Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

INSPECTION DETALIS

  • Project title and reference number

InspectIon Report Issued To

  • Recipient's Names

INSPECTION CHECKLIST

Quality Checks

  • Are Inspection & Test Plans completed and up to date with all relevant information noted accurately?

  • Have Post-tensioning A3 Grout plans been marked/completed for each slab grouted?

Site Conditions

  • Housekeeping/Site Neat & Tidy?

  • Ground conditions - eg: muddy conditions, ground stability

Waste Material

  • Designated Materials Storage Areas

  • Adequate Waste Control Facilities in place eg: Skip/Waste Bins/Wash Out (concrete/paint)

Air Quality

  • Is dust, vapours & fumes being adequately being controlled

  • No Smoking in Enclosed Areas (site buildings/sheds & confined spaces) Is this being adhered to?

Site Security

  • Are the site gates (pedestrian & vehicle access) being closed/locked

  • Site Perimeter Fencing/Hoarding in good order

Site Access

  • Access ways Neat/Tidy & Free of Equipment/Debris

  • Are Passageways & Emergency Accessways Clear

Site Sheds/Amenities

  • Are all site sheds/amenities clean/tidy & well maintained

Site Services

  • Is there sufficient site services (temporary power boards, water points & toilets)

PPE Compliance

  • Are Mandatory PPE Requirements being complied with?

Noise Control

  • Is construction noise being monitored & adequately controlled

Fall Protection

  • Handrails/Protective Barriers/Mesh Required

  • Tripping Hazards

  • Harness Required

  • Correct Use Of Ladders

  • Deep Excavations Control Measures/Boarding Over Holes/Pits/Gaps

Scaffold Compliance (Mobile & Fixed)

  • Installed by Licensed Scaffolder. Does it have the required scaffold tags & signage

  • Is Scaffold Duty Adequate & Safe For Intended Use

  • Scaffold Inspection Checklist Used Regularly

  • Are exclusion zones In place with adequate signage

Site Safety Checklists

  • Are Weekly Site Safety Checklists Being Completed

Inductions

  • Are all site personnel/visitors inducted

  • Is the Induction Register maintained and up to date?

Toolbox Talks

  • Are Toolbox Talks being conducted?

Risk Management

  • Is the Unified Risk Assessment Register up to date

  • Are Work Activity Specific Risk Assessments in place

SWMS's

  • Are SWMS' s for all high risk tasks in place

  • Have employees and subcontractors signed SWMS's

  • Are employees and subcontractors working to SWMS

1st Aid

  • First Aid Kit in Place & Adequately Stocked

Emergency Requirements & Equipment

  • Is the Emergency Evacuation Plan displayed & up to date

  • Emergency Evacuation Assembly Area Signposted

  • Emergency Equipment in place (siren, fire blanket, fire extinguisher, spill kit)

Confined Spaces

  • Is Confined Space Signage ,Permits, Recovery Equipment & Air Monitoring In Place If Required

Asbestos

  • If asbestos has been identified on site is/has it been dealt with in the approved manner

  • Is There An Asbestos Register In Place If Required

Non Conformances

  • Are NCR's being issued appropriately when required

Injuries

  • Are Injuries being registered, reported & investigated

Underground Services Identification

  • Has underground services been identified on this site(as builts, dial before you dig & services locator)

Electrical Compliance

  • Electrical Register Up To Date

  • Is there adequate RCD protection on site

  • Are all electrical items tested and carry a current tag

  • Onsite Generators RCD protected

Temporary Distribution Boards

  • Is The Temporary DB in a Suitable Location (does the DB have 1m clearance in front for access) & does the cover have a retaining hinge & is it lockable

  • Main Isolating Switch Within Temporary DB

  • Is the board secured to the wall or ground, does it have support brackets & cut outs for leads

Plant & Equipment

  • Is all plant on site inducted & registered?<br>Are the following details being provided, copied & filed;<br>Plant details<br>Licenses<br>Maintenance records<br>Operator licenses<br>Chains/slings/pipes etc records

  • Are All Guards/Screens on Equipment(eg. Grinders, drop saws, welding screens etc)

  • Welding/Cutting Equipment Secure & Isolated (eg. Oxy/acetylene bottles on trolleys/chained & not in passageways

  • Are surrounding conditions for plant & equipment safe ie: access, ground conditions & overhead factors

  • Is equipment calibrated and is there a current calibration certificate available? (E.G. Hydraulic Stressing Jack)

Hazardous Substances & Material Safety Data Sheets (MSDS's)

  • Is the Hazardous Substance Register up to date & MSDS's up to date (are MSDS's less than 5 years old)

  • Are there any hazardous/ dangerous goods on site & are these stored/ controlled appropriately

Work Permits

  • Are all necessary permits in place & registered. (TCPL/CLIENT/LEGISLATIVE)

Traffic Control (AS1742.3)

  • Is the TCPL Traffic Management Plan up to date

  • Is a traffic control plan required & if so are the necessary licenses in place

  • If required is the necessary signage & traffic control personnel in place

Formwork (must comply to (AS3610)

  • Has a Risk Assessment /Checklist been Completed

  • Is it Structurally Adequate/Designed/Built/Maintained so as to Support Loads that are to be placed on the deck

  • Are Formworkers Competent (Ticketed)

  • Access to Formwork/Handrails/Kickboards/Safety Nets/Exclusion Zones adequate

  • Are Materials Stacked/Stored on Deck Correctly (no overloading of materials)

  • Is the Access Under the Deck Closed During Concrete Pours (close off or exclusion zones)

  • Any Electrical Hazards Exist

  • Is Formwork Being Dismantled Safely

Site Management Plans

  • Are the Site Safety, Site Management, Environmental Management & Waste Management Plans on site & up to date

Environment Controls

  • Are adequate environmental controls in place ie: siltation, water, dust, noise & heritage

Other Observations

  • ADD DETAILS HERE IF ANY

  • ADD PHOTOS HERE IF NECESSARY

Conclusions & General Recommendations

  • Work to be immediately implemented to rectify the above defects to make the site safe as soon as possible

Sign Off

  • On Site Representative Signature

  • Author's Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.