Information

  • SBC Works Inspection

  • Contractor Monitoring Checks

  • SBC Trade or Contractor (State name):

  • Location: Project/Site Name/Job Number(if available):

  • SBC Manager

  • Prepared by:

  • Report No:

  • Conducted on

Safety Checks

  • 1) For Contractor Monitoring Checks: <br>Construction Phase Plan - is this document available outlining the H&S Mgt. of the project?

  • 2) For Contractor Monitoring Checks:<br>Statutory Information - availability of Licences, Insurance (PL), F10, HSE Law Poster, Contractor accreditation so etc.

  • 3) Safety Documentation:<br>(RA/MS/SSOW)

  • 4) Training Records:<br>(Are there valid training records/certificates for the work at hand e.g CSCS, CITB, GAS SAFE etc., Valid asbestos awareness training for example?)<br>

  • 5) Site security & Signage:<br>(Availability of controlled, restricted site access with appropriate signage)

  • 6) Workplace Traffic Management:<br>(Separation of workforce & vehicles - traffic mgt., pedestrian access/walkways, barriers, signage etc.)

  • 7) Work Environment:<br>(Safe access/egress free from hazards and obstructions, Good housekeeping, hazard and safety signage on entrance(s) clearly visible.)

  • 8) Welfare Arrangements:<br>(Access to washrooms and rest facilities, clean, sanitary and tidy.)

  • 9) Fire Safety Arrangements:<br>(Site evacuation arrangements - fire alarms, fire fighting equipment, emergency escape routes, assembly points etc.)

  • 10) First Aid Arrangements:<br>(First aid kits accessible & contents in date, eye wash easily available and in date where provided.)

  • 11) PPE Suitability & Use:<br>(Correct PPE provided for the job, PPE being used correctly, availability of PPE signage, PPE maintained in good condition)

  • 12) Manual Handling:<br>(Are handling aides/equipment available for heavy items/loads, are safe lifting techniques being employed where observed?)

  • 13) Tools & Plant:<br>(Valid inspection & maintenance certification and tags, step ladders & ladders tagged and in date, scaffolds erected with valid inspection tags, electrical equipment tested, tagged and in date. Lifting equipment maintained and inspected, work at height access equipment maintained and inspected, plant/machinery guarding in place, plant cannot be operated when left unattended etc.)

  • 14) Work at Height:<br>(Is there a risk assessment in place for the work at height? Are appropriate control measures in place for the works at height?)

  • 15) Excavations:<br>(Is there a SSOW/RA for the excavation works? Is there CAT & GENNY equipment available to survey for buried services? Is the detection equipment calibrated within the last 12 months and tagged?)

  • 16) Environmental Controls/Waste Management:<br>(Is waste disposed of correctly, are waste transfer notes available, are spill kits accessible where the likelihood of a spill may occur, are there any other environmental issues such as noise or dust and are there adequate controls in place?)

  • 17) Asbestos Management Survey:<br>(Is there a management survey available? Are operatives working in accordance with the asbestos information provided?)

  • 18) Asbestos R&D Survey:<br>(Is there a Refurbishment & Demolition survey available? Are the operatives working in line with the survey information provided?)

Report Conclusion

  • Observations/Additional Comments:

  • Add media

Report Sign Off / Received By (On Site Supervisor):

  • Received By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.