Title Page

  • prepared by

  • Conducted on

  • site id

  • Location
  • On behalf of

Risk assessment

is the following in place

  • first aid kit

  • rescue kit

  • emergency procedures

  • emergency numbers

  • spill kits

  • warning signs

  • rescue plan discussed

general site hazards

  • access and egress

  • restricted areas

  • asbestos

  • noise

  • confined spaces

  • roof hazards

  • fumes and gases

  • hazardous substances

  • hot and cold sustances

  • vehicle movement

  • ionizing radiation

  • rf radiation

  • high voltage electricty

  • gas and steam

  • fire and explosion

  • machinery

  • lift motor rooms

  • automated plant

  • battery rooms

  • lighting

tower hazards

  • Aplicable

  • working at Hight

  • fixed fall arrest in date

  • entry into ductwork

  • ppe

  • rf indication

  • lifting in progress

  • weather conditions

roof hazards

  • Applicable

  • fragile surfaces

  • trip hazards

  • no barrier or para pit

  • use of ladders

  • bird faeces

  • entry into ductwork

  • manual handling

  • weather conditions

MEWP hazards

  • Applicable

  • traffic hazards

  • pedestrians

  • ground conditions

  • machine suitability

  • machine inspection cert

  • ppe

  • weather conditions

excavation hazards

  • Applicable

  • working at height

  • underground services

  • contaminated ground

  • entry in to ductwork

  • ppe

  • lifting in progress

  • weather conditions

RAMS

  • Have the rams been seen by everyone on site

  • attendees on site

access

  • take photo of access

  • take photo of signage

ground level photos

  • photo of emc

  • photos of cabins and equipment

  • photos of structure

  • Feeder count

  • Photo of feeder run

  • photo of foundation

  • photo of connection to foundation

Connection to foundation

  • What is the connection to foundation

  • holding down plate thickness

  • holding down plate size

  • number of bolts

  • size of bolts

  • number of bolts

  • size of bolts

  • gap between foundation and under side of plate

  • size of plate

  • bolt centers

  • bolt centres

  • please provide photo

  • size of leg

  • please describe connection

  • please provide photo

tower detail

  • tower type

  • what type of tower leg

  • CHS diameter

  • CHS thickness

  • leg to leg at base

  • splice
  • height to centre line

  • type of splice

  • size of splice plate

  • number of bolts

  • bolt size m

  • leg to leg

  • tower leg size

  • brace size

  • brace bolt size

  • number of brace bolts

  • vertical gap in brace

  • leg to leg at base

  • what size RSA (WxWxT)

  • splice
  • height to centre line

  • type of splice

  • size of splice plate

  • number of bolts

  • bolt size m

  • leg to leg

  • tower leg size

  • brace size

  • brace bolt size

  • number of brace bolts

  • vertical gap in brace

  • What is the tower leg

  • splice
  • number of faces

  • face width

  • height of splice

  • type of splice

  • face thickness

  • leg to leg at top of tower

  • Top of tower height (m)

Equipment detail

    Equipment
  • Height (m)

  • Location

  • Number

  • Type

  • Operator

  • Bearing

  • Feeders

  • Feeder location

  • Photo of equipment

OLO equipment

  • What other operators are on site

  • Note other OLO and centre line heights

  • OLO photos

Site drawings

  • Provide cabin sketch

  • Provide base sketch

  • Provide head frame sketch

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.