Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Shop Details

  • Select date

  • Add location
  • Shop name

  • Photo location on server

Landlord information required to be supplied

  • Part 6 (Dangerous Material Schedule)

  • Plan indicating common areas

  • Fire engineer report

  • Structural plans showing all structural columns and beams within shop zone

  • Services plans Mechanical, Electrical and Hydraulic

  • Site survey

  • Roof inspection report

Internal items

  • Exit lighting in place and test switch

  • Back of House area

  • Toilets areas and in working order

  • Side tenancies wall blanked off

  • Evidence of roof leaks

  • Tenancy walls straight and flush plaster

  • Ceilings level and straight (nominate height in notes)<br>

  • All redundant services removed

  • Subfloor flush and level

  • Internal wall and fixtures removed

Services

  • Mechanical System operational and as per requirements

  • Mains Power Board operational and as per requirements

  • Fire sprinklers installed and to code

External works

  • Rear entrance

  • Street site

  • Shopfront glazing in place

  • Entry doors in good location

  • Entry doors in working order

  • Locks and cylinders in working order

  • Entrys DDA compliment

Other items / notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.