Information
-
Document No.
-
Conducted on
-
Prepared by
Open Supervisor
Task To Be Done
-
Open Procedure. 5.30am
-
Indoor Pool Test #1. 5.45am
-
Indoor Pool Test #2. 9.30am
-
Indoor Pool Test #3. 12.45pm
-
Check Defib green light is flashing
Ongoing Tasks
-
Sweep and Clean Front Entrance. Tidy Foyer and Table Area
-
Check Changerooms Every 30 minutes
-
Morning Lifeguard Break. 10 mins
-
Reception Break. 10 mins
-
Reception Break. 30 mins
-
Is everything else satisfactory?
-
Shift Supervisor
Close Supervisor
Task To Be Done
-
Indoor Pool Test #3. 12.45pm
-
Banking Node 30. If Required
-
Indoor Pool Test #4. 3.30pm
-
Outdoor Pool Test #3. 3.45pm. (Summer Only)
-
Banking Node 31. 6.30pm
-
Indoor Pool Test #5. 7.00pm
-
Banking Node 30. 8.30pm
-
Backwash Filter 1. Add 2 Bags Calcium Monday Backwash Filter 2 Tuesday Backwash Filter 3. Add 2 Bags Bicarb Wednesday Backwash Filter 4 Thursday Backwash Filter 1. Add 2 Bags Bicarb Friday
-
Close Procedure
Ongoing Tasks
-
Check Eucalyptus For Sauna and Replace If Necessary
-
Sweep and Clean Front Entrance. Tidy Foyer and Table Area
-
Check Change Rooms Hourly
-
Afternoon Lifeguard Break. 10 mins
-
Closing Lifeguard Break. 10 mins
-
Reception Break. 10 mins
-
Reception Break. 30 mins
-
Shift Supervisor
Pool Test
Pool Test #1. 5.45am
Main Pool
-
FREE CHL (DPD-XF)
-
TOTAL CHL (DPD-XT)
-
COM CHL
-
PH (PHENOL RED)
Bubble Pool
-
FREE CHL (DPD-XF)
-
TOTAL CHL (DPD-XT)
-
COM CHL
-
PH (PHENOL RED)
Temperature
-
MAIN
-
BUBBLE
-
BEACH
-
AIR
Plantroom Check
-
AUTO PH
-
AUTO CHL
-
AUTO TEMP
-
FILTER PRESSURE
-
BALANCE TANK LEVEL
-
BOILER TEMP
Sat Index Wednesday Only
-
ALK (ALKAPHOT)
-
CALCIUM (CALCICOL 1+2)
-
RESULTS
-
WATER QUALITY
-
General Comments - chemical additions, faults
-
Shift Supervisor
Pool Test #2. 9.30am
Main Pool
-
FREE CHL (DPD-XF)
-
TOTAL CHL (DPD-XT)
-
COM CHL
-
PH (PHENOL RED)
Bubble Pool
-
FREE CHL (DPD-XF)
-
TOTAL CHL (DPD-XT)
-
COM CHL
-
PH (PHENOL RED)
Temperature
-
MAIN
-
BUBBLE
-
BEACH
-
AIR
Plantroom Check
-
AUTO PH
-
AUTO CHL
-
AUTO TEMP
-
FILTER PRESSURE
-
BALANCE TANK LEVEL
-
CHECK HYPO BUNDING FOR LEAKS
-
CO2 LEFT
-
CO2 LRIGHT
-
HYPO LEVEL
-
BATHER LOAD
-
WATER QUALITY
-
General Comments - chemical additions, faults
-
Shift Supervisor
Pool Test #3. 12.45pm
Main Pool
-
FREE CHL (DPD-XF)
-
TOTAL CHL (DPD-XT)
-
COM CHL
-
PH (PHENOL RED)
Bubble Pool
-
FREE CHL (DPD-XF)
-
TOTAL CHL (DPD-XT)
-
COM CHL
-
PH (PHENOL RED)
Temperature
-
MAIN
-
BUBBLE
-
BEACH
-
AIR
Plantroom Check
-
AUTO PH
-
AUTO CHL
-
AUTO TEMP
-
FILTER PRESSURE
-
BALANCE TANK LEVEL
-
CHECK HYPO BUNDING FOR LEAKS
-
BATHER LOAD
-
WATER QUALITY
-
General Comments - chemical additions, faults
-
Shift Supervisor
Pool Test #4. 3.30pm
Main Pool
-
FREE CHL (DPD-XF)
-
TOTAL CHL (DPD-XT)
-
COM CHL
-
PH (PHENOL RED)
Bubble Pool
-
FREE CHL (DPD-XF)
-
TOTAL CHL (DPD-XT)
-
COM CHL
-
PH (PHENOL RED)
Temperature
-
MAIN
-
BUBBLE
-
BEACH
-
AIR
Plantroom Check
-
AUTO PH
-
AUTO CHL
-
AUTO TEMP
-
FILTER PRESSURE
-
BALANCE TANK LEVEL
-
CHECK HYPO BUNDING FOR LEAKS
-
BATHER LOAD
-
WATER QUALITY
-
General Comments - chemical additions, faults
-
Shift Supervisor
Pool Test #5. 7.00pm
Main Pool
-
FREE CHL (DPD-XF)
-
TOTAL CHL (DPD-XT)
-
COM CHL
-
PH (PHENOL RED)
Bubble Pool
-
FREE CHL (DPD-XF)
-
TOTAL CHL (DPD-XT)
-
COM CHL
-
PH (PHENOL RED)
Temperature
-
MAIN
-
BUBBLE
-
BEACH
-
AIR
Plantroom Check
-
AUTO PH
-
AUTO CHL
-
AUTO TEMP
-
FILTER PRESSURE
-
BALANCE TANK LEVEL
-
CHECK HYPO BUNDING FOR LEAKS
-
BATHER LOAD
-
WATER QUALITY
-
General Comments - chemical additions, faults
-
Shift Supervisor