Title Page
-
Sub-contractor Name:
-
Conducted on
-
Prepared by
-
Add PASMA Certificate:
-
Location
Podium Reference Numbers
-
Delta Deck S/N:
-
Delta Deck S/N:
-
Delta Deck S/N:
-
Delta Deck S/N:
-
Delta Deck S/N:
-
Do you need to add more podiums?
-
Delta Deck S/N:
-
Delta Deck S/N:
-
Delta Deck S/N:
-
Delta Deck S/N:
-
Delta Deck S/N:
-
A PHOTO MUST BE TAKEN FOR EACH OF THE BELOW QUESTIONS AS PROOF OF INSPECTION
-
Are castors firmly fixed and locking mechanisms functioning correctly? If not, adjust to suit.
-
Are step hook mechanisms locking correctly?
-
Platform and steps checked for damage? Is it free of any material likely to cause slipping i.e. Oil/ paints?
-
Are pivot bolts secure and do they allow free movement?
-
Are self closing gates working correctly?
-
Were the centre locking mechanisms tested and are they functioning correctly?
-
Was the gate tested for movement and locking on vertical above pin?
-
Check all welds for cracks and tube damage
-
Check all instruction labels are fixed and legible
-
Is platform level?
-
Has scaff tag been signed of with last 7 days by a PASMA trained person?
-
Confirm Delta Deck has not been modified
-
Comments:
-
Add signature