Title Page
-
prepared by
-
Conducted on
-
site id
-
Location
-
On behalf of
Risk assessment
is the following in place
-
first aid kit
-
rescue kit
-
emergency procedures
-
emergency numbers
-
spill kits
-
warning signs
-
rescue plan discussed
general site hazards
-
access and egress
-
restricted areas
-
asbestos
-
noise
-
confined spaces
-
roof hazards
-
fumes and gases
-
hazardous substances
-
hot and cold sustances
-
vehicle movement
-
ionizing radiation
-
rf radiation
-
high voltage electricty
-
gas and steam
-
fire and explosion
-
machinery
-
lift motor rooms
-
automated plant
-
battery rooms
-
lighting
tower hazards
-
Aplicable
-
working at Hight
-
fixed fall arrest in date
-
entry into ductwork
-
ppe
-
rf indication
-
lifting in progress
-
weather conditions
roof hazards
-
Applicable
-
fragile surfaces
-
trip hazards
-
no barrier or para pit
-
use of ladders
-
bird faeces
-
entry into ductwork
-
manual handling
-
weather conditions
MEWP hazards
-
Applicable
-
traffic hazards
-
pedestrians
-
ground conditions
-
machine suitability
-
machine inspection cert
-
ppe
-
weather conditions
excavation hazards
-
Applicable
-
working at height
-
underground services
-
contaminated ground
-
entry in to ductwork
-
ppe
-
lifting in progress
-
weather conditions
RAMS
-
Have the rams been seen by everyone on site
-
attendees on site
access
-
take photo of access
-
take photo of signage
ground level photos
-
photo of emc
-
photos of cabins and equipment
-
photos of structure
-
Feeder count
-
Photo of feeder run
-
photo of foundation
-
photo of connection to foundation
Connection to foundation
-
What is the connection to foundation
-
holding down plate thickness
-
holding down plate size
-
number of bolts
-
size of bolts
-
number of bolts
-
size of bolts
-
gap between foundation and under side of plate
-
size of plate
-
bolt centers
-
bolt centres
-
please provide photo
-
size of leg
-
please describe connection
-
please provide photo
tower detail
-
tower type
-
what type of tower leg
-
leg to leg at base
splice
-
height to centre line
-
type of splice
-
size of splice plate
-
number of bolts
-
bolt size m
-
leg to leg
-
tower leg size
-
brace size
-
brace bolt size
-
number of brace bolts
-
vertical gap in brace
-
leg to leg at base
-
what size RSA (WxWxT)
splice
-
height to centre line
-
type of splice
-
size of splice plate
-
number of bolts
-
bolt size m
-
leg to leg
-
tower leg size
-
brace size
-
brace bolt size
-
number of brace bolts
-
vertical gap in brace
-
What is the tower leg
splice
-
face width
-
height of splice
-
type of splice
-
face thickness
-
-
-
leg to leg at top of tower
-
Top of tower height (m)
Equipment detail
- Equipment
-
Height (m)
-
Location
-
Number
-
Type
-
Operator
-
Bearing
-
Feeders
-
Feeder location
-
Photo of equipment
OLO equipment
-
What other operators are on site
- Mbnl
- Vodafone
- TEF
- Airwave
- Other
-
Note other OLO and centre line heights
-
OLO photos
Site drawings
-
Provide cabin sketch
-
Provide base sketch
-
Provide head frame sketch