Information
-
Site conducted
-
Document No.
-
Audit Title
-
Client / Site
- Hallmark Carrigaline site, phase 5.
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Documentation, Site Induction and Safe Pass
-
Sign in, sign out system established?
-
Personnel completed the CIF return to work Covid-19 training
-
Personnel in possession of up to date Safe Pass Card / CSCS Cards
-
Site specific safety induction in place?
-
Site specific Safety Statements?
-
Method Statements in place for specific tasks?
-
Risk Assessments / SPA's available and communicated?
-
Construction Safety and Health Plan in place?
-
Tool box talks conducted and documented?
-
Does the site documents cover Covid-19 details on site?
Housekeeping / Welfare Facilities / PPE
-
General Housekeeping in good order? Slips trips and falls
-
Good cable management in place?
-
First Aid kit in place and to regulations?
-
Trained First Aider available / Name
-
Is there good access to hand washing facilities and to hand sanitizer?
-
Is there access to face covering?
-
Is there adequate signage regarding Covid-19 restrictions and standards to be held on site (ie: Social distancing)
-
PPE requirements adhered to, Glasses, hi-vis, boots, helmets, gloves
-
Additional PPE, e.g. hearing protection used where necessary
-
Is there an isolation room set up on site and does all onsite are aware if its location?
-
Is the isolation first Aid kit in place ?
Work at Height / Scaffolding
-
Are all working at height activities subject to risk assessment?
-
Proper Ladders in use? Ladders in good condition?
-
Positioned / secured properly (footed / tied)?
-
Where MEWP's are being used, are they in good condition?
-
If mobile towers in use, do they comply with safety requirements?
-
Are personnel trained to erect / dismantle scaffolding / mobile towers, as required?
-
Is work at height equipment inspected before use by a competent person (using GA3)?
-
Where scaffold is being used, is it in good condition, in compliance with all safety requirements, erected by competent person(s) and being used safely?
-
Safe Access, scaftags in place
-
GA3 Forms in place for all working at heights equipment and forms up to date?
Ground Works
-
Are all works in excavations subject to a risk assessment
-
Is all plant and machinery in good working order and certified
-
Are persons trained plant and machinery operators holding appropriate CSCS cards?
-
Has all weekly checks been completed for plant ? Excavators etc..
-
Has daily checked been completed and recorded for all excavations ?
-
Is there adequate Barriers and signage around excavations?
-
Is there a trained banks man on site?
-
Is there a requirement for propping or banking the excavation, if yes please note what system is on use.
General
-
Electrical Safety / PAT testing? Portable tools / LOTO
-
Emergency Arrangements / Fire
-
Accidents / Incidents
-
Any other Issues:
Notes
-
undefined
Additional Comments / Observations
-
undefined