Title Page
-
Prepared by:
-
Client/Contractor:
-
Site Name:
-
Date:
-
safety signs up at main entrance and inside site
-
Site access controlled by by PC/Main contractor and records kept
-
site clean and rubbish taken out
-
storage areas demarcated and signs placed up
-
first -aid box and location displayed with first aider contact number
-
sanitizing station implemented
-
General warning signs available on site
-
Storage areas provided, demarcated and kept clean and tidy
-
Scrap material removed from site daily
-
fire extinguishers available and suitable
-
All site vehicles: TLB/Excavator/Forklift/Scissor lift/etc.... in good working order and supplied with drip trays
-
All drivers in possession of a valid drivers license or valid operating permit
-
Excavation Sloped/Boxed in
-
Excavation barricaded off
-
Warning signs near excavation
-
Ladders at least 6M apart inside Excavation
-
All construction vehicles in good working equipped with drip trays
-
All flammable liquids stored in a locked container/cage with warning signs with a list of flammable liquids
-
All flammable liquids/Chemicals clearly marked on container of what the content inside is
-
Fire extinguishers supplied through out the site for easy access and checked once a month by a competent person
-
Emergency evacuation plan available and implemented
-
All employees supplied correct PPE and using them correctly
-
Adequate ventilation in container/office
-
Adequate lighting on site/office/container
-
changing rooms available and in good condition with cleaning records
-
areas demarcated for employees to eat
-
drinking water readily available
-
Exposure to noise controlled as far as possible
-
Assessment of potential noise levels noted and communicated to employees and records kept there of
-
hearing protective equipment supplied to employees exposed to loud noise
-
All power tools in good working condition
-
Roads sufficiently demarcated and signs showing where construction vehicles may travel
-
independent alarm/whistle on site in case of emergency
-
All temporary works in good order, supported and braced and maintained by competent person with records kept
-
authorization letter from competent person giving permission to cast concrete available
-
safe access to temporary form work provided in forms of ladders, etc....
-
Employees maintaining a 1.5M distance where possible
-
Welding equipment in good working order
-
Protective screens placed around all hot works to protect close by employees
-
hot works permit received for hot works being conducted
-
All walkways clear and free of obstructions
-
Scaffolding erected and inspected by competent person and signed off
-
Safety signage placed up at scaffolding warning nearby employees of working at heights
-