Title Page

  • Site conducted

  • Job Address :
  • Building Description :

  • Completed By :

  • Completed On :

1.0 Site Services

  • 1.1 - Is there site power

  • 1.2 - Is there a site bin

  • 1.3 - Is there a site Toilet

  • 1.4 - Is there access to the site for trailer / Deliveries

  • 1.5 - Is Site driveway suitable for cranes

  • 1.6 - Has slab been left clean and tidy

2.0 Frame Construction

  • 2.1 - Slabs flicked out

  • 2.2 - Termite perimeter Installed

  • 2.3 - Document rectifications etc in builder trend

  • 2.4 - Email Supervisor items to be rectified

  • 2.5 - Has Hardware order been completed

  • 2.6 - Any walls over hang slab edge

  • 2.61 - Email supervisor slab not comply with QBCC Tolerances 5.11 Bottom plates that overhang concrete slabs ref Pg. 28 a suitable solution needs to be presented .

  • 3.0 Defect Items:
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.