Information

  • P1174/GMV

  • Concrete Pour Notification , Inspection

  • Conducted on

  • A Kris

  • Location

Concrete Pour Notification

SECTION 1 - NOTICE OF CONCRETE OPERATIONS

  • Are you in possession of the most current set of drawings on Hand?

  • Add drawing

  • Are you in possession of the approved submittal and correct mix design?

  • Time available for inspection

  • Has the BOUYGUES been notified via email that you are beginning construction for the formwork for?

SECTION 2 - PRE-CONCRETE CHECKLIST

Inspection Report

  • Formwork & Formations

  • Falsework

  • Setting Out

  • Joint Details (Movement Joints)

  • Water Proof Details Including water bar

  • Cleanliness

  • Cover to Reinforcement

  • Spacing Between Bars

  • Bar Sizes and Lab Length

  • Additional Bars (Bottom top And Sizes)

  • Share Links

  • Inserts / Built in Items

  • As Built

  • Safety/ Access

  • Permits

  • Date & Time

  • Signed for HCL

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.