Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Administration
-
All items from previous weekly inspection checklists closed out
-
OHS management system in place
-
OH&S policies current, signed and posted
-
OH&S Co-ordination Plan & Site Safety Rules posted
-
Traffic Management Plan current & posted
-
Emergency Evacuation Plan current & posted
-
Site Layout Plan current & posted
-
Sign-in procedures enforced
-
Site-specific inductions conducted and all details recorded correctly
-
Weekly site inspections carried out
-
All plant inducted & details, including license details, recorded correctly
-
Contractors Safe Work Method Statements collected & reviewed
-
Electrical Register maintained
-
Certificates of Electrical Safety retained
-
Scaffolding Handover Certificates retained
-
Emergency Equipment Maintenance Schedule maintained (refer to SSEP)
-
Toolbox Talks conducted as required & details recorded
-
Incident / Near Miss Reports Completed
Security & Signage
-
Site is secure with 1.8m fence (2.4m for demolition sites)
-
Public areas barricaded & signposted. Fences & hoardings secured
-
Building Surveyors sign posted and completed in full
-
All signage as required by Traffic Management Plan
-
"Construction Site - Keep Out" & "All Visitors Report to Site Office" signs posted at all entrances
-
PPE and Test & Tag signs displayed at main entrance
-
First Aid Room, Site Office, Toilets & Lunch Room location
-
Fire Extinguisher locations
-
List of OH&S Representatives posted
-
"If You Are Injured" poster
Public Safety
-
Public access controlled
-
Warning signs, barricades, & lighting
-
Traffic control procedures in place
-
Dust controls in place
-
Noise controls in place
-
Public complaints recorded & acted upon
Amenities
-
Toilets clean, fully stocked and of adequate number
-
Lunchroom clean & tidy with adequate seating
-
Wash & change rooms clean
-
Sufficient number of rubbish bins in place & emptied daily
-
Cool drinking water, food warmer and fridge provided
Emergency Procedures
-
Emergency telephone numbers & clear directions to site displayed
-
Emergency alarm or air horns (2) present & operable
-
Trial evacuations conducted at 6 month intervals
-
Fire extinguishers tested & stamped at 6 month intervals
-
Lighting adequate
-
Emergency Exit signs
First Aid
-
Sufficient number of qualified First Aiders for size of job
-
First Aid Kit adequate, checked & replenished
-
First Aid table signed, kept clear & clean
-
List of First Aid Officers displayed
-
Appropriate First Aid Room / Facilities
-
First Aid Register
Housekeeping
-
Worksite clean & tidy
-
Access ways kept clear
-
Materials stacked safely & tidily
-
Materials clear of electrical hazards
-
Safe access to & around work areas
-
Free from slip, trip & fall hazards
-
Floor penetrations covered or barricaded
-
Rubbish regularly removed from work areas
-
Appropriate task safety signs used
-
Timbers de-nailed
Mobile Plant
-
Plant Induction completed
-
Maintenance & safety check log books in place & filled in daily
-
Risk Assessment provided
-
Maintenance records provided
-
Traffic Management Plan in place
-
Adequate guarding & safe operating procedures in place
-
Operated by certified or trained & competent persons
-
Registered with WorkSafe if required
-
Operated on a level surface or safe angle
-
Power Line No Go Zones observed (Refer No Go Zones section)
-
Flashing lights, reversing beepers & motion sensors
-
Fitted with ROPS & FOPS
-
Safety harnesses used in boom lifts
-
SWL displayed
-
Unattended plant safe & secure
Electrical
-
Earth Leakage Protection (RCD's Maximum 30 mA)
-
Sufficient number of switchboards in place
-
Temporary supply power boards secure, lockable, waterproof & leads through insulated base
-
Electrical equipment & leads tested & tagged quarterly
-
Moulded or transparent plugs on electrical leads
-
Electrical leads secured off ground
-
Electrical leads length not exceeding 32 metres
-
Industrial power boards with RCD's tested & tagged monthly
No Go Zones (Power Lines & Electrical Installations)
-
Unless special provisions are met, including written permission from power company, spotter provided & SWMS's completed
-
EWP's not to operate either above, within 3 metres to the side or within 5 metres of the bottom of overhead power lines. (Spotter to be provided between 3 - 6.4 metres)
-
Cranes, EWP's & all other plant not operated either above, within 3 metres to the side or within 5 metres of the bottom of overhead power lines. (Spotter to be provided between 3 - 6.4 metres)
-
Scaffolding not to be erected
Personal Protective Equipment
-
Safety Helmets
-
High Visibility Clothing / Vests
-
Reflective Vests for Traffic Management
-
Safety Footwear
-
Hearing Protection
-
Eye Protection
-
Respiratory Proection
-
U.V. Protection (Sunscreen, Sunglasses, Hats)
-
Appropriate Clothing Worn
Working at Heights (Over 2 Metres)
-
Working from Scaffolding or EWP where possible
-
Guardrails installed
-
Scaffold provided for fall protection
-
EWP provided for fall protection
-
Safety mesh provided for fall protection
-
Individual fall arrest system provided for fall protection
-
Clear of power lines
-
Floor & wall penetrations barricaded or covered
Ladders, Barricading, Handrailling & Scaffolding
-
Roof access stair tower
-
Scaffolds erected correctly complete with Access Ladder, Edge Protection, Kick Boards & Scaff-Tag
-
Adequately braced
-
Tied to Structure if required
-
Safe distance from power lines (5.0 metres below & 4.6 metres from side)
-
Mobile scaffold height less than 3X base dimension
-
Barricading / Handrailling to stairs
-
Roof Handrailling
-
Industrial rated ladders used (120kg SWL)
-
Ladders secured top & bottom & at correct angle
-
Ladders extended 0.9 metres above egress point
-
Stepladders in good condition
-
Stepladders used correctly
-
Metal ladders not used near electrical hazards
-
Surrounding area (drop zone) workers protected
Crane Operation
-
Certified Operator & Dogmen
-
Safety check logbook filled in daily
-
Crane set up safely
-
Clear of power lines
-
SWL not exceeded
-
Outriggers used
-
Lifting equipment tested & tagged
Confined Spaces
-
Personnel trained in confined space awareness
-
Entry permit completed
-
Atmospheric testing carried out
-
PPE provided
-
Standby person (Spotter)
-
Emergency procedures in place
Hot Works
-
Electric welding shields provided
-
Flashback spark arrestors fitted to oxy-acetylene regulators & blowpipe
-
Oxygen & acetylene bottles stored separately in well ventilated enclosures (3 metres apart)
-
Gas bottles secured in trolley
-
Fire extinguisher available
Compressed Air
-
Hoses & couplings secured & fitted with safety clips
-
Appropriate PPE used. (goggles, face shields, ear muffs)
Other Tools & Equipment
-
Defective tools & equipment withdrawn from use
-
Trained persons to use lasers
-
Warning signs displayed when lasers are used
Hazardous Substances / Dangerous Goods
-
MSDS's available & readily accessible to users
-
Risk Assessments done for all Hazardous Substances / Dangerous Goods
-
All labelled & correctly stored
-
Area well ventilated
-
PPE used when required
-
Personal hygiene standards maintained
-
Dangerous Goods handling procedures in place
-
Dangerous Goods manifests developed
-
Chemical handling procedures in place
-
HAZCHEM signage
-
Emergency First Aid ( Showers, Eye Wash etc.)
-
Waste disposal procedures
Manual Handling
-
Hazards & risks assessed
-
Mechanical Handling aids (e.g. cranes, hoists, trolleys etc.) provided where possible & maintained
-
Training provided about risk factors & proper techniques to perform tasks
Environmental
-
Sediment Control on Property Boundaries
-
Sediment Control on Storm Water Drains and Pits
-
Noise Control Plan in Place
-
Vibration Free Zones in Place
-
Dust Controlled
-
Paint and other chemicals stored away from storm-water / waste drains
-
HAZCHEM spill kit available for fit out works
Incidents Reported (Incident Reports Required)
-
Near Misses
-
Medical Treatment Injuries (MTI's)
-
Lost Time Injuries (LTI's)
-
Preventative / Corrective Actions