Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
SHARED SPACE CHECKLIST
SHARED SPACE CHECKLIST - TO BE COMPLETED EVERY DAY DURING WORKS
-
ALL FIRE EXIT ROUTES AVAILABLE
-
ALL FINAL EXIT DOORS AND EXTERNAL ROUTES AVAILABLE
-
ALL FIRE DOORS CLOSED EXCEPT DURING WORKS IN THAT ROOM
-
ALL EXIT CORRIDORS CLEAR OF TRIPPING HAZARDS, TOOLS, MATERIALS ETC OTHER THAN REQUIRE DOR WORK IN THAT AREA
-
ALL FLAMMABLE MATERIALS STORED SECURELY BEHIND A FIRE DOOR
-
ALL FLOOR COVERINGS SOUND AND FREE FROM TRIPPING HAZARDS
-
NO SMOKE DECTECTORS COVERED EXCEPT IN ROOMS WHERE DUST IS BEING CREATED AND REMOVED AT END OF DUSTY WORKS
-
FIRE PANEL NOT TAMPERED WITH
-
OPENINGS TO CONPARTMENT WALLS/CEILINGS RISK ASSESSED AND MANAGED
-
OPERATION OF EMERGE NCY LIGHTS, AOVs AND OTHER LIFE SAFETY DEVICES NOT AFFECTED
-
DATE AND TIME
-
NAME
-
SIGNATURE
END OF DAY SHARED SPACE CHECKLIST - TO BE COMPLETED AT END OF EVERY WORKING DAY
-
ALL FIRE DOORS CLOSED AND UNIMPEDED
-
ALL SMOKE HEAD COVERS REMOVED
-
ALL EXIT ROUTES COMPLETELY CLEAR
-
ALL TOOLS AND MATERIALS LEFT IN SECURED ROOM
-
FIRE ALARM/EMERGENCY LIGHTS AND ALL LIFE SAFETY DEVICES LEFT FULLY FUNCTIONAL
-
DATE AND TIME
-
NAME
-
SIGNATURE