Information

  • Monthly Fire Sprinkler & Standpipe Inspection Report

  • Document No.

  • Building Name

  • Address

  • Conducted on

  • Inspection Template Prepared by:

  • Personnel

General Information

  • Call Point around school:

  • Date of Inspection:

  • All responses refer to the current inspection performed on this date.

Monthly Inspection

  • Valves

  • 1) Control valves are in their normal open position?

  • 2) Alarm valves and test valves are in their normal closed position?

  • 3) Control valves are locked in the open position or are electronically supervised?

  • 4) Valves are free of leaks or damage?

  • 5) Valves are marked with appropriate identification sign?

  • 6) Fire department connection is accessible, properly marked, with caps in place.

  • Gauges

  • 1) Gauges show normal water pressures?at

  • 2) Gauges are free of leaks or damage?

  • Record notes here.

  • Add photos here if necessary.

  • Signed by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.