Information
-
Client
-
Contractor
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
This audit is in conjunction with the Occupational Health and Safety Act, 1993
(No. 85 of 1993) and CONSTRUCTION REGULATIONS, 2003. Please refer to it should you have any disputes and when closing out deviations.
Safety Management System
-
Proof of notification of construction work
-
Letter of good-standing valid
-
Health & Safety policy signed by CEO
-
Safety plan approved by project manager
-
Site instruction
-
Deviation close-out date
Legal appointments
-
CR 5(1)(k)<br>Principal Contractor<br>
-
Section 16(1)<br>CEO (Resolution)<br>
-
Section 8 (1)<br>Construction Manager<br> <br> <br>
-
CR 8 (7)<br>Construction Supervisor<br> <br> <br>
-
CR 8 (2)<br>Assistant Construction Supervisor<br> <br> <br>
-
CR 8(5)<br>Safety Officer<br> <br> <br>
-
CR 9 (1)<br>Competent Person: Risk Assessments<br> <br> <br>
-
Section 17(1)<br>Health & Safety Representative (Employee Rep.)<br> <br> <br>
-
Section 19(3)<br>H&S Committee Member (Management Rep.)<br> <br> <br>
-
GAR 9(2)<br>Incident Investigator<br> <br> <br>
-
GSR 3<br>First Aider (>10 employees; 1:50 or part thereof)<br> <br> <br>
-
EMR 9(4)<br>Portable Electrical Tools Inspector<br> <br> <br>
-
Internal Std./Specs<br>Hand Tools Inspector<br> <br> <br>
-
CR / FR<br>Welfare Facilities Inspector<br> <br> <br>
-
DMR 18<br>Lifting Equipment Inspector<br> <br> <br>
-
DMR 18<br>Lifting Machine Operator<br> <br> <br>
-
GSR 13A<br>Ladder Inspector<br> <br> <br>
-
HCSR 5(1)<br>Hazardous Chemical Substances Co-ordinator<br> <br> <br>
-
NEMA<br>Environmental Co-ordinator<br> <br> <br>
-
Site instruction
-
Deviation close-out date
Checklist & Registers
-
First Aid Dressings<br>Continuous<br> <br>
-
Personal Protective Equipment (PPE)<br>Continuous<br> <br> <br>
-
Excavations<br> <br> <br>
-
Health & Safety Representative<br>Monthly<br> <br> <br>
-
Health & Safety Meeting Minutes<br>Monthly<br> <br> <br>
-
Fire Equipment<br>Monthly<br> <br> <br>
-
First Aid Box Checklist<br>Monthly<br> <br> <br>
-
Facilities<br>Monthly<br> <br> <br>
-
Ladders<br>Monthly<br> <br> <br>
-
Portable Electrical Equipment<br>Monthly<br> <br> <br>
-
Stacking & Storage<br>Monthly<br> <br> <br>
-
Hand Tools<br>Monthly<br> <br> <br>
-
Evacuation Drill<br>Annual<br> <br> <br>
-
Hazardous Substances<br>Annual<br> <br> <br>
Incident & accident management
-
General incident report forms available
-
Annexure 1 form
-
Annexure 2 Form
-
Incidents & accident reported
-
Site instruction
-
Deviations close-out date
Emergency Management
-
Emergency numbers available
-
Emergency procedures available
-
Strike emergency plan available
-
Snake bite emergency plan available
-
Site instruction
-
Deviation close-out date
Training
-
Inductions completed
-
First Aider
-
Fire fighter
-
Safety rep
-
Site instruction
-
Deviation close-out date
Sub-contractor management
-
Sub-contractors on site
-
37.2 agreement signed/ CR 7(1)(c)(I) signed
-
Sub-contractor audit conducted
-
Site instruction
-
Deviation close-out date
Communication
-
Toolbox talks conducted
-
Monthly safety meetings conducted
-
Safety plan communicated
-
OHS Act & construction regulations visible
-
Site instruction
-
Deviation close-out date
Site Conditions
-
1:30 Male & Female ablutions
-
Ablutions serviced regularly
-
Drinking water available
-
Sufficient skips & bins available
-
Adequate fire extinguishers
-
Adequate first aid box
-
Accommodation provided off site
-
Site instruction
-
Deviation close-out date
Housekeeping
-
Lay down areas demarcated
-
Rubble removed regularly.
-
House-keeping maintained
-
Site instruction
-
Deviation close-out day
Personal protective equipment
-
Hard hats
-
Overalls
-
Iron tip leather boots
-
Reflector vests
-
Task specific PPE worn
-
Site instruction
-
Deviation close-out date
Heavy plant & vehicles
-
Plant & Machinery safe working order
-
Machinery & Vehicles licensed
-
Operators competent
-
Operator legally appointed
-
Medicals completed
-
Checklist completed
-
Risk assessment
-
Safe work procedure communicated
-
Site instruction
-
Deviation Close-out date
Road Signage
-
Speed Signs
-
Work in Progress
-
Site Instruction
-
Deviation Close Out Date
Excavations
-
Excavations Safe
-
Excavation supervisor legally appointed
-
Excavation checklist completed
-
Excavation risk assessment communicated
-
Excavation safe work procedures communicated
-
Site instruction
-
Deviation close-out date
Site instructions
-
Add media
Other findings
-
Findings
-
Corrective Action
Conclusion
-
Previous Scoring
-
Previous Deviations closed-out
-
Name of new risk assessments
-
Site compliant
-
Conclusion
-
Site manager: I acknowledge that I understand this site audit and site instructions. I will correct all deviations in the specified time frame.
-
Site safety representative: I acknowledge that I understand this site audit and site instructions. I will correct all deviations in the specified time frame.
-
RESS Auditor