Information
-
P1174/GMV
-
Concrete Pour Notification , Inspection
-
Conducted on
-
A Kris
-
Location
Concrete Pre -Pour Inspection
SECTION 1 - NOTICE OF CONCRETE OPERATIONS
-
Nature and Location of work to be inspected
-
Are you in possession of the most current set of drawings?
-
Are you in possession of the approved submittal and correct mix design?
-
Time of inspection
Concrete pre-pour Inspection :-
REINFORCEMENT and INSTALLATION
-
Cover to concrete, Spacers & Chairs as per the spec ?
-
Dimensions of prefab'd cages , Location Checked befor installing?
-
Have all the shear links installed ?
-
All the Additional Bars Installed?
-
Bar size, spacing, & Lap lengths Fixed as per drawing's? (top, Bottom & Verts)
-
Fixer forman available on the location at time of inspection?
-
Date & Time steel Inspected
-
Forman Fixture
Formwork, Falsework, Gas Memberan , Waterproofing & etc
-
As Built for Line & Levels for the location of pour?
-
AS Built For slab penetrations, Service pipes, any Built in Items ?
-
Joint details including waterbars installed per specification?
-
Temporary work design approved and Permit signed off ?
-
Temporary work coordinator
-
If the product is a wall or column, has the correct type of form with the appropriate finish been used??
-
is the area Clean from dust, debris , Broken Tieing wires?
-
is the Area safe for pour?
-
Cube Reference:-
-
HCPL Foreman
-
HCPL Engineer
CLEARANCE FOR CONCRETING
We trust this meets with your approval and ask you to sign, copy and return this form to our site office.
-
The above works are approved by BOUYGUES for concreting
-
Date & Time:
-
Signed for BOUYGUES