Project Information

  • Form type:

  • Attendance Date:

  • Client:

Store Details

  • Store Name:

  • Store Number:

  • Location:

Project Number(s)

  • Client Project Number:

  • Key Project Number:

Operatives

  • Primary Roofing Operative (Full Name):

  • Secondary Roofing Operative (Full Name):

Health & Safety Checklist

Health & Safety Checklist

  • Is a permit or third party authorisation required to access to the roof?

  • Is a permit or written authorisation in place?

  • Do not access the roof

  • Provide contact details for permit / authorisation to be obtained (Name, Email Address, Contact Number, Documents Required)

  • Is the asbestos register available?

  • Review asbestos register

  • Has the RAAC registers been checked?

  • Can the roof be accessed safely?

  • If the roof cannot be accessed what further measures are required?

  • Is temporary fall protection required and available?

  • What fall protection is in place?

  • Is the safety line inspection tag in place and in date?

  • Do not use the safety line

  • Is temporary fall protection required and available?

  • Is a harness and lanyard required and are they available?

  • Is a MEWP required to carry out the work?

  • Are MEWP operators IPAF trained?

  • Are there any fragile surfaces?

  • What precautions to prevent falls are in place?

  • Do the weather conditions fall within limits stated in RAMS?

  • Have all operatives been briefed on the RAMS?

  • Can materials be taken to the roof safely?

  • Is all waste removed from the roof?

Survey

  • Form Type:

  • Photograph of the front of the store

  • Has drone footage been captured of the roof

  • Please advise why footage could not be captured

General

Building Details

  • Estimated build date (Leave blank if unknown)

  • Is the property over 20 years old

  • Roof ownership

  • Is a roof register present

  • Is the roof register being actively used

  • Type of access used to access the roof

  • Ensure segregation is utilised to protect the public and / or store colleagues

  • Are roof lights or fragile surfaces present

  • Can operatives undertake the works at hand whilst maintaining a safe working distance from the fragile surfaces?

  • Ensure safe working distance from any fragile surfaces at all times

  • Do not access the roof

  • Client store representative who has confirmed authorisation to access the roof

  • Are there any defined walkways

Roof Construction

  • Roof construction materials

  • Other roof materials

  • Gutter type

  • Are outlet covers present

  • Are there any overflow outlets present on the roof

Works undertaken

  • Photographs of roof and gutters conditions prior to clean

  • Photographs of roof and gutters conditions after to clean

  • Full description of works carried out

  • Are all gutters (valley & trough) clear

  • Have all leaf guards / hoppers been cleaned and cleared of debris?

Roof Condition

  • Is there any cut edge corrosion present to any roof sheets?

  • Is there any damage to any capping details?

  • Is there any damage to any flashing details?

  • Notes on existing coursework pointing

  • Are there any related issues that are deemed essential and may compromise store trading?

  • Description of issues deemed essential and / or may compromise store trading

  • Please complete a separate survey template capturing as much detail as possible

  • Are there any roof leaks reported by the store

  • Where are the reported leaks within the store

  • Provide annotated google screenshot showing the leak locations

  • Is there any debris discarded on the roof

  • Are there any apparent pest issues (For example bird activity)

  • Are there any poor installs with regards to plant and the interface with the roof

  • Is there evidence of recent works to the roof

  • Are you aware if the recent works carries a valid warranty

  • Overall condition of roof (1 = Poor; 5 = Excellent)

  • Photograph of the front of the store

  • Type of access used to access the roof

  • Ensure segregation is utilised to protect the public and / or store colleagues

  • Are roof lights or fragile surfaces present

  • Can operatives undertake the works at hand whilst maintaining a safe working distance from the fragile surfaces? (2 meters)

  • Ensure safe working distance from any fragile surfaces at all times

  • Do not access the roof

  • Client store representative who has confirmed authorisation to access the roof

  • Roof construction materials

  • Gutter type

  • Are outlet covers present

  • Photographs of gutter conditions prior to clean

  • Photographs of gutter conditions after to clean

  • Have all leaf guards / hoppers been cleaned and cleared of debris?

  • Full description of works carried out

  • Are there any overflow outlets present on the roof

  • Is there any cut edge corrosion present to any roof sheets?

  • Is there any damage to any capping or flashing details?

Sign Off Sheet

Checklist

  • Works completed

  • Photographs taken

  • Test certificates

  • Install complete

  • Works signed-off

Work Times

  • Travel Time (Hours)

  • Time on site

  • Time off site

Works Undertaken

  • Description of works carried out

  • Material used

  • Plant used

  • Is additional works required

  • In-depth description of additional works required:

  • Please complete additional survey template to capture the in-depth additional works required

Signatures

  • Store representative

  • Key representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.