Title Page

  • Site conducted

  • Date

  • Prepared by

  • Location
  • Weather Conditions

Survey

PROJECT PLAN

  • Drawing

Flat Roof

DETAILS ROOF 1

EXISTING FLAT ROOFING SYSTEM

  • Has a core sample been taken?

  • Build up?

  • Roof 1 Field Area m2

  • Detail Dimemsions

  • Detail Dimensions

  • Detail dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E

  • Cable Trays

  • Copping Stones

  • Man Anchor Points

  • Lightning Conductor

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

DETAILS ROOF 2

EXISTING FLAT ROOFING SYSTEM

  • Has a core sample been taken?

  • Build up?

  • Roof 2 Field Area m2

  • Detail Dimemsions

  • Detail Dimensions

  • Detail dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E

  • Cable Trays

  • Copping Stones

  • Man Anchor Points

  • Lightning Conductor

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

DETAILS ROOF 3

EXISTING FLAT ROOFING SYSTEM

  • Has a core sample been taken?

  • Build up?

  • Roof 3 Field Area m2

  • Detail Dimemsions

  • Detail Dimensions

  • Detail dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E

  • Cable Trays

  • Copping Stones

  • Man Anchor Points

  • Lightning Conductor

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

DETAILS ROOF 4

EXISTING FLAT ROOFING SYSTEM

  • Has a core sample been taken?

  • Build up?

  • Roof 4 Field Area m2

  • Detail Dimemsions

  • Detail Dimensions

  • Detail dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E

  • Cable Trays

  • Copping Stones

  • Man Anchor Points

  • Lightning Conductor

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

DETAILS ROOF 5

EXISTING FLAT ROOFING SYSTEM

  • Has a core sample been taken?

  • Build up?

  • Roof 5 Field Area m2

  • Detail Dimemsions

  • Detail Dimensions

  • Detail dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E

  • Cable Trays

  • Copping Stones

  • Man Anchor Points

  • Lightning Conductor

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

DETAILS ROOF 6

EXISTING FLAT ROOFING SYSTEM

  • Has a core sample been taken?

  • Build up?

  • Roof 6 Field Area m2

  • Detail Dimemsions

  • Detail Dimensions

  • Detail dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E

  • Cable Trays

  • Copping Stones

  • Man Anchor Points

  • Lightning Conductor

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

DETAILS ROOF 7

EXISTING FLAT ROOFING SYSTEM

  • Has a core sample been taken?

  • Build up?

  • Roof 7 Field Area m2

  • Detail Dimemsions

  • Detail Dimensions

  • Detail dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E

  • Cable Trays

  • Copping Stones

  • Man Anchor Points

  • Lightning Conductor

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

DETAILS ROOF 8

EXISTING FLAT ROOFING SYSTEM

  • Has a core sample been taken?

  • Build up?

  • Roof 8 Field Area m2

  • Detail Dimemsions

  • Detail Dimensions

  • Detail dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E

  • Cable Trays

  • Copping Stones

  • Man Anchor Points

  • Lightning Conductor

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

DETAILS ROOF 9

EXISTING FLAT ROOFING SYSTEM

  • Has a core sample been taken?

  • Build up?

  • Roof 9 Field Area m2

  • Detail Dimemsions

  • Detail Dimensions

  • Detail dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E

  • Cable Trays

  • Copping Stones

  • Man Anchor Points

  • Lightning Conductor

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

DETAILS ROOF 10

EXISTING FLAT ROOFING SYSTEM

  • Has a core sample been taken?

  • Build up?

  • Roof 10 Field Area m2

  • Detail Dimemsions

  • Detail Dimensions

  • Detail dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Detail Dimensions

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E

  • Cable Trays

  • Copping Stones

  • Man Anchor Points

  • Lightning Conductor

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Metal Profile Roof

  • Roof Plan

METAL ROOF 1

  • Roof Area M2

  • Number of fixing per m2

  • Suggested Allowance % wise for profile

  • PITCH Degree

  • Mid Lap LM

  • End Lap LM

  • Ridge Capping LM

  • Joints on Ridge Capping

  • Verge/Gable end

  • Joints on Verge/Gable end

  • Parapet Cladding

  • Parapet Capping

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E / Ducting

  • Cable Trays

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

METAL ROOF 2

  • Roof Area M2

  • Number of fixing per m2

  • Suggested Allowance % wise for profile

  • PITCH Degree

  • Mid Lap LM

  • End Lap LM

  • Ridge Capping LM

  • Joints on Ridge Capping

  • Verge/Gable end

  • Joints on Verge/Gable end

  • Parapet Cladding

  • Parapet Capping

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E / Ducting

  • Cable Trays

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

METAL ROOF 3

  • Roof Area M2

  • Number of fixing per m2

  • Suggested Allowance % wise for profile

  • PITCH Degree

  • Mid Lap LM

  • End Lap LM

  • Ridge Capping LM

  • Joints on Ridge Capping

  • Verge/Gable end

  • Joints on Verge/Gable end

  • Parapet Cladding

  • Parapet Capping

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E / Ducting

  • Cable Trays

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

METAL ROOF 4

  • Roof Area M2

  • Number of fixing per m2

  • Suggested Allowance % wise for profile

  • PITCH Degree

  • Mid Lap LM

  • End Lap LM

  • Ridge Capping LM

  • Joints on Ridge Capping

  • Verge/Gable end

  • Joints on Verge/Gable end

  • Parapet Cladding

  • Parapet Capping

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E / Ducting

  • Cable Trays

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

METAL ROOF 5

  • Roof Area M2

  • Number of fixing per m2

  • Suggested Allowance % wise for profile

  • PITCH Degree

  • Mid Lap LM

  • End Lap LM

  • Ridge Capping LM

  • Joints on Ridge Capping

  • Verge/Gable end

  • Joints on Verge/Gable end

  • Parapet Cladding

  • Parapet Capping

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E / Ducting

  • Cable Trays

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

METAL ROOF 6

  • Roof Area M2

  • Number of fixing per m2

  • Suggested Allowance % wise for profile

  • PITCH Degree

  • Mid Lap LM

  • End Lap LM

  • Ridge Capping LM

  • Joints on Ridge Capping

  • Verge/Gable end

  • Joints on Verge/Gable end

  • Parapet Cladding

  • Parapet Capping

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E / Ducting

  • Cable Trays

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

METAL ROOF 7

  • Roof Area M2

  • Number of fixing per m2

  • Suggested Allowance % wise for profile

  • PITCH Degree

  • Mid Lap LM

  • End Lap LM

  • Ridge Capping LM

  • Joints on Ridge Capping

  • Verge/Gable end

  • Joints on Verge/Gable end

  • Parapet Cladding

  • Parapet Capping

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E / Ducting

  • Cable Trays

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

METAL ROOF 8

  • Roof Area M2

  • Number of fixing per m2

  • Suggested Allowance % wise for profile

  • PITCH Degree

  • Mid Lap LM

  • End Lap LM

  • Ridge Capping LM

  • Joints on Ridge Capping

  • Verge/Gable end

  • Joints on Verge/Gable end

  • Parapet Cladding

  • Parapet Capping

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E / Ducting

  • Cable Trays

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

METAL ROOF 9

  • Roof Area M2

  • Number of fixing per m2

  • Suggested Allowance % wise for profile

  • PITCH Degree

  • Mid Lap LM

  • End Lap LM

  • Ridge Capping LM

  • Joints on Ridge Capping

  • Verge/Gable end

  • Joints on Verge/Gable end

  • Parapet Cladding

  • Parapet Capping

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E / Ducting

  • Cable Trays

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

METAL ROOF 10

  • Roof Area M2

  • Number of fixing per m2

  • Suggested Allowance % wise for profile

  • PITCH Degree

  • Mid Lap LM

  • End Lap LM

  • Ridge Capping LM

  • Joints on Ridge Capping

  • Verge/Gable end

  • Joints on Verge/Gable end

  • Parapet Cladding

  • Parapet Capping

  • Gutter Details 1 - Number of Outlets - Type

  • Gutter Details 2 - Number of Outlets

  • Gutter Details 3 - Number of Outlets

  • Gutter Details 4 - Number of Outlets

  • Gutter Details 5 - Number of Outlets

  • Gutter Details 6 - Number of Outlets

  • Outlet survey required?

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • SVP Dimensions - Number of SVP's

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Vent Dimensions - Number of Vents

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • Roof Lights Dimensions - Number of Roof lights

  • M&E / Ducting

  • Cable Trays

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Pitched Roofs

ROOF PLAN

  • Add media

Pitched Roof 1

  • Drawing

  • Field Area

  • Ridge Tiles

  • Degree of Roof

  • Hip Tiles

  • Valley

  • Gutters

  • Rain Water Pipes

  • Tile size Manufacturer and profile

  • Insulation?

  • How are the tiles fixed?

Roof Height

  • Height to the ridge from Ground level

  • Height to Eaves from the Ground

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Pitched Roof 2

  • Drawing

  • Field Area

  • Ridge Tiles

  • Degree of Roof

  • Hip Tiles

  • Valley

  • Gutters

  • Rain Water Pipes

  • Tile size Manufacturer and profile

  • Insulation?

  • How are the tiles fixed?

Roof Height

  • Height to the ridge from Ground level

  • Height to Eaves from the Ground

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Pitched Roof 3

  • Drawing

  • Field Area

  • Ridge Tiles

  • Degree of Roof

  • Hip Tiles

  • Valley

  • Gutters

  • Rain Water Pipes

  • Tile size Manufacturer and profile

  • Insulation?

  • How are the tiles fixed?

Roof Height

  • Height to the ridge from Ground level

  • Height to Eaves from the Ground

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Pitched Roof 4

  • Drawing

  • Field Area

  • Ridge Tiles

  • Degree of Roof

  • Hip Tiles

  • Valley

  • Gutters

  • Rain Water Pipes

  • Tile size Manufacturer and profile

  • Insulation?

  • How are the tiles fixed?

Roof Height

  • Height to the ridge from Ground level

  • Height to Eaves from the Ground

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Pitched Roof 5

  • Drawing

  • Field Area

  • Ridge Tiles

  • Degree of Roof

  • Hip Tiles

  • Valley

  • Gutters

  • Rain Water Pipes

  • Tile size Manufacturer and profile

  • Insulation?

  • How are the tiles fixed?

Roof Height

  • Height to the ridge from Ground level

  • Height to Eaves from the Ground

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Pitched Roof 6

  • Drawing

  • Field Area

  • Ridge Tiles

  • Degree of Roof

  • Hip Tiles

  • Valley

  • Gutters

  • Rain Water Pipes

  • Tile size Manufacturer and profile

  • Insulation?

  • How are the tiles fixed?

Roof Height

  • Height to the ridge from Ground level

  • Height to Eaves from the Ground

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Pitched Roof 7

  • Drawing

  • Field Area

  • Ridge Tiles

  • Degree of Roof

  • Hip Tiles

  • Valley

  • Gutters

  • Rain Water Pipes

  • Tile size Manufacturer and profile

  • Insulation?

  • How are the tiles fixed?

Roof Height

  • Height to the ridge from Ground level

  • Height to Eaves from the Ground

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Pitched Roof 8

  • Drawing

  • Field Area

  • Ridge Tiles

  • Degree of Roof

  • Hip Tiles

  • Valley

  • Gutters

  • Rain Water Pipes

  • Tile size Manufacturer and profile

  • Insulation?

  • How are the tiles fixed?

Roof Height

  • Height to the ridge from Ground level

  • Height to Eaves from the Ground

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Pitched Roof 9

  • Drawing

  • Field Area

  • Ridge Tiles

  • Degree of Roof

  • Hip Tiles

  • Valley

  • Gutters

  • Rain Water Pipes

  • Tile size Manufacturer and profile

  • Insulation?

  • How are the tiles fixed?

Roof Height

  • Height to the ridge from Ground level

  • Height to Eaves from the Ground

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Pitched Roof 10

  • Drawing

  • Field Area

  • Ridge Tiles

  • Degree of Roof

  • Hip Tiles

  • Valley

  • Gutters

  • Rain Water Pipes

  • Tile size Manufacturer and profile

  • Insulation?

  • How are the tiles fixed?

Roof Height

  • Height to the ridge from Ground level

  • Height to Eaves from the Ground

  • Builders Work attended/enquiry sent to?

  • Asbestos - Contractor attending / Enquiry sent to?

Specialist Glazing

Specialist Glazing

  • Requirement to provide specialist glazing for Celestrial windows, atriums etc...

Asbestos

Asbestos

  • Is there an asbestos record?

  • Does asbestos require removing and deposing of?

  • Name of approved contractor?

Welfare Storage and Access

  • Do we require Welfare and Storage?

  • Is there access to water?

  • Is there access to electricity?

SCAFFOLD

Scaffold

  • Type of scaffold required?

  • Scaffold Drop

  • Scaffolder Attended Site? Name of contractor

  • Scaffold Plan

  • External photographs

  • Enquiry Sent to?

Additional Sub Contractor Enquiries

  • Flat Roof

  • Metal Roof

  • Pitched Roof

  • Siphonic outlets

  • Drain Survey

Internal Photos/Damage

  • Internal photos/damage

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.