Title Page

  • Conducted on

  • Prepared by

  • Project Manager / Site Manager / Site Foreman

  • Additional personnel on site

  • Scope of Works / High risk activity for audit

  • Location
  • Job Number

  • Client

  • PSCS

Closure of Previous Audits

  • Are all safety observation of the previous SHEQ audits closed?. If not list date and observation number. If Med to High Risk - then assign to team member.

Opening Summary

  • Contract Description

  • Current Top Risks onsite.

Health and Safety

  • Is the approach to the site entrance suitable and sufficient?

  • Is the white board in place and up to date with Plant and Labour and Materials deliveries:

  • Daily Risk Assessment / JSSP available and signed off by relevant staff?

  • Have all members of the working party signed into site?

  • Method Statements and Risk Assessment available and signed by relevant staff?

  • Relevant Permit in place?

  • Is there a copy of the AF2 document available and on display?

  • Is PPE being worn? (Attitude / Compliance)

  • Staff appropriately trained for the works being carried out?

  • Is there suitable site access and egress?

  • Signing / Lighting / Guarding in place where applicable?

  • Are Stop / Go boards available if required?

  • Is site security adequate?

  • Is house keeping adequate?

  • Is work on or near water properly planned?

  • Is Working at Height properly planned?

  • Have all Temporary Works Designs present on site been certified?

  • Have daily / weekly inspections of scaffold / excavations been completed?

  • Daily plant inspections completed?

  • Weekly LOLER / PUWER inspections completed?

  • Is CAT and genny calibration in place and up to date?

  • Thorough examination certifications available for all plant and equipment?

  • All slings, chains, lifting equipment serviceable with in-date certification / tags?

  • Is there an appropriate lift plan & AP in place?

  • Suitable Fire Fighting Equipment available and serviceable?

  • Suitable First Aid Kit / eye wash station available?

  • Is there a suitably trained First Aider on site and known to workers?

  • Are welfare facilities in place and adequate?

  • Is PAT testing in place and up to date?

  • Any hazards on site requiring immediate intervention?

  • Any processes or documents on site requiring immediate intervention?

  • Detail high risk activity on site:

  • Please state below any other observations identified on site:

  • Please state below any other observations identified on site:

  • Please state below any other observations identified on site:

  • Please state below any other observations identified on site:

  • Please state below any other observations identified on site:

  • Site Signage adequate along the public road / site entrances / throughout the site.

Environmental

  • All hazardous substances stored correctly? (eg drip trays)

  • All hazardous substances labelled correctly?

  • Spill kits available?

  • Waste disposed of correctly?

  • Dust and Noise control adequate?

  • COSHH assessments available?

  • Is the COSHH Storage suitable and sufficient?

  • Are all clean water drains running clear?

  • Are all SUDs on site in place and in good condition?

  • Any material stored within 10m of the water crossings?

  • Is the refueling in line with site procedures?

  • Has the weekly field samples and report being completed:

  • Please state below any other observations identified on site:

  • Please state below any other observations identified on site:

  • Please state below any other observations identified on site:

Quality

  • Have all members of the working party been inducted?

  • Quality of works to an acceptable standard?

  • Evidence of Good catch / Tool box talks?

  • Company forms used inline with ISO procedures?

  • Company policies available and adhered to?

  • Company insurance policy available and in-date?

  • Sub-contractors used for works approved in line with company procedures?

  • Verification sub-contractor has implemented a modern slavery policy and were not - is working under ACPL policy.

  • Please state below any other observations identified on site:

  • Please state below any other observations identified on site:

  • Please state below any other observations identified on site:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.