Information
-
Document No.
-
Client / Site
-
Conducted on
When completed and all necessary corrective actions implemented, this report is to be forwarded to management.
-
Work Location/Project:
-
Date Of Inspection
House Keeping / Emergency Equipment
-
Are all areas clean, clear & free of slip/trip hazards
-
Caps on reinforcement bars and Star pickets
-
Are materials stored appropriately
-
Are access ladders and stairs in good condition
-
Are emergency exits clear
-
Is installed fire equipment maintained
-
Are first aid kits available and maintained
Personal Protective Equipment
-
Is safety footwear worn by all
-
Are hard hats worn where required
-
Is hearing protection worn in noisy areas
-
Are respirators being worn when required
-
Is eye protection worn when required
-
Are road safety vests worn when required
-
Is corrective PPE available
Electrical Safety
-
Is electrical equipment tested, Is it tagged
-
Where required, are leads elevated
-
Is electrical equipment free of water, heat sources and cutting points
-
Excavations / Confined Spaces
-
Is the required access permit held
-
Are all openings barricaded
-
Are all excavations correctly battered / shored
-
Is access and egress provided
-
Are spoil heaps clear of excavation
Hazard Materials
-
Are all hazardous Materials labeled
-
Are all Material Safety Data Sheets available
-
Is material stored in the correct location
Working From Heights
-
Are heights clear of power lines
-
Scaffolds - Fully boarded, guard rails and toe boards
-
Are ladders tied off, angled correctly (1 in 4) and extended 1m above landing
Safe Work Instructions / JSEA's
-
In order to meet legislative compliance requirement
-
Workers involved in JSEA development, are site specific
-
Reviews carried out as scheduled (period noted on JSEA)
-
Are controls implemented, effective and meet legislative requirement
-
Are SWI's developed, consistent with the Risk Assessment on JSEA
Environmental Controls
-
Are dust control activities effective
-
Are sedimentation controls effective
-
Is emergency spill kit on site
-
Is the noise generated on site within acceptable limits
Quality Controls
-
Are all QA documentation and checklists being used
-
Has all the corrective / required site-specific documentation been provided and being used ( e.g Drawing register, DBYD info, specifications, compaction tests, construction program)
Operation of Plant
-
Unit Number:
-
Pre-start completed
-
Operates as per competency standards
-
Are controls implemented, effective and meet legislative requirement
-
Is all moving machinery & nip points guarded / Quick Hitch Safety Pins in place
-
Are all lock out devices operating
-
Have plant compliance statements been completed for all hired / sub-contracted plant on site
Operation of Plant
-
Unit Number:
-
Pre-start completed
-
Operates as per competency standards
-
Are controls implemented, effective and meet legislative requirement
-
Is all moving machinery & nip points guarded / Quick Hitch Safety Pins in place
-
Are all lock out devices operating
-
Have plant compliance statements been completed for all hired / sub-contracted plant on site
-
Where required, do operators hold appropriate certificate
Operation of Plant
-
Unit Number:
-
Pre-start completed
-
Operates as per competency standards
-
Are controls implemented, effective and meet legislative requirement
-
Is all moving machinery & nip points guarded / Quick Hitch Safety Pins in place
-
Are all lock out devices operating
-
Have plant compliance statements been completed for all hired / sub-contracted plant on site
-
Where required, do operators hold appropriate certificate
General
-
Are all required access and other permits held
-
Safety signage and Mendi site signs in place
-
Do on site amenities comply with advisory standard
-
Is site Safety / Environmental control Plans and all associated control documentation in ISMP (e.g Traffic, Erosion & Sedimentation, contractors SWMS's)
-
Have all been site inducted
-
Are manual handling aids used where applicable
OTHER problems found during inspection
-
Action required
-
Safety Inspection Conducted By:
-
Select date
-
Reviewed By:
-
Select date