Information

  • Document No.

  • DAILY SITE SHUTDOWN CHECKLIST

  • SITE: CHATSWORTH ISLAND, LAWRENCE AND ILUKA PS

  • Conducted on

  • Prepared by SITE SUPERVISOR

  • Location - NOMINATED SCHOOL SITE

Site Shut-Down Checklist and Report

  • No employees may stay on site over shutdown period without permission from the Client. Permission obtained?

  • Decking boards / sheeting securely fixed and stored to prevent movement during high winds?

Emergency Contact Details

Safety and Security

  • Standby persons nominated by General Contractor and Sub-Contractors to respond to emergency situations?

  • Arrangements made for after hours security?

  • Emergency numbers clearly displayed on site information boards and at security hut?

  • All perimeter fences, gates and barricades secured and in good condition to prevent unauthorised access?

  • Unauthorised access to tower crane prevented? (Board up access ladder)

  • Site containers securely locked?

  • "No Unauthorised" access signage posted at entrance gates and perimeter fence?

  • Scaffolding made safe by removing access ladders and "No Unauthorised" access sign posted

  • All exposed electrical cables tagged and made safe?

  • Ensure aviation lights on tower crane operational. (SA-CAR 139.01.33)

  • Tower crane hook free from chains and slings?

Stacking and Storage

  • All material stacked / stored away from site perimeter fence?

  • Ladders removed and stored away to prevent unauthorised usage?

  • All material / tools safely stored away in containers / secure lock-ups?

  • Hazardous chemicals / flammable material securely locked away in well ventilated bunded COSHH locker?

  • Housekeeping on site in good order? (All trip hazards removed, combustable material removed from site)

Administrative

  • All offices securely locked and checked?

  • Emergency standby list confirmed and distributed to relevant persons and CCPOA?

Excavations / Penetrations and Barricading

Powered Industrial Vehicles / Plant

Other Non-Site Related Issues:

  • Add media

Site Shut-Down Report Distribution List

  • Client Representative / Agent

  • Project Managers

  • Client HSE

  • General Contractor

Closing date and Starting date

  • Closing Date

  • Opening Date

Report Author

  • Report Author:

  • Report Reviewed by:

  • Report Completion Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.