Information
PROJECT
-
Location
-
Scope and Duration
-
Project Manager
-
Main Contractor
-
Conducted on
-
Photograph
-
Prepared by
GENRAL REQUIREMENTS
-
Partial Building (YES) or Whole Building (NO)
-
All persons on site have undertaken the University's Site Induction at Estates?
-
All persons on site have signed in at Estates?
-
Suitable provisions have been made for toilets and general welfare?
-
The Maintenance Department, Building Fire Safety Monitor, Facilities Manager and Security are aware of the works
-
All potential hazards eg asbestos have been identified?
-
All persons on site have Undertaken the Contractors and the University's Site Induction?<br><br>Evidence required
-
All persons on site have signed in the site cabins
-
Suitable provisions have been made for toilets and general welfare?
-
All potential hazards eg asbestos have been identified?
-
The Maintenance Department, Building Fire Safety Monitor, Facilities Manager and Security are aware of the works
SITE INSPECTION - Authorisation
-
Contractors Authorisation to work in place?
-
RAMS in place?
-
Permit to Work in place?
SITE INSPECTION - External and Entrance to site
-
External site is clear from any Hazards/Waste Material
-
Appropriate Signage in place?
-
Vehicles parked in agreed location?
-
Appropriate barriers in place?
-
Separate pedestrian and vehicle routes are clearly marked?
-
Public access has been agreed and approved by the building user?
-
Access and egress are level and free from trip hazards or obstructions?
-
Emergency escape routes are not compromised?
SITE INSPECTION - Internal
-
Internal site is clear from any hazards/waste materials
PPE - All contractors have suitable PPE in line with RAMS?
-
Safety Boots<br><br><br><br>
-
Hard Hat<br><br>
-
Hi Viz <br><br>
-
Gloves<br><br>
-
Ear Protection
-
Other
Additional Items
-
Are you satisfied with Site Activities?
-
Are you satisfied the all Hazards are being Controlled Satisfactorily?
-
Are you satisfied the there are no additional Health and Safety concerns?
-
Are you satisfied that there are no other issues that need addressing?
-
Enter Contractors Name and Signature.
-
Enter Auditor's Name and Signature.