Information
-
Project Name
-
Conducted on
-
Prepared By:
General Health & Safety
-
Previous inspections closed out
Coronavirus (Covid-19) aspects
-
Are there additional handwashing / hand sanitizer stations and signage indicating the locations
-
Action Code
-
Is there an enhanced cleaning regime in place?
-
Is respiratory protection if required available (P3 type, face fitted)?
-
Action Code
Site inspection findings
-
Accidents
-
Near Miss / Incident
-
Contractor Training Certification (Check at least 1 person's qualification)
-
Access equipment/Edge Protection/Fall from Heights (Scaf tags, before use checks)<br><br>
-
Access Routes, Housekeeping, Storage of materials<br><br>
-
Isolation & Demolition Procedure<br><br>
-
PUWER/LOLER (machinery, plant, tools) (test certification)<br><br>
-
COSHH, Noise, Dust, Manual Handling, HAV.s<br><br>
-
Welfare Conditions <br><br>
-
RAMS, Permits, Tool box talks<br><br>
-
Trip, Slips & Falls<br><br><br>
-
PPE/RPE<br><br>
-
Fire and First Aid Provisions
-
PSS Representative
-
Safety Representative Overview
-
KP Safety Solutions Representative
Principal Contractor
-
Statutory Requirements (notices, posters, fire muster points,)
-
Principal Contractor Welfare Provisions (CDM 2015 requirements)
-
Worker Consultation
-
Environmental Impacts & Controls (dust, noise, waste & traffic management)j