Information
-
Location
-
Ellipse number:
-
Inspector:
-
Project Engineer / Site Manager
-
Site Operatives
-
Conducted On:
-
Activity or Area
Documentation
-
Policy, insurance, H&S 460, F10, CPP, H&S Law Poster, Site Rules, Site/traffic plan displayed & in date
-
Permits- Displayed / Register completed
-
RAMS / Subcontractor RAMS, approved, available, site specific, briefed & signed.
-
CoSHH Assessment available & briefed
-
Manual handling included in RAMS
-
Take Two completed
-
Passes being carried / inducted / Signing in
-
Temporary works, register, design certs, etc
-
Site managers, weekly inspection / Safety Walkabouts
-
Incident reports / near miss reporting
-
Site specific emergency plans displayed, fire / accident / incident drills carried out
-
Waste Transfer Notes available
-
Electrical installation certificate available
-
Environmental declaration
Training
-
Site induction
-
Toolbox talks
-
Site personnel / subcontractors training records or front page training summary
Welfare / first aid
-
Office, Mess Cabins, toilets, drying rooms - clean & tidy
-
First aid kit available / recorded weekly check
-
Vehicle / pedestrian segregation
-
Fire extinguishers / weekly inspected
Behaviour & attitude
-
Good behaviour / working practices observed
-
Appropriate PPE / inspected / good condition
-
Aware of hazards
-
Aware of emergency procedures / arrangements
-
Other
Tools & equipment
-
Free of visual defects / inspected & recorded weekly
-
Adequate for the job / guards fitted
-
Inspection in date (PAT test) / Calibration in date
-
Noise and vibration managed / trigger times recorded
-
Other
Work equipment
-
Housekeeping
-
Proper storage inc COSHH / diesel bowser / Quarentine
-
Free from spills, spill kits available, Drip trays / plant nappies
-
Free from surplus materials
-
Free from leaking taps / hoses / valves, etc
-
Contaminated ground, explosive atmosphere, etc
-
Adequate barriers and signs / goalposts / security
Work practices - isolation
-
Adequate for job (tagged / ID)
-
Working party lock-offs applied / ID
-
Permit - suitability / displayed / communicated
-
Personnel aware / identification energy sources
-
Area cordoned off
-
Drawings / testing inspection availability
Work Practices - Confined Space
-
Permit - suitability / displayed / communicated
-
Suitable access & egress / ladder secured
-
Personel aware / identified hazard sources
-
Topman present - duties understood I.e. Raise alarm
-
Emergency rescue arrangements tested / suitable
-
Atmosphere testing - equipment / location / suitability
-
Competency checks
-
Other
Work Practices - Lifting
-
Lifting equipment / accessories inspected, statutory inspections available
-
Lift plan developed / approved
-
Fit for purpose (terrain, SWL, etc)
-
Personnel trained, competency evidence
-
Free from defects
-
Out riggers used correctly / stable ground
-
Area barrier off / tag lines used
-
Work at height, scaffold
Plant - Mobile Plant
-
Visual defects / leaks / clean and tidy
-
Weekly inspection register up to date
-
Feeling controlled
Plant - Static Plant
-
Earthed out
-
Visual defects / hoses / cables in good condition
-
Correct junctions / coupling
-
Drip tray / spill mat / double bunded
-
Over pumping hoses / suitable route / security
-
Free from excessive smoke
-
Scaffold
Waste & Environmental Impact
-
Waste removed / segregated / skips labelled / covered
-
Recycling, re-use onsite, conserving energy
-
Consideration of public/plants/wildlife
-
Site noise / dust / vibration controlled / monitored
-
Other
Miscellaneous
Report Summary
Brief summary of inspection (describe work activities, equipment used and site condition)
-
Names or number of personnel on site