Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Shamim Group Open & Close follow up questions
-
Close Shift follow up Questions
-
Complete a 1-minute cash in at the start of the shift
-
Check daily bread usage chart if another bake is required
-
Can perform end of day tasks on the POS
-
Retard bread for the morning following the 12 steps to perfect bread every time
-
Turn all items off including fans, lights, sandwich unit, speed oven, hot well etc.
-
Check all products are rotated, dated & in date
-
PM Temperature check is completed & logged
-
All cleaning tasks are completed on the closing checklist
-
Sink area is set up with sanitiser at the correct pH level, same with bucket & spray bottle
-
Perform a final walkthrough to ensure everywhere is clean and ready for the next morning before locking the doors
-
Open Shift follow up Questions
-
All required equipment is switched on - Oven, Sandwich Unit, Hot well
-
All Cookie flavours are baked before Bread is ready to be baked
-
Breads are being baked following the 12 steps to perfect bread every time
-
3 compartment sink is set up sanitiser is at the correct pH level, same with bucket & spray bottle
-
Demonstrates how to enter Bread Credits & Wastage
-
Check all products are rotated & in date
-
Stock the sandwich unit in order (checking dates as you add in and making a kill list)
-
Meat Balls are heated to 74 degrees before being placed in the Hot well
-
Complete open procedures on the POS money balances the same with Bread count
-
Perform a final walkthrough to ensure everywhere is clean and ready for business before unlocking the doors
-
AM temperature checks to be completed & logged