Project Information
-
Form type:
-
Attendance Date:
-
Client:
Store Details
-
Store Name:
-
Store Number:
-
Location:
Project Number(s)
-
Client Project Number:
-
Key Project Number:
Operatives
-
Primary Roofing Operative (Full Name):
-
Secondary Roofing Operative (Full Name):
Health & Safety Checklist
Health & Safety Checklist
-
Is a permit or third party authorisation required to access to the roof?
-
Is a permit or written authorisation in place?
-
Do not access the roof
-
Provide contact details for permit / authorisation to be obtained (Name, Email Address, Contact Number, Documents Required)
-
Is the asbestos register available?
-
Review asbestos register
-
Has the RAAC registers been checked?
-
Can the roof be accessed safely?
-
If the roof cannot be accessed what further measures are required?
-
Is temporary fall protection required and available?
-
What fall protection is in place?
- Parapet Wall(s)
- Wall(s)
- Fence(s)
- Handrail
- Roof Rail
- Safety Line
- None Present
-
Is the safety line inspection tag in place and in date?
-
Do not use the safety line
-
Is temporary fall protection required and available?
-
Is a harness and lanyard required and are they available?
-
Is a MEWP required to carry out the work?
-
Are MEWP operators IPAF trained?
-
Are there any fragile surfaces?
-
What precautions to prevent falls are in place?
-
Do the weather conditions fall within limits stated in RAMS?
-
Have all operatives been briefed on the RAMS?
-
Can materials be taken to the roof safely?
-
Is all waste removed from the roof?
Survey
-
Form Type:
-
Photograph of the front of the store
-
Has drone footage been captured of the roof
-
Please advise why footage could not be captured
General
Building Details
-
Estimated build date (Leave blank if unknown)
-
Is the property over 20 years old
-
Roof ownership
-
Is a roof register present
-
Is the roof register being actively used
-
Type of access used to access the roof
- Van mounted MEWP
- External Staircase
- Internal Staircase
- Roof Hatch
- Cat Ladder
- Ship Ladder
- Maintenance door (Level access)
- Lift
- MEWP access
-
Ensure segregation is utilised to protect the public and / or store colleagues
-
Are roof lights or fragile surfaces present
-
Can operatives undertake the works at hand whilst maintaining a safe working distance from the fragile surfaces?
-
Ensure safe working distance from any fragile surfaces at all times
-
Do not access the roof
-
Client store representative who has confirmed authorisation to access the roof
-
Are there any defined walkways
Roof Construction
-
Roof construction materials
- Asphalt
- Coated
- Composite Panels
- Concrete
- EDPM
- EPF Membrane
- Fibreglass Coating
- Flags
- Foam Insulation Boards
- Pebbles
- Plywood lined
- Rubber
- Slabs
- Slate / Tiles
- Solar paint
- Standing seam sheets
- Steel Sheeting
-
Other roof materials
- Asphalt
- Coated
- Composite Panels
- Concrete
- EDPM
- EPF Membrane
- Fibreglass Coating
- Flags
- Foam Insulation Boards
- Pebbles
- Plywood lined
- Rubber
- Slabs
- Slate / Tiles
- Solar paint
- Standing seam sheets
- Steel Sheeting
-
Gutter type
-
Are outlet covers present
-
Are there any overflow outlets present on the roof
Works undertaken
-
Photographs of roof and gutters conditions prior to clean
-
Photographs of roof and gutters conditions after to clean
-
Full description of works carried out
-
Are all gutters (valley & trough) clear
-
Have all leaf guards / hoppers been cleaned and cleared of debris?
Roof Condition
-
Is there any cut edge corrosion present to any roof sheets?
-
Is there any damage to any capping details?
-
Is there any damage to any flashing details?
-
Notes on existing coursework pointing
-
Are there any related issues that are deemed essential and may compromise store trading?
-
Description of issues deemed essential and / or may compromise store trading
-
Please complete a separate survey template capturing as much detail as possible
-
Are there any roof leaks reported by the store
-
Where are the reported leaks within the store
-
Provide annotated google screenshot showing the leak locations
-
Is there any debris discarded on the roof
-
Are there any apparent pest issues (For example bird activity)
-
Are there any poor installs with regards to plant and the interface with the roof
-
Is there evidence of recent works to the roof
-
Are you aware if the recent works carries a valid warranty
-
Photograph of the front of the store
-
Type of access used to access the roof
- Van mounted MEWP
- External Staircase
- Internal Staircase
- Roof Hatch
- Cat Ladder
- Ship Ladder
- Maintenance door (Level access)
- Lift
- MEWP access
-
Ensure segregation is utilised to protect the public and / or store colleagues
-
Are roof lights or fragile surfaces present
-
Can operatives undertake the works at hand whilst maintaining a safe working distance from the fragile surfaces? (2 meters)
-
Ensure safe working distance from any fragile surfaces at all times
-
Do not access the roof
-
Client store representative who has confirmed authorisation to access the roof
-
Roof construction materials
- Asphalt
- Coated
- Composite Panels
- Concrete
- EDPM
- EPF Membrane
- Fibreglass Coating
- Flags
- Foam Insulation Boards
- Pebbles
- Plywood lined
- Rubber
- Slabs
- Slate / Tiles
- Solar paint
- Standing seam sheets
- Steel Sheeting
-
Gutter type
-
Are outlet covers present
-
Photographs of gutter conditions prior to clean
-
Photographs of gutter conditions after to clean
-
Have all leaf guards / hoppers been cleaned and cleared of debris?
-
Full description of works carried out
-
Are there any overflow outlets present on the roof
-
Is there any cut edge corrosion present to any roof sheets?
-
Is there any damage to any capping or flashing details?
Sign Off Sheet
Checklist
-
Works completed
-
Photographs taken
-
Test certificates
-
Install complete
-
Works signed-off
Work Times
-
Travel Time (Hours)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Time on site
-
Time off site
Works Undertaken
-
Description of works carried out
-
Material used
-
Plant used
-
Is additional works required
-
In-depth description of additional works required:
-
Please complete additional survey template to capture the in-depth additional works required
Signatures
-
Store representative
-
Key representative