1) FALLS
-
#AtRisk
-
2) SCAFFOLDS
-
#AtRisk
3) PPE
-
#AtRisk
-
15) Confined Spaces
-
#AtRisk
-
AtRisk
-
AtRisk
-
AtRisk
-
AtRisk
-
Body Harness/Fall Protection
-
Inspected & Tagged by Compentant
-
Hard Hats
-
Confined space entry training program on site
-
100% Tie Off Above 6'0"
-
Height < 3 x minimum base
-
Foot Protection
-
Signs posted to identify confined spaces
-
Lanyard / Retractable Anchored Properly
-
Scaffold Tied Off Securely
-
Eye Protection
-
PPE Specified
-
Handrail on Stairways
-
Decking, Rails & Access
-
Hearing Protection
-
Standby person identified
-
Carrying Things on Stairways
-
Solid Base
-
Nomex
-
Emergency equipment for standby person
-
All holes / openings properly covered, marked, secured
-
Not Over or Eccentrically Loaded
-
Hand Protection
-
Permit required precaution taken
-
Handrails: properly built top rail (42"), mid rail (21"), toe boards
-
Respiratory Protection (used when needed, stored properly)
-
Air monitoring equipment calibrated, area monitored, ventilated
-
Employees have been trained in fall protection
-
Permits posted prior to work and for duration
-
Harness/Lanyard current inspected Monthly
-
All required signatures for entry/testing
TOTAL:
TOTAL:
TOTAL:
-
TOTAL:
4) LADDERS
#AtRisk
5) Recordkeeping, Notices, Posters
#AtRisk
6) HOUSEKEEPING
-
#AtRisk
-
12) WORK ENVIRONMENT
-
#AtRisk
-
Proper Ladder
-
Emergency phones numbers posted
-
Clean Area / Proper Disposal
-
Sufficient Lighting
-
Proper Length
-
BG safety manual and substance abuse manual
-
Proper Storage / Labeling
-
Adequate Ventilation
-
Proper Angle
-
OSHA 29 CFR 1926 manual
-
Impalement Hazards Capped
-
Temperature Extremes Addressed
-
Tied Off
-
Emergency procedures and evacauation plans
-
Cords & Hoses Stored Properly
-
Awareness of Area Hazards
-
Secure Base / Footing
-
Requires posters displayed. "Job Safety and Helth Protection"
-
Cords Elevated 7' Crossing Aisles
-
Awareness of Area Alarms
-
HazCom Poster
-
Bend over nails
-
Slip/Trip Hazards
-
OSHA 300 log on site for previous year
-
Do the Subs have drinking water
-
BG Hazard Communication manual
-
Toilets / Sanitary facilities adequate and clean
-
MSDS available on josite for all trades
-
Dust Control
-
Designated HazCom representatives posted on site
-
Slips, Trips, and Falls
TOTAL:
TOTAL:
TOTAL:
-
TOTAL:
7) FIRE PREVENTION
#AtRisk
8) CRANE SAFETY
#AtRisk
9) TOOLS & EQUIPMENT
-
#AtRisk
-
16) Welding and Cutting
-
#AtRisk
-
Hot Work Permit
-
Swing Radius Barricade
-
Right Tool / Equipment for the Job
-
Welding hoses, leads and cords elevated or out of walkways
-
Proper Fire Extinguisher
-
Overhead Loads
-
Proper Use of Tool / Equipment
-
Welding shields and spark / slag catching blankets in place Flash arrestors present in proper location
-
Fully Charged & Inspected
-
Tag Line Attached to All Loads
-
Guards in Place
-
Fire watches trained, in place with proper fire extinguishers
-
Combustible Storage
-
Crane & Operator Certified
-
User Properly Trained
-
Fire hazards / combustibles removed before hot work begins
-
Flammable Storage
-
Horn Sounding
-
Tools in Good Condition
-
Gas cylinders secured upright
-
Extinguisher Access / Hydrants
-
Signal person in site
-
Correct / Current Inspection Tag
-
Fuel gas and oxygen cylinders separated in storage
-
Fire lane access
-
Daily inspection Completed
-
Seat Belts Worn by Occupants
-
Gauges and regulators maintained, removed when not in use
-
Hydrants Clear 15'0" radius
-
Outriggers have proper footing
-
Speed Limit Honored
-
Cylinder caps in place when regulators are off
-
Backup Alarm/Horn when Backing
-
Fire hazards checked / afterhours inspection, if necessary
-
Spotter when Necessary
-
Dikes bulk storage facilities
-
Parking Brake / Wheel Chocks
-
Fire extinguishers nearby but NOT on flammable storage units
TOTAL:
TOTAL:
TOTAL:
-
TOTAL:
10) BODY MECHANICS
#AtRisk
11) Excavations and Shoring
#AtRisk
17) RIGGING SAFETY
-
#AtRisk
-
DATE:
-
50 lb. Lift Limit Not Exceeded
-
Designated competent person on site
-
Personnel qualified?
-
Keeping Back Straight
-
Excavation permits in place
-
Procedures known/followed?
-
# OBSERVATIONS TOTAL:
-
Lifting with Legs
-
Correct shoring / sloping for soil type
-
Pre planning required/done?
-
# SAFE OBSERVATIONS
-
Not Twisting While Lifting
-
Spoils pile placed 2' minimum from sides of excavation
-
Is this a Critical lift?
-
# AT RISK OBSERVATIONS
-
Not Over Stepping
-
Adjacent structures properly shored
-
Load weight known/verified?
-
Not Lifting Off Balance
-
Ladders or ramps every 25 feet
-
Center of gravity identified?
-
Required daily inspections
-
Softners used as needed?
-
Confined space requirements
-
Equip. condition, inspected?
-
Proper Barricades in place
-
Signal person present?
TOTAL:
TOTAL:
-
Proper rigging, sling angle?
13) LINE OF FIRE
#AtRisk
14) ELECTRICAL SAFETY
#AtRisk
-
Stable soil, footing, etc.?
-
Grinding / Flying Projectiles
-
Ground Fault Circuit Interrupter
-
Proper clearance from elect.?
-
Process Materials / Burns
-
Insulation Intact
-
Swinging Loads
-
Electrical LT3
-
Traffic
-
(Bee Keeper Suit, etc.) Nomex
TOTAL:
TOTAL:
TOTAL:
-
Rev 110210
Observations
-
Project Name:
-
Job #:
-
Date:
-
SO Location:
-
SO Team:
-
OBSERVATION
-
AtRisk
-
AUDITOR
CORRECTIVE ACTION
-
RESPONSIBLE SUPERVISOR
-
ACTION REQUIRED
-
DATE CORRECTED
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
Suggested:
-
Taken:
-
ATRISK #
TOTALS :
Email Copy of SO to:
TOTAL OBSERVATIONS :
Operations and Safety Offices within 24 hours of SO
Closed SO items report to Safety Office (within 48 hrs)
-
Inspected By:
SO Bullet Points
-
Safety Observations (SO) Bullet Point Checklist. Use this sheet to understand what you need to be
-
looking for when performing an SO walk
FALLS
-
RECORDKEEPING/NOTICES
-
Body Harness/Fall Protection
-
Emergency phones numbers posted
-
100% Tie Off Above 6'0"
-
safety manual and substance abuse manual
-
Lanyard / Retractable Anchored Properly
-
OSHA 29 CFR 1926 manual
-
Handrail on Stairways
-
Emergency procedures and evacuation plans
-
Carrying Things on Stairways
-
Requires posters displayed. "Job Safety and Health Protection"
-
All holes / openings properly covered, marked, secured
-
HazCom Poster
-
Handrails: properly built top rail (42"), mid rail (21"), toe boards
-
OSHA 300 log on site for previous year
-
Employees have been trained in fall protection
-
Hazard Communication manual
-
Harness / Lanyard current inspected Monthly
-
MSDS/SDS available on jobsite for all trades
-
Retractable in use when access >12'
-
Designated HazCom representatives posted on site
LADDERS
-
SCAFFOLDS
-
Proper Ladder
-
Inspected & Tagged by Competent Person
-
Proper Length
-
Height < 3 x minimum base
-
Proper Angle
-
Scaffold Tied Off Securely
-
Tied Off
-
Fully decked at working levels
-
Secure Base / Footing
-
Solid Base/Mudsills as needed
-
Maintain 3 points of contact
-
Not Over or Eccentrically Loaded
-
Current Monthly InspectionColor Coded
-
Rails and or fall protection provided / addressed
FIRE PREVENTION
-
CRANE SAFETY
-
Hot Work Permit
-
Swing Radius Barricade
-
Proper Fire Extinguisher
-
Overhead Loads
-
Fully Charged & Inspected
-
Tag Line Attached to All Loads
-
Flammable/Combustible Storage
-
Crane & Operator Certified
-
Flammable Storage
-
Signal person on site
-
Extinguisher Access / Hydrants
-
Daily inspection Completed
-
Fire lane access
-
Outriggers have proper footing
-
Hydrants Clear 15'0" radius
LINE OF FIRE
-
ELECTRICAL SAFETY
-
Grinding / Flying Projectiles
-
Ground Fault Circuit Interrupter
-
Process Materials / Burns
-
Insulation Intact
-
Swinging Loads
-
Electrical LOTO
-
Traffic
-
Electrical Cord kept away from water
HOUSEKEEPING
-
PPE
-
Clean Area/Proper Disposal
-
Hard hats
-
Proper Storage/Labeling
-
Foot Protection
-
Impalement Hazards Capped
-
Eye Protection/Face shields/Welding Hoods
-
Cords / Hoses stored properly
-
Hearing Protection
-
Cords Elevated 7' crossing aisles
-
High Visibility ANSI Class II Vest / Shirt
-
Slip / Trip Hazards
-
Hand Protection
-
Respiratory protection (used when needed, stored properly
BODY MECHANICS
-
EXCAVATIONS/SHORING
-
50 lb. Lift Limit Not Exceeded
-
Designated competent person on site
-
Keeping Back Straight
-
Excavation permits in place
-
Lifting with Legs
-
Correct shoring / sloping for soil type
-
Not Twisting While Lifting
-
Spoils pile placed 2' minimum from sides of excavation
-
Not Over Stepping
-
Adjacent structures properly shored
-
Not Lifting Off Balance
-
Ladders or ramps every 25 feet
-
Proper lifting technique
-
Required daily inspections
-
Confined space requirements
-
Proper Barricades in place
TOOLS & EQUIPMENT
-
WELDING AND CUTTING
-
Right Tool / Equipment for the Job
-
Welding hoses, leads and cords elevated or out of walkways
-
Proper Use of Tool / Equipment
-
Welding shields and spark / slag catching blankets in place Flash arrestors present in proper location
-
Guards in Place
-
Fire watches trained, in place with proper fire extinguishers
-
User Properly Trained
-
Fire hazards / combustibles removed before hot work begins
-
Tools in Good Condition
-
Gas cylinders secured upright
-
Correct / Current Inspection Tag
-
Fuel gas and oxygen cylinders separated in storage or have a non combustible barrier at least 5' high with a fire resistant rating of 30 minutes
-
Seat Belts Worn by Occupants
-
Gauges and regulators maintained, removed when not in use
-
Speed Limit Honored
-
Cylinder caps in place when regulators are off
-
Backup Alarm / Horn when Backing
-
Fire hazards checked / afterhours inspection, if necessary
-
Spotter when Necessary
-
Dikes bulk storage facilities
-
Parking Brake / Wheel Chocks
-
Fire extinguishers nearby but NOT on flammable storage units
PROCEDURES
-
WORK ENVIRONMENT
-
Permit Completed & followed
-
Sufficient lighting
-
Thorough STA done
-
Adequate ventilation
-
Barricades, Proper Signage
-
Temperature extremes addressed
-
Trained for CSE/line break, etc
-
Awareness of area hazards
-
Special Permits acquired
RIGGING SAFETY
-
HAND SAFETY
-
Personnel qualified?
-
Gloves Used when Required
-
Procedures known / followed?
-
Proper Glove Type in use
-
Pre planning required / done?
-
Hands Free of Danger Zone
-
Is this a Critical lift?
-
Gloves in good condition
-
Load weight known / verified?
-
Putting hand/arm in blind spot
-
Center of gravity identified?
-
Avoids hot / cold, sharp or corrosive materials / objects
-
Softeners used as needed?
-
Avoids repetitive motion and awkward positioning
-
Equip. condition, inspected?
-
Recognized hand hazards properly addressed with guards or physical barriers
-
Signal person present?
-
Proper rigging, sling angle?
-
Avoids use of excessive force
-
Stable soil, footing, etc.?
-
Hand STA completed
-
Proper clearance from elect.?