Audit

Weather

Has issues from previous audit been reviewed and fixed?

Are all required personnel familiar with and signed onto relevant SWMS?

Is traffic management in place?

Is there adequate delineation from other works/plant in the area?

Are all personnel wearing appropriate PPE (Hi-Vis vest, safety glasses, hard hat, long sleeves, trousers, gloves)?

Are safety caps on all protruding reo bars?

Are all man-holes/pits covered with steel plates?

Are all tools stored and off the ground?

Are all power tools, extension cords and equipment in good condition and tags up to date if required?

Have all vehicles and plant got working reversing beepers and flashing safety lights?

Is all required ERSED in place and in good condition?

Formwork neatly stacked and out of the road?

Reo bar and mesh stored in a neat manner and out of the way?

Is weather conditions adequate for pouring concrete?

Safe access and egress for site and work area?

General cleanliness of site/work area?

General comments, improvement to be made

Additional photos
Representative who conducted audit
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.