Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
The site safety diary must be completed with any relevant information like photo's, discussions, verbal instructions to whom etc. If NO has been marked for a question, actions of rectification must be included.
Administration
-
Do all trades onsite have Construction Induction cards (red, white)?
-
Are Employer Safety Pack (ESP) Inductions completed?
-
Have Safe Work Method Statements (SWMS) been reviewed, completed and signed off?
-
Are all relevant Materiel Safety Data Sheets (MSDS) available onsite?
-
Are site safety signs displayed?
-
Has site specific hazards been clearly outlined on the site safety coordination plan sign?
-
Is ESP and first aid box onsite?
Housekeeping
-
Is personal protective equipment being worn where required?
-
Is site clean internally/externally?
-
Is there clear access to all work areas onsite?
-
Is toilet clean and fully stocked with toilet paper?
Fall Protection
-
Are fall protection systems installed for works at 2.0 meter heights and over?
-
Are fall protection systems compliant?
-
Is handover or compliance certificate displayed?
Plant & Machinery
-
Is mobile plant or machinery onsite? If yes, plant & equipment checklist must be completed.
Electrical Equipment
-
Are all electrical leads onsite tested and tagged?
-
Are leads organised on lead stands or the like not creating trip hazards, running through water, or placed on metal/steel structures?
-
Has the power supply unit been tested and currently tagged?
Sign Off
-
Person submitting inspection report?