Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Site Shut-Down Checklist and Report
Emergency Contact Details
-
undefined
Safety and Security
-
No employees may be on site over shutdown period without permission from the Client. <br>Permission obtained?
-
Standby persons nominated by General Contractor and Sub-Contractors to respond to emergency situations?
-
Arrangements made for after hours security?
-
Security lighting / Alarms in place, checked and working?
-
Emergency numbers clearly displayed on site information boards and at security hut?
-
All access points, gates and barricades secured and in good condition to prevent unauthorised access?
-
"No Unauthorised" access signage posted at entrance gates
-
Scaffolding made safe by removing access ladders and "No Unauthorised" access sign posted
-
Material hoist at ground level and isolated to prevent any unauthorised usage?
Stacking and Storage
-
Decking boards / sheeting securely fixed and stored to prevent movement during high winds?
-
All material stacked / stored away from site perimeter fence?
-
Ladders removed and stored away to prevent unauthorised usage?
-
All material / tools safely stored away in containers / secure lock-ups?
-
Housekeeping on site in good order? (All trip hazards removed, combustable material removed from site)
-
Edge protection in place on leading edges and drop-off points, otherwise areas securely barricaded and sign posted?
Other Non-Site Related Issues:
-
undefined
-
Add media
Site Shut-Down Report Distribution List
-
Client
-
Client Representative / Agent
-
Project Managers
-
Client HSE
-
Local Authority
-
General Contractor
-
Site Security Control Room
-
Emergency standby personnel
Closing date and Starting date
-
undefined
-
Closing Date
-
Opening Date
Report Author
-
Report Author:
-
Report Reviewed by:
-
Report Completion Date