Title Page
-
Audit Title
-
Contract No.
-
Auditors Name
-
Customer
-
Location
-
Date Visited
-
Date Installed
-
Date Recovered
-
Drivers Name
-
Drivers Mate
Contract Status
-
Is the site still being installed?
-
Has the site been installed?
-
Is the site in use & being re-sited?
-
Is the site being recovered?
-
Has the site been recovered?
Condition of Products on Site
-
Where were the products delivered to site from?
- Bramley Vale
- Eve North
- Eve South
- Halifax Depot
- Haydock Depot
- Other - Please Specify
-
*If 'Other' - please specify
-
Do any Products have "fresh" damage from previous site?
-
If 'Yes', has a damage notification form been completed for the previous site?
-
If 'Yes', please take relevant photos of any concerns
-
Comments
Site Observations
-
Has the Site Specific Risk Assessment process been completed by the Eve Crew on site?
-
Do the Eve Crew understand the content of the Risk Assessments?
-
Have the Crews been inducted to work on this site and have signatures been obtained (including the PM)?
-
Have the Crews been given a telephone list of all the emergency services to contact?
-
Has a site drawing been issued to the Trakway Crew/Contract Owner on site?
-
Is the correct PPE being worn by Crews & Project Manager on site?
-
Are the staff aware of the method statements, through communication/understanding. i.e. TBT form?
-
Does the installation meet with the requirements of the Contract/ job pack?
-
Does the installation meet with the Customers requirements?
-
Are all connection points in a good suitable condition for this type of on-going workload?
-
Is the equipment in good condition? (Highlight no if segregation and repair are required)
-
Is all equipment installed to the customers drawing specification?
-
Have all the correct products/ materials been delivered to site in accordance with the contract pack?
-
Have all overlaps, starts and finish points been covered with PVC matting?
-
Are all panels cross plates when required?
-
Has there been adequate Trakway signs & frames placed along the access?
-
Have all Products/ Materials not required been removed from site?
-
Is the site layout to an acceptable standard that eve can safely deliver without compromising compliance procedures?
-
Is the traffic management suitable for the installation/ recovery?
-
Has the site been left clean and tidy?
-
Have you taken photos of any concerns that need reporting or recording through this Audit?
-
Has a site handover form been completed and has it been signed by the client?
-
Is the Actual Build Schedule up to date and available for viewing?
-
Has a weekly Audit form been completed on this site?
-
Does the site require a re-visit for maintenance during the hire period?
-
Comments
Sales Information
-
What opportunities have you identified to increase the number of and range of Eve/ A-Plant products on site?
-
What upcoming projects does the customer have?
-
What alternative products or suppliers does this customer use? Either on this site or others
Site Security
-
Who arranged for Security on site?
-
Is the Security Guard Present?
-
Has the Security Guard been asked to record and count all materials on site?
-
Has the Security Guard actually counted all materials on site?
-
Does the Security Guard have adequate means of communication? i.e. Radio/ land line/ mobile phone
Comments
-
Site Audit Comments
Notes: Please return the completed document by email to chrisryan@aplant.com within two working days of the Audit. Site Audit file name - Your name, site number/ name and date - i.e. "Joe blogs NR345 Milton Keynes 04-05-2015"
-
Please add relevant Photos supporting your Site Audit