Title Page
-
Conducted on
-
Prepared by
-
Project Manager / Site Manager / Site Foreman
-
Additional personnel on site
-
Scope of Works / High risk activity for audit
-
Location
-
Job Number
-
Client
-
PSCS
Closure of Previous Audits
-
Are all safety observation of the previous SHEQ audits closed?. If not list date and observation number. If Med to High Risk - then assign to team member.
Opening Summary
-
Contract Description
-
Current Top Risks onsite.
Health and Safety
-
Is the approach to the site entrance suitable and sufficient?
-
Is the white board in place and up to date with Plant and Labour and Materials deliveries:
-
Daily Risk Assessment / JSSP available and signed off by relevant staff?
-
Have all members of the working party signed into site?
-
Method Statements and Risk Assessment available and signed by relevant staff?
-
Relevant Permit in place?
-
Is there a copy of the AF2 document available and on display?
-
Is PPE being worn? (Attitude / Compliance)
-
Staff appropriately trained for the works being carried out?
-
Is there suitable site access and egress?
-
Signing / Lighting / Guarding in place where applicable?
-
Are Stop / Go boards available if required?
-
Is site security adequate?
-
Is house keeping adequate?
-
Is work on or near water properly planned?
-
Is Working at Height properly planned?
-
Have all Temporary Works Designs present on site been certified?
-
Have daily / weekly inspections of scaffold / excavations been completed?
-
Daily plant inspections completed?
-
Weekly LOLER / PUWER inspections completed?
-
Is CAT and genny calibration in place and up to date?
-
Thorough examination certifications available for all plant and equipment?
-
All slings, chains, lifting equipment serviceable with in-date certification / tags?
-
Is there an appropriate lift plan & AP in place?
-
Suitable Fire Fighting Equipment available and serviceable?
-
Suitable First Aid Kit / eye wash station available?
-
Is there a suitably trained First Aider on site and known to workers?
-
Are welfare facilities in place and adequate?
-
Is PAT testing in place and up to date?
-
Any hazards on site requiring immediate intervention?
-
Any processes or documents on site requiring immediate intervention?
-
Detail high risk activity on site:
-
Please state below any other observations identified on site:
-
Please state below any other observations identified on site:
-
Please state below any other observations identified on site:
-
Please state below any other observations identified on site:
-
Please state below any other observations identified on site:
-
Site Signage adequate along the public road / site entrances / throughout the site.
Environmental
-
All hazardous substances stored correctly? (eg drip trays)
-
All hazardous substances labelled correctly?
-
Spill kits available?
-
Waste disposed of correctly?
-
Dust and Noise control adequate?
-
COSHH assessments available?
-
Is the COSHH Storage suitable and sufficient?
-
Are all clean water drains running clear?
-
Are all SUDs on site in place and in good condition?
-
Any material stored within 10m of the water crossings?
-
Is the refueling in line with site procedures?
-
Has the weekly field samples and report being completed:
-
Please state below any other observations identified on site:
-
Please state below any other observations identified on site:
-
Please state below any other observations identified on site:
Quality
-
Have all members of the working party been inducted?
-
Quality of works to an acceptable standard?
-
Evidence of Good catch / Tool box talks?
-
Company forms used inline with ISO procedures?
-
Company policies available and adhered to?
-
Company insurance policy available and in-date?
-
Sub-contractors used for works approved in line with company procedures?
-
Verification sub-contractor has implemented a modern slavery policy and were not - is working under ACPL policy.
-
Please state below any other observations identified on site:
-
Please state below any other observations identified on site:
-
Please state below any other observations identified on site: