Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Instructions
-
Instructions
-------------------
1. Complete the "Site Assessment" and "Site Preparation" sections of the audit
2. Answer relevant questions and add any photos and notes by clicking on the paperclip icon
3. To create a corrective action click on the paperclip icon then "Action", provide a description, assign to a member, set priority and due date
4. Complete audit by providing digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link
Site Assessment
Traffic and Foot Path
-
Does the road seem busy?
-
Will there be a need for traffic management?
-
Is there a foot path?
-
Is there a need for a temporary fencing?
-
Attach Photo
Water and Power
-
Is there a water meter?
-
Pick location
-
Is there a requirement for it to be moved?
-
Is there an overhead power?
-
Is there a need for a power protection?
-
Attach Photo
Fencing
-
Fence Type
-
Fencing Condition
-
Attach Photo
-
Is there a need for fence removal?
-
Will this affect the neighbouring properties?
-
Enter addresses
Signature
-
Add notes
-
Inspected by:
Site Preparation
Site Preparation
-
Site Manager should prepare the site for construction by doing the following:
-
Install company sign with safety and compliance information
-
Take photo of company sign
-
Install barriers around any structures, trees and property
-
Take photo of barriers setup
-
Prepare and deliver any construction report letters to neighbouring letterboxes (if applicable)
-
Conduct final preparation report
Site Manager Signature
-
Site Manager