Title Page
-
Job #
-
Job Name
-
Jobsite Location
-
Report Date
-
Weather
- Sunny
- Partly Sunny
- Cloudy
- Rain
- Light Rain
- Heavy Rain
- Snow
- Interior
-
Prepared by
Safety Checklist/Schedule
SAFETY
-
Are jobsite safety checklists being completed weekly?
-
First aid kit on jobsite?
-
Safety meetings being held & minutes recorded?
-
Fire extinguishers at each work area & mounted on visible stands?
-
Goggles being worn when required?
-
Excavations over 5' deep properly sloped or shored?
-
Safety rails & barricades in place?
-
Steps & handrails properly constructed at entrances & trailers?
-
Company Minimum Safety Requirements list being followed?
-
Company Personal Protective Equipment requirements being followed?
-
Project safety signage comply with Batten & Shaw standards?
-
Emergency contact list & Action Plan posted? Facility has copy?
-
Is temporary lighting adequate inside the building?
-
Are there any shutdowns occurring in the coming week ?
-
Facility Rep Informed- Date Required
-
Was an Incident Report OSHA Form filled out today?
-
Details
SCHEDULE
-
Project schedule posted in field office & highlighted up to date?
-
Superintendent managing 4-Week Lookahead schedule to Master Schedule?
-
Is the project on schedule? If not, what is the plan to make up time?
-
Plan to Correct:
-
Are key milestones included on Master Schedule & being met?
-
Project Schedule Status:
Site Conditions/Security/Owner/Job Management
SITE CONDITIONS
-
Project generally clean & orderly?
-
Superintendent managing 4-Week Lookahead schedule to Master Schedule?
-
Is the project on schedule? If not, what is the plan to make up time?
-
Plan to Correct:
-
Are key milestones included on the Master Schedule & being met?
SECURITY
-
Job box locked when not attended?
-
Building capable of being locked at night?
-
Tools, trailers, building, & site left in a secure condition when not attended at night?
-
Badging requirements being adhered to by onsite construction personnel?
OWNER
-
Meeting held with Owner or Owner's Rep?
-
Information Discussed:
JOB MANAGEMENT
-
Daily reports up to date?
-
ICRA Program implemented correctly?
-
Are submittals/shop drawings completed & copies on-site? If not, when do you expect completion?
-
Are RFI's, ASI's, & amendments posted on master drawings in field office?
-
Mock-up panels built correctly & approved before work is installed?
-
Pre Installation meetings being conducted & documented per company policy?
-
Is field paperwork delivery to Batten & Shaw home office accurate & timely?
-
Are As-Built drawings being kept up-to-date thru the project?
-
Site observation deficiencies being corrected in a timely manner?
-
Are A/E observations being addressed timely? (5 days)
-
Is quality of work acceptable?
-
Picture
-
Quality of Workmanship:
-
Are subcontractors field test inspection verifications by Batten & Shaw personnel being documented per the contract specification?
-
Has pre-commissioning meeting been held & responsibility matrix been provided to applicable parties?
-
Is the Interim Life Safety Measures (ILSM) plan in place & up to date?
-
Subcontract management policy pre-construction meetings being held & minutes submitted for each trade?
-
Have all ADA requirements been reviewed & confirmed by both BSI field & office?
-
Testing lab conducting all required tests?
-
Any Subcontractors working after hours or weekends without a Superintendent present?
Manpower
Subcontractor Manpower
-
Sitework
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Demolition
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Concrete
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Masonry
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Steel
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Millwork
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Glass/Glazing
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Drywall
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
EIFS
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Painters
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Acoustical Ceilings
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Flooring
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Wet Fire Suppression
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Plumbing
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
HVAC
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
T&B
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Electrical
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Abatement
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Trade
Subcontractor
-
On-Site
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
-
Low Voltage
-
Foremen
-
# of Foreman
-
Men
-
# of Men
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Progress Made
Site Visit Specific Notes
General Project Information:
Project Progress Information
-
Daily Update Pictures
-
Notes
Daily Report Authentication
-
Batten & Shaw Representative