Information
-
Site conducted
-
Date and Time of Shift Changeover Inspection
-
Document No.
-
Shift Supervisors completing checklist
- Brody Kyle
- Malcolm Moy
- Paul Poggi
- Aaron Lennon
- Dave Callaghan
- Keith Walsh
- Glenn Lloyd
-
Additional employee name(s) involved in audit (if any):
Amenities
-
Are there any obvious WHS issues to report
-
Housekeeping is in order
-
Equipment / Machinery is in good sound operating order
Raw Material Receivals
-
Are there any obvious WHS issues to report
-
Housekeeping is in order
-
Equipment / Machinery is in good sound operating order
Powders / Staging
-
Are there any obvious WHS issues to report
-
Housekeeping is in order
-
Equipment / Machinery is in good sound operating order
-
No electronic devices (i.e. mobile phones) are being used by staff in the Powders room
Flavours / Batching Fruit
-
Are there any obvious WHS issues to report
-
Housekeeping is in order
-
Equipment / Machinery is in good sound operating order
-
No electronic devices (i.e. mobile phones) are being used by staff in the Flavours room(s)
Batching Fruit - KAN BAN
-
Batched Fruit cannot be batched into fruit bins >6hrs ahead of being cooked.
-
In the event that fruit has been batched > 6hrs the implicated production shift Supervisor must comment / record reasoning for batching outside company guidelines.
-
Line 1 - How far ahead has production batched fruit into bins ready for cook floor
-
Record reasoning for why product is batched >6hrs in advance
-
Line 2 - How far ahead has production batched fruit into bins ready for cook floor
-
Record reasoning for why product is batched >6hrs in advance
Cook Floor - Line 1 & 2
-
Are there any obvious WHS issues to report
-
Housekeeping is in order
-
Equipment / Machinery is in good sound operating order
Pack Floor - LIne 1 & 2 including yard
-
Are there any obvious WHS issues to report
-
Housekeeping is in order
-
Equipment / Machinery is in good sound operating order
-
Line 1 - There are no visible signs of line leakage from cooking to pack out during production - Inspect all connections
-
Report immediately to Production & QA Management to assess and take appropriate corrective action
-
Line 2 - There are no visible signs of line leakages from cooking to pack out during production - Inspect all connections
-
Report immediately to Production & QA management to assess and take appropriate corrective action
HACCP Verification
-
Line 1 - CCP 1: Equipment / Line Sterilisation has been verified 104°C for >=10 minutes via IGNITION system. Record date & timing of verification activity for Cooler 1 (probe T24.2); Cooler 2 (probe T24.3) & End of Line Sample Bell (probes TT107 & TT103)
-
Line 1 - CCP 1: Nitrogen Equipment / Line Sterilisation has been verified 104°C for >=10 minutes via IGNITION system. Record date & timing of verification activity Probe T23.5
-
Line 1 - CCP 2: Finished Product Pasteurisation has been verified 85°C for >=10 minutes via IGNITION system. Record date & timing of verification activity Probe T23.2. Include evidence (photo) of the Start - Middle - End of your shift.
-
Line 1 - CCP 3: Connection Sterilisation has been verified 104°C for >=10 minutes (Operational Target) via IGNITION system. Record date & timing of verification activity for Sampler A (probe TT107); Sampler B (probe TT103); Bulk Filler and Twin Filler. Note: Critical limit is 104°C for >=5 minutes. Include evidence (photo) of the Start - Middle - End of your shift.
-
Line 1 - CCP 6: Bulk / Twin Filler Sterilisation has been verified 104°C for >=10 minutes. Record date & timing of verification activity
-
Line 2 - CCP 1: Equipment / Line Sterilisation has been verified 104°C for >=10 minutes (for "Pasteurised" product) &/or 112°C for >= 10 minutes (for "Sterilised" product) via IGNITION system. Record date & timing of verification activity Probe TT108
- Compliant
- Non-Compliant
- N/A
-
LINE 2 - CCP 2: Finished Product Pasteurisation has been verified via IGNITION system. Record date & timing of verification activity. Refer to Reference Document #100477 Hipex Pasteurisation Tolerances. Include evidence (photo) of the Start - Middle - End of your shift.
-
LINE 2 - CCP 3: Connection Sterilisation has been verified 104°C for >=5 minutes (for "Pasteurised" product) &/or 112°C for >=5 minutes (for higher risk products - MSP / Sterile) via IGNITION system. Record date & timing of verification activity for Sampler A (probe TT109); Sampler B (probe TT110); Sampler C (probe TT111). Include evidence (photo) of the Start - Middle - End of your shift.
-
Line 3 - CCP 1: Equipment / Line Sterilisation has been verified 104°C for >=10 minutes via IGNITION system. Record date & timing of verification activity of Condenser (TIC_320407; TIR_320401; TIC_330402; TICAL_040403), Circulation loop (TICAL_040402; 040403 & 320407) and Filling Line (TICAL_520410; 710406)
-
Line 3 - CCP 1: Nitrogen Equipment / Line Sterilisation has been verified 104°C for >=10 minutes via IGNITION system. Record date & timing of verification activity. High Pressure (TICAL_510402); Low Pressure (TICAL_510409)
-
Line 3 - CCP 2: Finished Product Pasteurisation has been verified 85°C for >=10 minutes via IGNITION system. Record date & timing of verification activity Probe TICAL_100401 (Bottom) and TICAL_100403 (Middle). Include evidence (photo) of the Start - Middle - End of your shift.
-
Line 3 - CCP 3: Connection Sterilisation has been verified 104°C for >=10 minutes (Operational Target) via IGNITION system. Record date & timing of verification activity for SIP Sampling Box (TIC_730401); CSD A (TI_760402); CSD B (TI_760404); Filling Line A (TIC_740401) & Filling Line B (TIC_750401). Include evidence (photo) of the Start - Middle - End of your shift.
-
CCP 4 - Tote Sterilisation has been verified 104°C for >=10 minutes (for "Pasteurised product) &/or 115°C for >=11 minutes (for "Sterile product) via IGNITION. Record date & timing of verification activity
-
Have all the Critical Control Points (CCP's) been verified for your production shift
-
This is a Critical Non conformance. All CCP's must be verified and signed off by shift supervisor. Refer CCP table on Form AFQA-F-0027 for recommended protocols in the event of CCP Breach
-
Has the HACCP Process Data Verification form AFQA-F-0027 been signed for your production shift
-
This is a Failed CCP Breach. Ensure CCP are reviewed & verification form is signed
HACCP Sign Off
-
Shift Supervisor Verifying CCP's Signature
-
Print Name & Date
-
Shift
Sign Off
-
The incoming shift supervisor must sign off as they are accepting responsability for the plant in an "as is" condition
-
Incoming Shift Supervisor Signature