No employees may stay on site over shutdown period without permission from the Client. Permission obtained?
-
Decking boards / sheeting securely fixed and stored to prevent movement during high winds?
Emergency Contact Details
Safety and Security
-
Standby persons nominated by General Contractor and Sub-Contractors to respond to emergency situations?
-
Arrangements made for after hours security?
-
Emergency numbers clearly displayed on site information boards and at security hut?
-
All perimeter fences, gates and barricades secured and in good condition to prevent unauthorised access?
-
Unauthorised access to tower crane prevented? (Board up access ladder)
-
Site containers securely locked?
-
"No Unauthorised" access signage posted at entrance gates and perimeter fence?
-
Scaffolding made safe by removing access ladders and "No Unauthorised" access sign posted
-
All exposed electrical cables tagged and made safe?
- Yes
- No
- N/A
-
Ensure aviation lights on tower crane operational. (SA-CAR 139.01.33)
- Yes
- No
- N/A
-
Tower crane hook free from chains and slings?
- Yes
- No
- N/A
Stacking and Storage
-
All material stacked / stored away from site perimeter fence?
-
Ladders removed and stored away to prevent unauthorised usage?
-
All material / tools safely stored away in containers / secure lock-ups?
-
Hazardous chemicals / flammable material securely locked away in well ventilated bunded COSHH locker?
-
Housekeeping on site in good order? (All trip hazards removed, combustable material removed from site)
Administrative
-
All offices securely locked and checked?
-
Emergency standby list confirmed and distributed to relevant persons and CCPOA?
Excavations / Penetrations and Barricading
Powered Industrial Vehicles / Plant
Other Non-Site Related Issues:
-
undefined
-
Add media
Site Shut-Down Report Distribution List
-
Client Representative / Agent
-
Project Managers
-
Client HSE
-
General Contractor
Closing date and Starting date
-
undefined
-
Closing Date
-
Opening Date
Report Author
-
Report Author:
-
Report Reviewed by:
-
Report Completion Date