Information
PROJECT
-
Location
-
Scope and Duration
-
Project Manager
-
Main Contractor
-
Conducted on
-
Photograph
-
Prepared by
1. ON DISPLAY
-
Form F10
-
HSE Poster
-
Fire Plan/Evacuation Signs
-
Key Personnel Contact Details
-
Warning Signs/Notices
2. AVAILABLE ON-SITE FOR INSPECTION
-
Construction Phase Plan
-
Risk Assessments and Method Statements
-
Asbestos Report
-
Accident Book Forms
-
Emergency Plan
-
First Aid Box
-
Visitors Sign-In Book
-
Safety Induction Register
-
Scaffold Register
-
Plant Inspection Records
-
Excavation Inspections
-
If hazardous waste is being removed from site are the relevant licenses and/or permits in place
Traininig Records Available On-Site (Operator Competency Cards/ Certificates, CSCS/CPCS etc
-
Abrasive Wheels
-
Plant Operators Card
-
First Aider at Work/Appointed Persons
-
Mobile Scaffold Card (PASMA)
Welfare Facilities Inspection
-
Are there sufficient facilities for the work being undertaken and number of workers on site? (Toilets, storage for clothing, changing facilities etc)<br><br><br><br>
-
Is the lighting, heating and ventilation adequate?<br><br>
-
Is there drinking water and cups available<br><br>
-
Is there warm water, soap and drying facilities available?<br><br>
Comments/Action Required
-
Additonal Observations
-
Are you satisfied the all Hazards are being Controlled Satisfactorily?
-
Are you satisfied the there are no additional Health and Safety concerns?
-
Are you satisfied that there are no other issues that need addressing?
-
Enter Contractors Name and Signature.
-
Enter Auditor's Name and Signature.