Welfare Facilities Principal Contractor

  • Food and drink preparation area is clean and tidy and equipment in good working order.

  • Drinking water and cups are available

  • Facilities to store, change and dry clothing are available

  • Toilet facilities are available for men and women are in good working order and maintained.

  • Supply of soap and hand towels are available

Parchow office set up

  • Health and safety folders on site

  • Printer

  • Drawing Rack

  • Site Office Signage Displayed

  • Hazard Board completed and in date

  • Office clean and Tidy

Access / Egress Principal Contractor

  • Safe separate access / egress to site for vehicles and pedestrians in place

  • All personnel can reach their area of work safely.

  • Pedestrian walkways are free from slip and trip hazards and obstructions.

  • Are over head services identified and safety measures in place

Risk Assessments and method statements

  • Are risk assessments up to date

  • Have operatives signed up the Risk Assessments

  • Are method statements up to date.

  • Have operatives been briefed and signed Method statements

  • COSHH :- any substances which are hazardous to health have been identified and suitable controls to eliminate or minimise risk of exposure are in place.

  • Start of shift briefing completed by Site supervisor

PPE

  • Head, foot protection and hi-visibility vest/jacket are being worn at all times by all on site personnel

  • Other necessary PPE is being worn for task activities (e.g. goggles, visors, ear defenders, harnesses etc.)

Plant and Equipment

  • Plant inspections are up to date

  • Are daily plant prestart checks completed and recorded

  • Correct plant and equipment is being used for the tasks being carried out

  • Are all operators of plant certified and authorised

  • Are bucket changing areas set up and being used

  • Dangerous parts i.e. guards in place protecting moving parts, Warning signs in cabs and around machines.

Lifting Equipment

  • Are weekly LOLER inspections being completed

  • Plant is operating / lifting on level ground

  • Safe working loads are displayed

  • Lifting equipment being used is certified and been inspected prior to use.

  • Lifting plan has been completed and operatives briefed

Excavations

  • Excavations supported using shoring, trench boxes or battered to a safe angle or stepped

  • Excavation inspection carried out

  • Safe access / egress is available in all excavations

  • All excavations are clearly marked and protected .

  • Materials, spoil and plant are stored a safe distance from the edge of excavations

  • All spoil heaps weathered and battered to a safe angle of repose.

  • Temporary Works design in place for support systems as required

Permits

  • Are permits being used

  • To break ground / to dig

  • CAT & GENY Calibrated and in date

  • Hot works

  • Fire Extinguishers serviced and in date

  • Confined spaces

  • Other safety critical issues

Working Areas

  • Are working areas segregated

  • Free from trip hazards

  • materials stored safely

  • House keeping

Environmental

  • Fuel Bowser on site

  • Is fuel Bowser bunded

  • Emergency items in place (Spill Kit, Drip trays, fire extinguishers)

  • Refuelling area segregated

  • Signage in place

  • Other IEM issues

Sign Off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.