Title Page

  • Project Name

  • Location
  • Start Date

  • End Date

  • Site Manager / Supervisor

  • Scope of works

Authroisation to Work

  • Bp Pulse Authorisation to work Permit

  • Bp Pulse: AUTHORISATION – 1 (is authorising contractor to perform safe start procedures, including permits and works as per the construction schedule and Construction Phase Plan

  • (Site Supervisor / manager): AUTHORISATION – 2 completed - I confirm that I have read and understood the contents of the site pack and understand my requirements to ensure safe construction site - I confirm that all operations will be conducted in line with BP Pulse Control of Safe Practice (CoSP) - All necessary permits are in place, inductions complete and H&S concerns will be communicated to BP Pulse project manager.

  • UPLOAD completed Authorisation to work form on completion of job

INDUCTIONS

  • Brief all site persons with attached induction. Ensure site specific emergency plan is communicated for : Fire, First Aid, Incidents, Environmental emergencies

Attendance Records

  • Upload Attendance Records

Staff Competencies

  • Upload Staff Competencies (CSCS Card, Plant, FAW e.t.c.)

PERMITS

  • UPLOAD all completed permits

Permit Templates - BPP

  • Electrical Permit - BPP

  • Hot Works Permit - BPP

  • Confined Space Permit - BPP

  • Work at Height Permit - BPP

  • Excavation Permit - BPP

End of Day Audit

  • End of Day

  • Has all work equipment been stored and locked securely away before leaving site?

  • Has any flammable or polluting substances been safely secured and stored in des-ignated areas?

  • Has any leftover materials been stored in designated material laydown areas?

  • Is the work area clean and tidy? E.g. No trip hazards/rubbish and waste materials disposed of/dust pollution etc

  • Have any excavations been appropriately supported with trench support and barri-ered off?

  • Ensure any live cabling or services are isolated/protected and guarded off.

  • Is there appropriate safety/warning signage around the site and external to the site?

  • Is there sufficient lighting around the site?

  • Have all site workers signed out?

  • Is the work area/site barriered off appropriately and secure to ensure no unauthorised entry?

H&S Documents - Upload

HSSE Law Poster

  • HSE Law Leaflet: Please ensure everyone has access to this - it is a legal requirment

DESIGNS

  • Upload Latest Design

  • Register Design Changes during construction

UTILITY Searches

  • UPLOAD Utility Drawings

HOLD Points

  • UPLOAD - completed hold points

  • Electrical Hold Point - BPP

  • Civil Hold Point

undefined

PLANT

  • Upload Plant Register / Pre-use Checks

HEALTH

  • UPLOAD: HAVS Record

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.