Title Page

  • Job Name & Address

  • Conducted on

  • Job Number

  • Prepared by

  • Deltron Lifts
    Elevator House
    Britannia Street
    Tividale
    Birmingham
    B69 2PG

    Telephone: 0330 124 2169
    Email: info@deltronlifts.co.uk

Deltron Lifts Ltd: Service lift test and Examination Report to BS EN 81-3:2008.

  • Site Address
  • Installation Contract Number

  • Lift Number

  • Contract Speed

  • Power Supply

  • Lift Model

  • Number of Stops

  • Motor RPM

  • Contract Load

  • Travel Distance

  • Winding Unit

Electrical Safety Devices

  • Pit Stop Switch

  • Overspeed Device

  • Overspeed Governor Rope

  • Safety Rope

  • Slack Rope/Chain Switch

  • Mains Isolator

  • Is Mains Isolate Fused

  • Is Mains Isolator Lockable

  • Is Journy Run Timer Fitted

  • Overload Set and Tested

  • Safety Circuit Fuse or Breaker

  • Stopping Device

  • Overtravel Limits

Door Locking and Activating Ramps

  • Mechanical Landing Door Lock Devices

  • Electrical Landing Door Lock Contacts

  • Pre Locks

  • Car Door Electrical Switches

  • Retiring Ramps

  • Fixed Ramps

  • Landing Door Emergency Release Mechanisms

Suspension System

  • Ropes Fitted Correctly & Equalised

  • Rope Terminations Checked

  • Chains Fitted Correctly

  • Chain Terminations Checked

Brake System

  • Brake Test Under Normal Load Conditions

  • Brake Test With 125% Of Rated Load

Measurements of Current Or Power and Speed Of Lift

  • Actual Power Supply - Voltage, Phases, Neutral and Hz

  • Actual Motor Amps

  • Earth Continuity

  • Does earthing the most remote landing lock cause the fuse to trip without delay ?

  • Does the Phase Failure operate

  • speed of car with half contract load in downward direction

  • In mid travel does the car exceed the rated speed by more than 10%

  • Check that the car Cannot be raised when the counterweight rests of the buffers

  • Top final limit distance

  • Bottom final limit distance

Checking of Traction

  • Car Stopped empty travel - Distance of travel in MM

  • Car Stopped half contract load - Distance of travel in MM

  • Car stopped 125% of rated load - Distance of travel in MM

Checking of Balance

  • Load test Current

  • Ok

  • Empty Car Up Current

  • Ok

  • Empty Car Down Current

  • Ok

  • Full Load Up Current

  • Ok

  • Full load Down Current

  • Ok

Overspeed Governor

  • Car Travelling in Down Direction

  • Counterweight Travelling in Down Direction

  • Note - The tripping of the Overspeed governor for the car should be 115% of the rated speed up to 0.63m/s

    The tripping speed of the speed of the Overspeed governor of the car should be 125% of the rated speed exceeding 0.63m/s

    The tripping speed of an Overspeed governor for a counterweight/balance weight safety gear shall not be higher than that of the car safety gear, not however exceeding it be more than 10%

Car/Counterweight or Balance weight Safety Gear

  • Check the correct mounting, setting and soundness of the complete assembly

  • Car

  • Safety Gear Guide Rails

  • Counterweight ‘Balance Weight

  • Structure

  • Fixings and fixing to building

  • Car Safety Gear Test

  • Counterweight / Balance weight safety gear test

  • On completion of the above tests, check that no Deterioration has occurred that could adversely affect the normal use of the service lift.

Final Limit Switches

  • Final Limit Switches

  • Additional checks required

  • With the car at the top floor measure the distance between the bottom of the counterweight and top of the buffer - distance in MM

  • With the car at the bottom floor measure the distance between the bottom of the counterweight and top of the bottom of the steel work distance in MM

Other Checks

  • Machine room 240vac Socket installed/connected

  • Car Sill Clearance

  • Labelling and signage

  • Electrical wiring diagrams left in machine room

  • Log card left in machine room

  • Emergency release key left in machine room

Handover Checks

  • All builders work items on GA drawings and builders notes complete

  • Are all installation items which the lift manufacturer is not responsible for in a state to allow the lift to be put into service

  • Lift demonstrated to customer including stopping at all floors

  • If the above two items are satisfactory does the lift comply with BS EN 81-3:2008

Hand Winding Demonstration Given To:

  • Names

  • Lift Keys given to:

  • Note: This is to certify that the above installation was completed and tested to BS EN 81-3:2008 ANNEX D in accordance with our contract

  • Outstanding builders works

  • Test engineers signature

  • Date of test

  • Commissioning Engineer signature

  • Date of commisioning

  • Customer Signature

  • Customers name

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.