Title Page
-
Project Name
-
Location
-
Start Date
-
End Date
-
Site Manager / Supervisor
-
Scope of works
Authroisation to Work
-
Bp Pulse Authorisation to work Permit
-
Bp Pulse: AUTHORISATION – 1 (is authorising contractor to perform safe start procedures, including permits and works as per the construction schedule and Construction Phase Plan
-
(Site Supervisor / manager): AUTHORISATION – 2 completed - I confirm that I have read and understood the contents of the site pack and understand my requirements to ensure safe construction site - I confirm that all operations will be conducted in line with BP Pulse Control of Safe Practice (CoSP) - All necessary permits are in place, inductions complete and H&S concerns will be communicated to BP Pulse project manager.
-
UPLOAD completed Authorisation to work form on completion of job
INDUCTIONS
-
Brief all site persons with attached induction. Ensure site specific emergency plan is communicated for : Fire, First Aid, Incidents, Environmental emergencies
Attendance Records
-
Upload Attendance Records
Staff Competencies
-
Upload Staff Competencies (CSCS Card, Plant, FAW e.t.c.)
PERMITS
-
UPLOAD all completed permits
Permit Templates - BPP
-
Electrical Permit - BPP
-
Hot Works Permit - BPP
-
-
Confined Space Permit - BPP
-
Work at Height Permit - BPP
-
Excavation Permit - BPP
End of Day Audit
-
End of Day
- Day 1
- Day 2
- Day 3
- Day 4
- Day 5
- Day 6
- Day 7
-
Has all work equipment been stored and locked securely away before leaving site?
-
Has any flammable or polluting substances been safely secured and stored in des-ignated areas?
-
Has any leftover materials been stored in designated material laydown areas?
-
Is the work area clean and tidy? E.g. No trip hazards/rubbish and waste materials disposed of/dust pollution etc
-
Have any excavations been appropriately supported with trench support and barri-ered off?
-
Ensure any live cabling or services are isolated/protected and guarded off.
-
Is there appropriate safety/warning signage around the site and external to the site?
-
Is there sufficient lighting around the site?
-
Have all site workers signed out?
-
Is the work area/site barriered off appropriately and secure to ensure no unauthorised entry?
H&S Documents - Upload
HSSE Law Poster
-
HSE Law Leaflet: Please ensure everyone has access to this - it is a legal requirment
DESIGNS
-
Upload Latest Design
-
Register Design Changes during construction
UTILITY Searches
-
UPLOAD Utility Drawings
HOLD Points
-
UPLOAD - completed hold points
-
Electrical Hold Point - BPP
-
Civil Hold Point
undefined
PLANT
-
Upload Plant Register / Pre-use Checks
HEALTH
-
UPLOAD: HAVS Record