INFORMATION
-
Project / Site Name
-
Supervisor / Foreman at time of this inspection
-
Approximate Number of Persons on site at the time of visit.
-
Select site weather conditions at time of this inspection (select all that apply)
- Dry & Cloudy
- Dry & Sunny
- Cloudy & Damp
- Rain Showers
- Raining
- Snow
- Windy & Gusty
-
Minimum temperature today?
-
Maximum temperature today?
-
Current activities being undertaken on site (select all that apply)
- General
- Groundwork
- Demolition
- Pile Driving
- Formwork
- Reinforce Steel
- Steel Erection
- Mechanical
- Electrical
- Plumbing
- Glazing
- Cladding/Roofing
- Drywall
- Painting
- Sitework
- Excavation
- Underground Work
- Stair Installation
- Cleanup
- OTHER
Summary Statement / Actions or Improvements Required.
-
Any further comments or recommendations arising from this inspection?
-
Insert Relevant record photo's
General
-
Is there a suitable Fire Risk Assessment in place for the Accommodation and Site works Areas
-
Are H&S Posters on display and filed in correctly?
-
Is the F10 notification on display, up to date and covering expected construction period
-
Are Employees and Employers Are Liability Insurance Documents displayed and in date?
-
Are Site Management contact details displayed.
-
Is the Construction Phase Plan on site, updated to be relevant, reflective of works on site. Updated to reflect staff changes and responsibilities.
-
Are Risk and Method Statements in place and appropriate for the work currently on site.
-
Are initiatives in place to ensure continuous safety improvements? (CCS)
-
Does the site encourage attitudes and behaviours that enhance safety performance? (CCS)
-
Are systems in place that care for the safety of the public, visitors and workforce (CCS)
-
Are suitable, hygienic and well maintained welfare facilities provided within a reasonable distance of the work area (CCS)
-
Does the site demonstrate a commitment to respect, fair treatment, encouragement and support?(CCS)
-
Does the site care for the health and wellbeing of the workforce? (CCS)
-
Have all risks to neighbours and the public been considered and addressed (CCS)
First Aid Facilities
-
Are first aid facilities to be inspected in this audit?
-
Are first aid cabinets and contents clean and orderly, sufficient for the number of persons on site.?
-
Sterile first aid contents within their expiry date?
-
First aid cabinets/box clearly labelled?
-
Is there easy access to first aid cabinets?
-
Employees aware of location of first aid cabinet?
-
Are first aid officers known to workers and accessible?
-
Are emergency numbers displayed?
Access and Egress
-
Access & Egress to Inspected
-
Is there safe access and egress to all working areas of the site?
-
Have pedestrian walkways been provided to protect them from moving vehicles?
-
Are walkways free from obstructions and stored materials?
-
Are access routes adequatelly lit?
-
Access and Egress compliant?
Fire Prevention & Emergency
-
Are fire and emergency procedures to be inspected in this audit?
-
Timber Frame Buildings and structures over three storeys high should be specifically reviewed for Fire Management information. Take particular note of fire alarms, particularly wireless types, are they working correctly, do you have an audible alarm in all areas of the site. Have all fire fighting equipment got records of inspection or test dates available? Is there a Fire Risk Assessment in place for partial or progressive occupation, including Sales Areas.
-
Emergency & Fire Evacuation plan displayed and understood by all employees?
-
Sample site staff for general understanding of Fire /Emergency plan
-
Evacuation procedures discussed regularly? (3 to 4 times a year)
-
Exit doors easily opened from inside?
-
Exits clear of obstructions?
-
Emergency exit lighting operable or fluorescent signage in place?
-
Adequate direction notices for fire exits?
-
Extinguishers in place, clearly marked for type of fire?
-
Extinguishers recently serviced? (check punch mark on tabs)
-
Extinguishers clear of obstructions?
-
Fire alarm system functioning correctly?
-
Fire Alarm System suitable for the spread of site, audibility across site considered.
Site Security
-
Is site security to be inspected in this audit?
-
Are site entry and exit points clearly designated?
-
Does the external appearance of the site present a positive image of the industry (CCS)
-
Does the external appearance of all facilities, stored materials, vehicles and plant make a positive impression (CCS)
-
Is site access and egress secure against unauthorised access at all times.
-
What actions are taken to keep the perimeter and surrounding areas clean, tidy and free of litter, mud and dust? (CCS)
-
What arrangements are in place to ensure that the public and visitors see a site that is organised, clean and tidy? (CCS)
-
Is clear signage requiring visitors to check in posted?
-
Is site perimeter fenced off appropriately with required site public signage posted?
-
How does the site encourage the workforce to contribute to cleanliness and good housekeeping? (CCS)
-
Are all entries and exits closed and locked at night and during weekends?
-
How are company values, corporate identity, and a positive industry image promoted? (CCS)
-
If applicable, are site alarm systems functioning as expected?
-
If applicable, are site security procedures (guard patrols, security checks etc) undertaken as required and reviewed regularly?
Personal Protective Equipment (PPE)
-
Is Personal Protective Equipment to be inspected in this audit?
-
Does the appearance of the workforce project a positive impression? (CCS)
-
Is head protection worn correctly and where required?
-
Is general light eye protection worn as standards policy?
-
Are the correct forms of eye protection worn for tasks being completed?
-
Is hearing protection worn in designated areas?
-
Are the correct forms of hand protection worn for manual tasks
-
Is respiratory protection worn where dust, mist or fumes are present?
-
Is footwear in good condition and of correct type?<br>
-
Are high-vis vests or clothing worn at all times outside the office?
-
Are safety harnesses appropriately worn at height?<br>
-
Is additional PPE used where required?
-
Are staff aware of correct PPE for tasks they are trained to perform?
Trip and Fall Safety
-
Trip and fall safety to be inspected in this audit?
-
Are floor surfaces reasonably even and uncluttered, free from trips, large rubble pieces and boulders etc? Are holes and penetrations adequately protected?
-
Are entry points and walkways across the site and/or to offices and welfare areas kept clear?
-
Are walkways adequately demarked and physically segregated from machinery movements etc.
-
Are walkways and general access kept clear of materials and storeage boxes etc?
-
Are stairs and risers kept clear?
-
Are all floor surfaces free of liquid spills?
-
Are handrails and barriers in good condition?
-
Are fall preventive measures in place and used where gaps occur in railings?
-
Barriers to prevent falls should as a minimum be in accordance with the Edge Protection Federation guidelines, securely linked and fixed to prevent unauthorised movement. Barriers should be secured at least 1.5 m from open edges where ever possible. Any Temporary covers will need to be logged and dealt with in accordance with Temporary Works categorisation.
-
Are appropriate measures in place to prevent falls? ie. physical barriers, handrails, temporarily secured covers?
-
Is all fall protection equipment visually inspected prior to use - is this recorded?
-
Are all works where there is a potential for an injurious fall being carried out safely?
-
This includes all riser and shaft areas, manholes and pits. All openings where there is potential for materials to drop through or for footfall to access should be covered or guarded using items appropriate to the expected traffic loadings.
Covers to openings and pits in-vehicle access areas need to be of suitable construction to safely take the maximum expected traffic loading, and be signed accordingly. -
Are all floor openings fully barricaded or are protected with a secured cover and labelled?
-
This should include areas, where materials could be kicked or drop through such as riser shafts or staircase landings etc, suitable coverings and / or toe boards, should be installed.
-
Are personnel below protected from falling materials (i.e. tools, bolts, etc.)?
-
Is there proper scaffolding in place?
Scaffolding
-
Scaffolds to be inspected in this audit?
-
Are scaffolds constructed and erected only by qualified and trained personnel?
-
Unless the scaffolding is designed and erected in accordance with TG2013 then a specific design will be required. The TG2013 drawings should be available on site for inspection. Ensure the loading catagory is clearly stated on the handover certificates.
-
Have all scaffold plans been submitted and approved?
-
Are scaffolds accessible and clear of unstable objects and trip hazards?
-
Is scaffold adequately secured to building (or appropriately secured with alternative method)?
-
Are double guard rails, toe boards (and brick guards installed where appropriate) on all scaffolds?
-
Are scaffold footings stable, secure and free of unstable propping objects (barrels, boxes, loose brick or concrete blocks etc)?
-
Are scaffold footings and anchorages designed to support the maximum intended load without settling or displacement?
-
Are scaffolds generally safe and orderly?
-
Inspections should be at maximum intervals of 7 days. Additional inspections required following any alterations or adjustments or following an incident of high winds or other inclement weather events or after an incident where the scaffolding has been impacted by vehicle movements or and standard base, plates have been displaced.
-
Are scaffolds being regularly inspected?
-
Scaffold shrouding / screening - wind loading approved, tidy and of good appearance (CCS)
Hazardous Manual Tasks
-
Hazardous Manual Tasks to be inspected in this audit?
-
Hazardous manual handling tasks should be reviewed on the basis of what harm and level of risk are involved. Remember harm can be caused by excessive repetitive movements of relatively light loads, particularly if carried out in a crooked or stooped position.
-
Have Hazardous Manual Tasks on site been identified?
-
Have Risk Assessments for these tasks been completed where required?
-
Always review on the basis that the hazard should be eliminated from the outset. Check RAMS etc to see if other options have been considered or is this task just being accepted as inevitable. For instance, ceiling boards, have board lifters been requested in the RAMS or is it just noted as being down to site to arrange to position manaully.
-
Have Risk controls been selected for these tasks using the hierarchy of controls?
-
Are suitable controls in place for high force / awkward postures?
-
Are suitable controls in place for repetitive tasks?
-
Have the procedures surrounding risk controls been documented?
-
Spot check RAMS on site then observe sample works on site.
-
Are workers compliant with the above procedures?
-
Are relevant workers trained in these controls?
-
Has this training been documented?
Hand and Power Tools
-
Hand and power tools to be inspected in this audit?
-
Tool Guards also include items such as Riving Knives for saw blades, these are required to prevent kick back, guards should be self-closing, consider where the equipment is being used, is it positioned safely.
-
Are all tool guards in place and operable?
-
Check leads for crushing damage, splits and or tears in outer sheathing, exposure of inner insulated cores, particularly around entry points to equipment and plug ends. Check cable drums for casing integrity or damage. Are these items uniquely marked and registered?
-
Are power cords in good condition?
-
Class II Double Insulated equipment is robustly insulated and should be clearly marked with a square inside a square symbol. If this marking cannot be found on the equipment then you should assume it is Class I grade and requires a suitable earth connection to be in place.
-
Are all tools double insulated or have a ground plug?
-
Are ground fault circuit interrupters in place at the source of electricity?
-
Are all power tools in good condition?
-
Are defective pieces of equipment and tools tagged and removed from service?
-
Are employees using the proper tool for the task they are performing and are they using them correctly?
-
Are employees using two hand on tools that are designed to do so?
-
Are dust collectors and exhausts provided on tools that produce dustMachinery ?
General Machinery, Plants and Equipment
-
General Machinery, Plants and Equipment to be inspected in this audit?
-
Plant & Machinery will include Cranes (Towers and Mobiles) Excavators, Dumpers, Rollers, Mixers, Etc, Etc. Equipment will include Tower Scaffold, Poium Steps Etc.Etc.
-
Have risk assessments been completed for machinery where appropriate?
-
Is there a schedule of common lifts in place for equipment such as Telehandlers, HIAB Units, Fork Lifts, Excavators used for lifting
-
Mobile Cranes and Tower Cranes require lift plans and slinging schedules - are these available?
-
Is there an Appointed Person in attendance or contactable during working hours?
-
Is there adequate supervision of the lifting and slinging operations at all times?
-
Records of thorough examination available for the cranes and all lifting equipment / accessories.
-
If Anti Collision systems are in place (SMIE or radio) are they working effectively and correctly.
-
Is Rescue Plan for tower crane operators in place, has it been practiced in last 6 months, are trained staff available on site.
-
Basic maintenance regime includes daily operator checks and inspection records as well as formal period inspections.
-
Are maintenance schedules in place for machines and equipment?
-
Do records indicate that machine maintenance schedules are being adhered to?
-
If required, are relevant pre-start inspections being completed on machinery, equipment and plants?
-
Are machines kept as clean as practicable?
-
Are guards in good condition?
-
If required, are emergency stops fitted on machinery, equipment and plants?
-
Are drip pans or plant nappies provided to prevent spillage onto the ground or floors for any standing or parked up plant.
-
Are spill containment materials available on the plant and equipment, is there kits located at fuelling points.
-
Noise levels controlled?
-
Is there sufficient room to use all machines safely, are pedestrians generally restricted from accessing machine working areas.?
-
Are machine, equipment and plant operators trained/inducted to be competent in safe and correct operation?
-
Is this training recorded?
-
Do operators comply with the training?
Ladders - Stepladders - Hop Ups etc.
-
Ladders to be inspected in this audit?
-
Are all ladders and step ladders Industrial strength? (Non-Household rated, check the label, British Standard (BS) Class 1 ‘Industrial’ or BS EN 131 recommended - 150Kg loading)
-
Are ladders in good condition?
-
If used for electrical work are ladders non conductive? (wood or fibre glass.)
-
Are ladders and stepladders being used according to instructions?
-
For extension ladders: are ropes, pulleys and treads in a good state of repair?
-
Remember the hierarchy of control in selecting the right type of equipment, elimination where possible, reduction of risk by use of items such as podiums, tower scaffolds, MEWPS etc. Where steps and ladders are to be used these should be subject to specific assessments.
-
Are hop ups, steps and ladders being used to access heights when a higher order controls should be used?
-
Hop Ups - Of minimum height <600 high -- over 500 sq -- optional handrails fitted. - SWL over 150Kg
Electrical Safety
-
Electrical safety to be inspected this audit?
-
Electrical installation to site cabins should be inspected and signed off upon the first installation then annually.
Equipment in cabins such as fridges kettles etc should be inspected every 6 months.
Equipment used out on the site should be inspected as frequently as necessary depending on use but should not be more thane three monthly cycles. -
Are suitable safety switches installed at the distribution points?
-
Are safety switches tested every 6 months and tests recorded?
-
There are no outlets overloaded / No double adapters in use?
-
Are portable items uniquely referenced so inspection data can be cross-checked if not physically tagged.
Who has carried out the inspection / test. -
Has portable equipment been suitably inspected tested and tagged -- has this been registered?
-
Are there any broken plugs, sockets or switches, pulled cable sleeving or exposed inner cores?
-
Are there power leads being left as potential trip hazards
-
Is there evidence of damaged insulation or another part of leads or fittings.?
-
Are there any no strained leads -- inner cores showing at fitting points?
-
Are portable power tools in good condition (casings, lead connections and switches all in good order)?
-
Where required are emergency shut-down procedures in place?
Chemical Safety
-
Chemical safety to be inspected this audit?
-
Is a Hazardous / flammable Substance Register complete and available at the site and for Emergency Services?
-
Are Material Safety Data Sheets available for all chemicals?
-
Have COSHH risk assessments been completed for hazardous substances?
-
Are all containers labelled correctly?
-
Are unused substances disposed of?
-
If applicable are special storage conditions followed?
-
Are workers trained in the use of hazardous substances?
-
Is adequate ventilation provided?
-
Are eye washes and showers available and easily accessible?
-
Are spill kits or other clean up arrangements available?
Confined Spaces
-
Confined spaces safety to be inspected this audit?
-
Do the confined spaces have any risk of the "Specified Risks" under the Confined Spaces Regulations 1997.
-
If air or gas monitoring is employed is the monitor calibrated, is it applicable to the type of gas/fume/ vapour
-
Do all applicable confined space works have adequate permits granted and documented?
-
Is a confined space emergency plan in place and have suitable staff been allocated
-
Are confined spaces being continually monitored?
-
Are all workers undertaking confined space works trained in confined space entry and activities - including emergency procedures?
Incident, Injury & Accident Procedures
-
Incident, Injury & Accident Procedures to be inspected this audit?
-
Are Incident, Accident, Near Miss and Injury procedures in place?
-
Are adequate reporting forms for for these events in place?
-
Are all incidents investigated?
-
Are Root Causes identified and Corrective Actions then implemented?
-
Are Workers Consultation and Coordination Programs in place?
Sign Off
-
Name & Signature of Inspector
-