Information

  • Job Number

  • Conducted on

  • Site

  • Prepared by

  • Location

Site Status

  • What type of inspection is being undertaken?

  • Who is the Site Manager?

  • Has the site fallen below 75% or does it pose a significant risk to be deemed a "Restricted Site"?

  • Who is the Site Manager

  • Has the site fallen below 75% or does it pose a significant risk to be deemed a "Restricted Site"?

  • Who is the Site Manager?

  • Weeks until completion?

  • How many operatives are on site?

  • Works ongoing?

  • Please list:

Summary

  • Summary of Site Inspection

Documentation

Documentation

Construction Documentation

  • Is the construction phase plan suitably developed? (Version 8)

  • Have all operatives / visitors attended a site Induction?

  • Has a project Notification of works Form (F10) been completed where required?

  • Is a Refurbishment & Demolition Asbestos Survey provided for the project?

  • Has the Asbestos signature document been signed by all relevant parties (Project Manager, Site Manager Supervisors etc...)

  • Is Asbestos well managed and presents no risk?

  • Has asbestos works been undertaken?

  • Is a certificate of re-occupation in the site file and have the comments by the removal contractor been implemented?

Signage

  • Is company notice board displayed and all information populated as required?

  • Is "What 3 Words" written on the Emergency Contact List at the bottom?

  • Is the Emergency Plan, Logistics Plan & Site Plan all on site and available to view?

  • Have ADT Safety Posters been displayed on site?

Risk Assessment

  • Are risk assessments supplied / suitable and sufficient?

  • Are operatives provided with a separate set of RAMS?

  • Have RAMS been checked and recorded via iAuditor by Site Manager before works commence?

  • Is signed acceptance of RA / MS before commencement of work available?

  • Do the site labourers have suitable RAMS & are they signed onto?

  • Are COSHH Assessments supplied / suitable and sufficient?

  • Is signed acceptance of COSHH Assessments before commencement of work available?

  • Are control measures stipulated in RAMS & COSHH Assessments followed?

COVID-19

  • Is sanitiser available at all entry points and in welfare areas?

Supervision

  • Site Manager Log completed daily?

  • Are Operatives attending weekly TBT's which are recorded via iAuditor?

  • Is the site manager using iAuditor?

  • Is the site manager completing Weekly Site Inspections?

  • Is the Project Manager completing monthly site inspections?

  • Has Friday's iAuditor check been completed by the Site Manager?

Welfare

Welfare

  • Are the statutory toilet and washing facilities available and suitable?

  • Is the hot water hot and free flowing?

  • Are Kitchen Appliances clean with no signs of damage

  • Is there a rest area is this adequate?

  • Is the rest area away from the working area? (no risk of noise, dust or nearby work)

  • Are the facilities cleaned and maintained to a good standard?

  • Are the 1st Aid arrangements on site adequate?

  • Is the ADT standard first aid kit, bodily fluid kit & burns kit on site?

  • Is the site manager monitoring Welfare & First Aid via iAuditor?

  • Is suitable COVID Cleaning being done throughout?

Work Areas

Work Areas

Internal

  • General Housekeeping (neat, tidy, dust free & waste controlled well etc...)

  • Is flooring adequate with no sudden changes in level (Example - Flooring panels removed & left)

  • Have walkways been defined? (safe route to walk)

  • Walkways (free of debris and obstructions)

  • Is lighting adequate for all areas of the site?

  • Material Storage / Lay Down (neat and tidy)

External

  • General Housekeeping (neat, tidy, dust free & waste controlled well etc...)

  • Is there safe access & egress onto site?

  • Is the external area sufficiently segregated from the public?

  • If waste is being loading in to a skip is the process safe?

  • If vehicles are reversing, is there a competent banksman?

  • Are there any areas which are deemed as dangerous?

Security

Security

  • Is access to the site restricted?

  • Is perimeter fencing / access door secure & undamaged?

  • Is "Sign C" outside each entrance to the site to advice of ADT site & rules

  • Are all attractive material secured against theft?

  • Are all visitors escorted on and around site?

Fire Management

Fire Management

  • Has the site fire risk assessment been completed and actions implemented?

  • Is there a way of raising an alarm in the event of an emergency? (Live Call Points)

  • What call points are being used?

  • Are the call points numbered on the emergency plan?

  • Has the weekly fire alarm test been recorded via iAuditor?

  • Has a fire drill been recently carried out?

  • Are appropriate fire extinguishers suitably located throughout site?

  • Are all fire extinguishers serviceable?

  • Are evacuation routes clearly signed?

  • Are fire exits kept free from obstructions?

  • Are all fire doors kept shut?

  • Do these routes lead to safe areas?

  • Are SMOKING areas designated and adhered to?

Hot Works

  • Is Hot Works being undertaken on site?

  • Is there a PTW for the tasks?

  • Is the PTW completed correctly?

  • Are Hot Works Guides provided at the point of work?

  • Have all required actions / controls been implemented?

  • Are there adequate fire extinguishers in hot working areas?

  • Are all fire extinguishers serviceable?

  • Are in progress Hot Works inspections being completed via iAuditor by the Site Manager?

Personal Protective Equipment (PPE)

Personal Protective Equipment (PPE)

  • Hard Hats (available, worn and in safe condition)

  • Safety Glasses / Goggles (available, worn and in safe condition)

  • Respiratory Protection (available, worn and in safe condition)

  • Is there evidence of face fit testing for the specific RPE being worn?

  • Hearing Protection (available, worn and in safe condition)

  • Gloves (available, worn and in safe condition)

  • Foot Protection (fit for task, worn and in safe condition)

  • Hi Vis (fit for task, worn and in safe condition)

  • Is visitors PPE on site?

  • Is the site manager completing PPE inspections via iAuditor?

Working at Height

Working @ Height

  • Appropriate work at height equipment being used? (Hierarchy of Controls)

Mobile Towers

  • Are there any mobile towers on site?

  • Has the site manager completed his mobile tower inspection on iAuditor within the last 7 days?

  • Has the mobile tower been erected, dismantled or altered by a trained & competent person?

  • Has the mobile tower been built as per manufactures guidelines

  • Is there a scaff tag attached with an in date inspection?

Fixed Scaffold

  • Is there a fixed scaffold on site?

  • Does the scaffold have an in date scaffold tag?

  • Is the scaffold only being erected, modified & disassembled by a competent operative

  • Is the scaffold built correctly? (Guardrails, base plates, toe boards, ties, couplings etc..)

  • Is there safe access to all platforms?

  • Is each platform fully decked with no risk of items falling below?

  • Is the scaffold designed by a qualified person?

  • Is the environment the scaffold is built on suitable?

MEWPS

  • Are there any MEWPS/PAV's (Push Around Verticals) being used on site?

  • Are MEWPS inspected weekly by Site Manager and recorded on iAuditor?

  • If you have a valid licence with Static Vertical (1a) or Mobile Vertical (3a), you will only require familiarisation on the PAV, which should be recorded in your IPAF log book. Otherwise a specific PAV half a day course is required.

  • Is the MEWP/PAV (Push Around Vertical) being used by a trained & Competent person?

  • Is the certificate of thorough inspection in date?

  • Has the pre use check sheet been filled out correctly?

  • Is the MEWP/PAV (Push Around Vertical) being used as per manufactures guidelines?

  • Whilst at height, is there a risk of items falling onto anyone below?

  • Is the MEWP/PAV barriered off when working at height?

Stepladders / Ladders

  • Are stepladders being used on site?

  • Ladders are well maintained and in satisfactory condition & recorded via iAuditor?

  • Is a ladder tag attached with an in date inspection?

  • Are stepladders only being used on a permit basis issued by the site manager?

  • Are stepladders being used correctly?

Hoists

  • Is a Hoist being used on site?

  • What type of Hoist is it?

  • Does the hoist clearly show the safe working load?

  • Is it being used by trained & competent people?

  • Are daily pre-use checks carried out on the hoist by the operator?

  • Thorough Inspections: Every 6 months for lifting people, Every 12 months for lifting materials/goods.

  • Has a thorough inspection been carried out by a competent person?

  • Hoist Guidance

  • Set the controls up:

    so that goods hoists can be operated from one position only, e.g. ground level and the operator can see all the landing levels from the operating position; and
    so that passenger hoists with controls on the platform can only be operated from the platform, other than in emergencies.
    To prevent people being struck by the platform or other moving parts:

    enclose the hoistway at places where people might be struck, e.g. ground level, working platforms or window openings; and
    provide gates at all landings and at ground level.
    Prevent people falling down the hoistway by making sure:

    the hoistway is fenced where people could fall down it;
    the gates at landings are kept closed except during loading and unloading. Gates should be secure and not free to swing into the hoistway; and
    the standoff distance from the platform edge to the landing is appropriate and the platform is fitted with a ramp so there is no gap to fall through.
    Prevent people being hit by falling materials e.g. by:

    enclosing the hoistway;
    ensuring travel platforms have toe-boards and are enclosed with mesh or solid sides where loads exceed toe-board height;
    transporting loose materials in containers such as wheelbarrows or stillages;
    ensuring all containers are secured to prevent inadvertent movements; and
    ensuring loads are distributed evenly on the platform and do not impose any point loading in excess of the manufacturer's instructions.

  • Does the hoist prevent materials from falling below?

  • Does the hoist prevent people falling down the hoistway?

Tools & Equipment

Tools and Equipment

  • Is a temporary Electrical Supply on site.

  • Is an Electrical Installation Certificate available?

  • Is the temporary supply under a 3 monthly inspection regime?

  • Are Abrasive Wheels being used on site?

  • Is there evidence of competencies on site?

  • Right Tools are being used for tasks?

  • Trailing Cables & Overhead Cables are not causing trip hazards or used inappropriately?

  • Power Tools are undamaged and being used fit for purpose?

  • Is on tool dust extraction being used and controlled appropriately?

  • PAT Testing in date?

  • Has the Site Manager completed his inspection of equipment within the last 7 days?

People

People

  • Behaviour of all on site is orderly and professional?

  • Clear communication is possible without needing to shout?

  • Proper lifting technique demonstrated?

  • Contractor performance being monitored via iAuditor?

General Comments

General Comments

  • Any further comments or recommendations arising from this inspection?

  • Add any relevant additional photos you have

Sign Off

Sign Off

  • Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.