Information

  • Document No.

  • Client / Site

  • Conducted on

When completed and all necessary corrective actions implemented, this report is to be forwarded to management.

  • Work Location/Project:

  • Date Of Inspection

House Keeping / Emergency Equipment

  • Are all areas clean, clear & free of slip/trip hazards

  • Caps on reinforcement bars and Star pickets

  • Are materials stored appropriately

  • Are access ladders and stairs in good condition

  • Are emergency exits clear

  • Is installed fire equipment maintained

  • Are first aid kits available and maintained

Personal Protective Equipment

  • Is safety footwear worn by all

  • Are hard hats worn where required

  • Is hearing protection worn in noisy areas

  • Are respirators being worn when required

  • Is eye protection worn when required

  • Are road safety vests worn when required

  • Is corrective PPE available

Electrical Safety

  • Is electrical equipment tested, Is it tagged

  • Where required, are leads elevated

  • Is electrical equipment free of water, heat sources and cutting points

Excavations / Confined Spaces

  • Is the required access permit held

  • Are all openings barricaded

  • Are all excavations correctly battered / shored

  • Is access and egress provided

  • Are spoil heaps clear of excavation

Hazard Materials

  • Are all hazardous Materials labeled

  • Are all Material Safety Data Sheets available

  • Is material stored in the correct location

Working From Heights

  • Are heights clear of power lines

  • Scaffolds - Fully boarded, guard rails and toe boards

  • Are ladders tied off, angled correctly (1 in 4) and extended 1m above landing

Safe Work Instructions / JSEA's

  • In order to meet legislative compliance requirement

  • Workers involved in JSEA development, are site specific

  • Reviews carried out as scheduled (period noted on JSEA)

  • Are controls implemented, effective and meet legislative requirement

  • Are SWI's developed, consistent with the Risk Assessment on JSEA

Environmental Controls

  • Are dust control activities effective

  • Are sedimentation controls effective

  • Is emergency spill kit on site

  • Is the noise generated on site within acceptable limits

Quality Controls

  • Are all QA documentation and checklists being used

  • Has all the corrective / required site-specific documentation been provided and being used ( e.g Drawing register, DBYD info, specifications, compaction tests, construction program)

Operation of Plant

  • Unit Number:

  • Pre-start completed

  • Operates as per competency standards

  • Are controls implemented, effective and meet legislative requirement

  • Is all moving machinery & nip points guarded / Quick Hitch Safety Pins in place

  • Are all lock out devices operating

  • Have plant compliance statements been completed for all hired / sub-contracted plant on site

Operation of Plant

  • Unit Number:

  • Pre-start completed

  • Operates as per competency standards

  • Are controls implemented, effective and meet legislative requirement

  • Is all moving machinery & nip points guarded / Quick Hitch Safety Pins in place

  • Are all lock out devices operating

  • Have plant compliance statements been completed for all hired / sub-contracted plant on site

  • Where required, do operators hold appropriate certificate

Operation of Plant

  • Unit Number:

  • Pre-start completed

  • Operates as per competency standards

  • Are controls implemented, effective and meet legislative requirement

  • Is all moving machinery & nip points guarded / Quick Hitch Safety Pins in place

  • Are all lock out devices operating

  • Have plant compliance statements been completed for all hired / sub-contracted plant on site

  • Where required, do operators hold appropriate certificate

General

  • Are all required access and other permits held

  • Safety signage and Mendi site signs in place

  • Do on site amenities comply with advisory standard

  • Is site Safety / Environmental control Plans and all associated control documentation in ISMP (e.g Traffic, Erosion & Sedimentation, contractors SWMS's)

  • Have all been site inducted

  • Are manual handling aids used where applicable

OTHER problems found during inspection

  • Action required

  • Safety Inspection Conducted By:

  • Select date

  • Reviewed By:

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.