Title Page
-
Site Details
-
Conducted on
-
Name of Auditor:
-
Name of Site Supervisor:
-
Names of Site Team
Site Audit - Senior Manager
Site Inductions / Working Conditions
-
Have all worker received a site induction?
-
Is a signing in and signing out procedure in place?
-
Is their sufficient task lighting to work areas and access routes?
-
Can everyone get to their place of work safely, and work there safely?
-
Is the Insul-eight work activity sufficient segregated?
-
Have adequate warning signs been displayed?
-
Are Insul-eight site personnel working in a safe manner?
Welfare
-
Are welfare arrangements provided by the Main Contractor?
-
Are the welfare facilities in place suitable and sufficient?
-
Check welfare arrangements are in line with the RAMS.
-
Are welfare arrangements clean and tidy?
RAMS
-
Have all of the site team reviewed the RAMs and signed the declaration page?
-
Are material unloading arrangements in line with RAMS?
-
Is the carrying distance as short as reasonably practicable, or can vehicles be used to move the materials as close as possible?
-
Does the risk assessment cover all the relevant risks for the work activity?
-
Are there any isolation requirement detailed in the RAMS and have the site complied with requirements? (Document any proof of isolation obtained)
Work Equipment
-
Where appropriate is all electrical equipment 110v or battery operated?
-
Is work equipment being used for the purpose it was intended for?
Work Activity
-
Is the work activity on site in line with the RAMS?
-
Is the work method suitable?
Working at Height
-
Are working at height arrangements in line with the RAMS?
-
Are the working at height arrangements suitable and sufficient?
-
Are the working at height arrangements managed by the Main Contractor?
-
In the working at height inspection regime managed by the Main Contractor? Has supervisor checked for Handing Over Certificates / Inspection Records / Scafftags etc.?
-
Are operators IPAF trained to the correct type of equipment?
-
Are mobile towers in use?
-
Are the erectors / dismantlers PASMA trained?
-
Are the workers completing pre-use inspections of equipment in use?
PPE / RPE
-
Is PPE / RPE being worn correctly and inline with RAMS and Main Contractor stipulations?
-
Is PPE / RPE in good condition and are arrangements for storage sutiable and sufficient?
-
Are face fit test certificates available for RPE users and less than 2 years old?
First Aid / Emergency / Fire Arrangements
-
Are First Aid arrangements provided by the Main Contractor?
-
Are the provisions suitable and sufficient?
-
Are emergency procedures managed by the Main Contractor?
-
Are they suitable and sufficient?
-
Are there adequate Fire Points and means of raising alarm?
-
Who is in control of the sites Fire Arrangements.
-
Are the arrangements suitable and sufficient?
COSHH
-
Are CoSHH Assessments available on site for all products in use?
-
Are the Safety Data Sheets also available?
Housekeeping & Waste
-
Are the Insul-8 work areas maintained in a clean and tidy condition?
-
Have all trip hazards been adequately mitigated?
-
Are pedestrian walkways maintained in a safe condition?
-
Are dust control arrangements suitable and sufficient?
-
Are waste arrangements managed by the Main Contractor?
-
Are the arrangement suitable and sufficient?
-
Is waste suitably segregated for recycling purposes?
Training & Competency
-
Have all the site team got valid CSCS Cards available for inspection?
-
Are personnel adequately trained and is the certification available?
-
If required do the site team have IPAF / PASMA
Wellbeing
-
Is everybody happy in their work?
-
Do the whole team have everything they need to work safely?
-
Does anyone have any suggestions for improvements, i.e. better systems of work etc. (Encourage engagement and feedback, make notes of any information yielded)
Sign Off
-
Have findings of inspection been discussed with the Site Supervisor and any immediate actions dealt with?
-
Date / Time of Inspection Completion:
-
Signature of Auditor