Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Authority for administration of "Quality Management System"

  • Full authority has been delegated to defined position

  • The Designated Authorised Person retains an up to date copy of "Boiler Quality Manual"

  • At all times the requirements of the Boiler Operating and Maintenance system takes precedence over any other non-safety priorities.

  • Person in control of boiler management is adequately trained and understands the "Code of Practice for the Safe Operation, Maintenance and Servicing of all Boilers having a Power Output of Less than 20MW"

Responsibility and training - It is essential that at all times, Management are satisfied the boiler installation is under the supervision of a trained operator

  • The General Manager is satisfied that all operators have the appropriate experience and training

  • The Plant Manager is satisfied the boiler installation is under the supervision of a trained operator

  • There is a roster in place of "Responsible Person" to take corrective action and reset the boiler if required

  • Staff are aware of the "Responsible Person" roster and procedures to follow if this person is not immediately availabe

  • Training records are maintained designating - Employee name, Trainer name, Subject, Date of training and the venue

  • Training records are signed by the Training Officer

  • An up to date version of "Boiler Quality Manual" is available to operators at all times

Routine records

  • "Daily Log Sheet" records are maintained

  • The Engineering Manager conducts regular checks to ensure this being maintained

  • Weekly checks are recorded in the "Weekly Log Sheet"

  • Monthly checks are recorded in the bottom portion of the "Daily Log Sheet"

  • "Quarterly Maintenance Schedule is completed by the service organisation

  • "Annual Inspection" reports from Inspection Agency are submitted for corrective action and filing

  • Annual "Boiler Quality Management System" audit reports are submitted for corrective action and filing

  • All "Non-Routine" records are filed for a period of 5 years

Quality Records

  • A binder is in use to store relevant Quality Records (refer section 1.4.6 for a full list)

  • A "Vessel Dossier" is maintained with copies of Hydro-Static tests

  • A "Water Treatment Manual" is available

  • A "Log Book" is maintained detailing (Daily, Weekly, Monthly) checks

  • A Maintenance Manual is available to Service Personnel

Non Conformance Reports

  • "Non Conformance Reports" are raised any time the plant falls outside of routine operating conditions - e.g. A lock out, or unsatisfactory internal inspection, or unsatisfactory boiler water analysis results, etc.

  • "Non-Conformance Reports" details follows the set format as set out in the "Boiler Quality Manual" (section 2.7.1)

  • "Non-Conformance Reports" are raised by those indicated in "Boiler Quality Manual" (section 2.7)

Repairs and Modifications

  • Repairs affecting the safety of the plant are carried out by the "manufacturer, their designated agent or by an organisation approved by the Inspecting Authority"

  • Details of the repair, and subsequent inspection records are appended to the vessel dossier.

  • Details of repair or modification are registered in the "Modification and Repair Register"

  • Any modifications have been approved by the Inspection Authority and the Manufacturer or their designated agent

Document Control

  • Documents are Approved, Reviewed, controlled and Issued by Authorised Personnel

  • The "Boiler Quality Manual" is revised by the Authorised Person or his Nominees

  • All revisions are approved by the Plant Manager

  • A "Document Register" is maintained and current

  • Quality documents are issued on a controlled basis via "Document Distribution Registers"

  • Only current versions of documents are available for use

Purchases

  • All purchase orders contain a full description of the goods and services ordered

  • All received goods and services are verified to comply with order conditions prior to release for use

  • Purchased goods are stored in an appropriate area

  • Any "Sub Standard" services are recorded on a "Non Conformance Record"

Calibrations

  • The "Main Boiler Pressure Gauge" is periodically calibrated in compliance with the appropriate Code of Practice

  • Calibration of the Main Boiler Pressure Guage is conducted by an IANZ registered laboratory

  • Other devices or instruments are calibrated as required or if damage is apparent

  • A Calibration Record is maintained for each device or instrument

  • Each device or instrument is marked with a label indicating calibration expiry date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.