Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Weather
- Raining
- Overcast
- Clear
- Hot
- Cold
- Mild
-
Has issues from previous audit been reviewed and fixed?
-
Are all required personnel familiar with and signed onto relevant SWMS?
-
Is traffic management in place?
-
Is there adequate delineation from other works/plant in the area?
-
Are all personnel wearing appropriate PPE (Hi-Vis vest, safety glasses, hard hat, long sleeves, trousers, gloves)?
-
Are safety caps on all protruding reo bars?
-
Are all man-holes/pits covered with steel plates?
-
Are all tools stored and off the ground?
-
Are all power tools, extension cords and equipment in good condition and tags up to date if required?
-
Have all vehicles and plant got working reversing beepers and flashing safety lights?
-
Is all required ERSED in place and in good condition?
-
Formwork neatly stacked and out of the road?
-
Reo bar and mesh stored in a neat manner and out of the way?
-
Is weather conditions adequate for pouring concrete?
-
Safe access and egress for site and work area?
-
General cleanliness of site/work area?
-
General comments, improvement to be made
-
Additional photos
-
Representative who conducted audit