Link:
-
Description:
-
Estimate Prelim Start Time:
-
Estimate Work Start Time:
-
Estimate Work Finish Time:
-
Progress:
-
Attachments:
-
*Notes:
-
System Dispatch:
Permit/Request:
-
Event #:
-
OS Link:
-
Permit #:
-
Permit Link:
-
Description:
-
Estimate Prelim Start Time:
-
Estimate Work Start Time:
-
Estimate Work Finish Time:
-
Progress:
-
Attachments:
-
*Notes:
-
System / Distribution Dispatch:
Permit/Request:
-
Event #:
-
OS Link:
-
Permit #:
-
Permit Link:
-
Description:
-
Estimate Prelim Start Time:
-
Estimate Work Start Time:
-
Estimate Work Finish Time:
-
Progress:
-
Attachments:
-
*Notes:
UPCOMING
-
Bulk Power:
Permit/Request:
-
Event #:
-
OS Link:
-
Permit #:
-
Permit Link:
-
Description:
-
Estimate Prelim Start Time:
-
Estimate Work Start Time:
-
Estimate Work Finish Time:
-
Progress:
-
Attachments:
-
*Notes:
-
System Dispatch:
Permit/Request:
-
Event #:
-
OS Link:
-
Permit #:
-
Permit Link:
-
Description:
-
Estimate Prelim Start Time:
-
Estimate Work Start Time:
-
Estimate Work Finish Time:
-
Progress:
-
Attachments:
-
*Notes:
-
System / Distribution Dispatch:
Permit/Request:
-
Event #:
-
OS Link:
-
Permit #:
-
Permit Link:
-
Description:
-
Estimate Prelim Start Time:
-
Estimate Work Start Time:
-
Estimate Work Finish Time:
-
Progress:
-
Attachments:
-
*Notes:
NOTES
FYI Notes
-
NOTES:
FYI
-
Completed by: