Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
100% PPE Hi-Vis, Hard Hat
-
Face Shields (cutting/Mixing/grinding)
-
Eye Protection
-
Respiratory Protection
-
Weather(scaffolding) ice, wind, rain, snow
-
Dust Control
-
First Aid Kit
-
Emergency Actions (Eyewash)
-
Housekeeping (walkways,scaffolds,stairs, Steps)
Falls / objects (From)
-
Holes
-
Scaffolding(tube)
-
Mast Climbers
Scaffolding (frame)
-
Compatible Components
-
Foundation
-
Plumb, Level, Square
-
Baseplate/ Mudsill
-
Cross bracing
-
Fall protection
-
Access
-
Tagged,Signed,Dated
-
Tie-Backs
-
Hangers
-
Planking
-
Toe boards
-
Guard/End Rails
-
Gravity Pins
Fraco,Hydro Mobile, Hydek
-
Foundation/stable/firm
-
Stable ground @ base
-
Level Mast/Base
-
Overhead Clearance
-
Bridge Structure/ extensions
-
Tower Structure
-
Pins/bolts tightened
-
Platform Condition
-
Plank Condition/ Ties
-
Guardrail condition
-
Tower stops
-
Tie-backs/bolts/tightened
-
Load placement
-
Fuel Level Check
-
Hydraulic Hose Condition
-
Battery Condition
-
Daily inspection
-
Platform stop
-
Perimeter Blocked/barricaded
-
Access
-
Debris
-
Powerlines
-
Walkways(pedestrian)
-
Operator Training
Ladders & Stairs
-
Ladder/stair needed
-
Proper use/ condition
-
Extended 3ft / tied
-
Stair ramp properly constructed
-
Platforms Railed
-
Unpoured Stairs
Equipment Tools Machinery
-
Seatbelts
-
Audible (horns, back-up)
-
Tires
-
Mounted Fire protection
-
Operators seat
-
Load charts
-
Controls Error Free
-
Brakes/ parking
-
Steering
-
Cabs, Doors, Windows
-
Lights
-
Boom
-
Forks
-
Gas caps
-
Guards
-
Training
-
Occupants Guarded
-
Operators Manual
Electrical
-
Ground Prong
-
Cords free of , Cuts, Splits, Damage
-
GFCI
-
Temp Lighting
Fire Safety
-
Extinguishers, size, location, inspection
-
Safety Cans
-
LPG, tanks, storage
-
Heating Devices
-
Ventilation
-
Hot work permits
-
Fire watch